Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010H019 + (10:43:31, 21 December 2024)
- ML20010H018 + (10:43:33, 21 December 2024)
- ML20010H016 + (10:43:34, 21 December 2024)
- ML20010H015 + (10:43:35, 21 December 2024)
- ML20010H013 + (10:43:36, 21 December 2024)
- ML20010H012 + (10:43:37, 21 December 2024)
- ML20010H010 + (10:43:38, 21 December 2024)
- ML20010H008 + (10:43:40, 21 December 2024)
- ML20010H009 + (10:43:40, 21 December 2024)
- ML20010H007 + (10:43:41, 21 December 2024)
- ML20010H006 + (10:43:41, 21 December 2024)
- 05000333/LER-1981-065-03, /03L-0:on 810814,during Administrative Review Discovered That Some Surveillance Testing of Check Valves in Rhr,Core Spray,Hpci & Reactor Core Isolation Cooling Had Not Been Conducted.Caused by Procedural Error.Tests Performe + (10:43:43, 21 December 2024)
- 0CAN088113, Responds to NRC 810606 & 0721 Ltrs Re Violations Noted in IE Insp Repts 50-313/81-17 & 50-368/81-15.Corrective Actions:Food Crop Samples Will Be Added to Annual Environ Sampling Schedule for Samples Collected by Personnel + (10:43:44, 21 December 2024)
- 05000333/LER-1981-065, Forwards LER 81-065/03L-0 + (10:43:47, 21 December 2024)
- ML20010G998 + (10:43:48, 21 December 2024)
- ML20010G994 + (10:44:05, 21 December 2024)
- ML20010G992 + (10:44:06, 21 December 2024)
- ML20010G991 + (10:44:07, 21 December 2024)
- ML20010G989 + (10:44:15, 21 December 2024)
- ML20010G988 + (10:44:16, 21 December 2024)
- ML20010G984 + (10:44:19, 21 December 2024)
- ML20010G983 + (10:44:20, 21 December 2024)
- ML20010G982 + (10:44:26, 21 December 2024)
- ML20010G981 + (10:44:26, 21 December 2024)
- ML20010G978 + (10:44:35, 21 December 2024)
- 05000260/LER-1981-035-01, Scram Discharge Instrument Vol Tank Level Switch 2-LS-85-45F Failed to Operate Per IE Bulletin 80-14 During Maint Outage.Caused by Inoperable Level Switch SL-305-EI-X.Switch Replaced + (10:44:37, 21 December 2024)
- 05000324/LER-1981-065-01, /01T-0:on 810827,HPCI Steam Line Area Differential Temp Switch E51-dTS-N604D Found Inoperable & Trouble Ticket Initiated.Hpci Not Isolated Until 5-h Later.Caused by Failure to Perform Adequate & Timely Review of Ticket + (10:44:40, 21 December 2024)
- ML20010G975 + (10:44:46, 21 December 2024)
- ML20010G974 + (10:44:47, 21 December 2024)
- 05000324/LER-1981-065, Forwards LER 81-065/01T-0 + (10:44:48, 21 December 2024)
- 05000369/LER-1981-138-03, /03L-0:on 810811,tubing Going from Discharge Line of Train a Nuclear Svc Water Rn Sys Pump to Inboard Pump Seals Discovered Leaking Due to Loose Fitting,Rendering Pump Inoperable.Cause Unknown.Fitting Tightened + (10:44:50, 21 December 2024)
- 05000260/LER-1981-035, Forwards Updated LER 81-035/01X-1,per IEB-80-14 + (10:44:52, 21 December 2024)
- ML20010G966 + (10:44:59, 21 December 2024)
- 05000369/LER-1981-138, Forwards LER 81-138/03L-0 + (10:45:00, 21 December 2024)
- ML20010G962 + (10:45:02, 21 December 2024)
- TAC:45896 + (10:45:02, 21 December 2024)
- ML20010G961 + (10:45:08, 21 December 2024)
- ML20010G960 + (10:45:14, 21 December 2024)
- 05000369/LER-1981-137-03, /03L-0:on 810810,train B of Control Room Area Ventilation Sys Failed to Start & Declared Inoperable.Cause Unknown.Maint Completed Checkout of Sys Oil Levels & Pressures + (10:45:16, 21 December 2024)
- ML20010G958 + (10:45:16, 21 December 2024)
- ML20010G956 + (10:45:22, 21 December 2024)
- ML20010G955 + (10:45:23, 21 December 2024)
- 05000369/LER-1981-137, Forwards LER 81-137/03L-0 + (10:45:24, 21 December 2024)
- ML20010G952 + (10:45:31, 21 December 2024)
- ML20010G951 + (10:45:33, 21 December 2024)
- ML20010G949 + (10:45:38, 21 December 2024)
- ML20010G945 + (10:45:51, 21 December 2024)
- 0CAN088105, Forwards Proprietary Version of Slide Presentation Re Facility Security Sys Made During 810623 Nrc/Util Meeting Concerning IE Insp Repts 50-313/81-09 & 50-368/81-08. Slide Presentation Withheld (Ref 10CFR2.790) + (10:45:58, 21 December 2024)
- PNO-I-81-104, on 810916,found Two Reactor Core Isolation Cooling Steam Isolation Valves Remained Open W/O Sufficient Assurance Valves Would Have Closed for on Isolation Signals.Caused by de-energized Faulted Bus Section + (10:45:58, 21 December 2024)
- 05000259/LER-1981-046-03, /03L-0:on 810816,CAM 1-RM-90-250 Declared Inoperable for 12.5-h.Caused by Pump Failure & Unavailability of Spare.Schwitzer Model 325 Vacuum Pump Replaced + (10:46:01, 21 December 2024)
- 05000259/LER-1981-046, Forwards LER 81-046/03L-0 + (10:46:04, 21 December 2024)