Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 2016-10, License Amendment Requests for Changes to Emergency Response Organization Staffing and Augmentation + (2,016)
- Information Notice 2017-05, : Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature + (2,017)
- Information Notice 2017-06, Battery and Battery Charger Short Circuit Current Contributions to a Fault on the DC Distribution System + (2,017)
- Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature + (2,017)
- Information Notice 2017-03, Anchor/Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures + (2,017)
- Information Notice 2017-02, Best Practices Concepts for Patient Release + (2,017)
- Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact NT and NW 480-VAC Circuit Breaker Anti-Pump Feature + (2,017)
- Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-VAC Circuit Breaker Anti-Pump Feature + (2,017)
- RIS 2017-05, Administration of 10 CFR Part 72 Certificate of Compliance Corrections and Revisions + (2,017)
- RIS 2017-02, Applicability of Title 10 of the Code of Federal Regulations Part 37 to Non-Manufacturing and Distribution Service Provider Licensees + (2,017)
- RIS 2017-08, Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing A0plications for Light-Water Reactors and Non-Light Water Reactors + (2,017)
- RIS 2017-04, Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components + (2,017)
- RIS 2017-01, Human Reliability and Human Performance Database + (2,017)
- Information Notice 2017-04, High Energy Arc Faults in Electrical Equipment Containing Aluminum Components + (2,017)
- Information Notice 2017-01, Reactor Coolant System Leakage from a Control Rod Drive Threaded Connection + (2,017)
- RIS 2017-03, Preparation and Scheduling of Operator Licensing Examinations + (2,017)
- Information Notice 2018-01, Noble Fission Gas Releases During Spent Fuel Cask Loading Operations + (2,018)
- Information Notice 2018-02, Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves + (2,018)
- Information Notice 2018-03, Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions + (2,018)
- Information Notice 2018-04, Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions + (2,018)
- RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations + (2,018)
- Information Notice 2018-05, Unanalyzed or Improperly Analyzed Conditions at Fuel Cycle Facilities + (2,018)
- Information Notice 2018-06, Determination of Management Measures for Process Isolation Controls Designated as Items Relied on for Safety and Implementation of Adequate Quality Assurance Measures for Plant Features and Procedures + (2,018)
- RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material + (2,018)
- Information Notice 2018-08, Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box + (2,018)
- Information Notice 2018-07, Pump/Turbine Bearing Oil Sight Glass Problems + (2,018)
- Information Notice 2018-10, Thermal Sleeve Flange Wear Leads to Stuck Control Rod at Foreign Nuclear Plant + (2,018)
- Information Notice 2018-09, Electrical Arc Flash Caused by Foreign Material Damages Fire Door + (2,018)
- RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections + (2,018)
- RIS 2018-06, Clarification of the Requirements for Reactor Vessel Upper Head Bare Metal Visual Examinations + (2,018)
- Information Notice 2018-11, Kobe Steel Quality Assurance Record Falsification + (2,018)
- RIS 2018-01, Common Violations Cited During First 2 Years of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, Implementation and Guidance Documents Available to Support + (2,018)
- RIS 2019-01, Analysis of Public Comments on Draft NRC Regulatory Issue Summary 2019-01, Clarification of Export Reporting Requirements for Nuclear Facilities, Equipment, and Non-Nuclear Materials + (2,019)
- Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations + (2,019)
- Information Notice 2019-03, Inadequate Implementation of Clearance Processes Results in Configuration Control Issues + (2,019)
- Information Notice 2019-02, Emergency Diesel Generator Excitation System Diode Failures + (2,019)
- Information Notice 2019-07, Methods to Prevent Medical Events + (2,019)
- Information Notice 2019-05, Patient Skin Contamination Events Associated with I-131 During Neuroblastoma Treatments + (2,019)
- Information Notice 2019-06, Potential Over-Pressurization of High Specific-Activity Alpha-Emitting Radioactivity Sources + (2,019)
- Information Notice 2019-04, Effective Cyber Security Practices to Protect Digital Assets of Byproduct Materials Licensees + (2,019)
- Information Notice 2019-08, Flow-Accelerated Corrosion Events + (2,019)
- Information Notice 2019-09, Spent Fuel Cask Movement Issues + (2,019)
- RIS 2019-03, Pre-Application Communication and Scheduling for Accident Tolerant Fuel Submittals + (2,019)
- Information Notice 2019-10, Failures Reported in Eaton/Cutler Hammer A200 and Freedom Series Contactors + (2,019)
- Information Notice 2019-11, Strontium-82/Rubidium-82 Generator Elution Events and Issues + (2,019)
- Information Notice 2019-12, Recent Reported Medical Events Involving the Administration of Yttrium-90 Microspheres for Therapeutic Medical Procedure + (2,019)
- RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations + (2,019)
- RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations + (2,020)
- Information Notice 2020-01, Increased Electronic Equipment Issues After Electrostatic Cleaning + (2,020)
- Information Notice 2020-02, Flex Diesel Generator Operational Challenges + (2,020)
- Information Notice 2020-03, Recall of Mechanical Rate of Rise and Fixed-Temperature Heat Detectors + (2,020)
- Information Notice 2020-04, Operating Experience Regarding Failure of Buried Fire Protection Main Yard Piping + (2,020)
- RIS 2020-11, NRC Emergency Telecommunications System + (2,020)
- RIS 2021-01, Preparation and Scheduling of Operator Licensing Examinations + (2,021)
- Information Notice 2021-02, Recent Issues Associated with Monitoring Occupational Exposure to Radiation from Licensed and Unlicensed Radiation Sources + (2,021)
- Information Notice 2021-03, Operating Experience Related to the Duane Arnold Energy Center Derecho Event on August 10, 2020 + (2,021)
- Information Notice 2021-01, Lessons Learned from U.S. Nuclear Regulatory Commission Inspections of Design-Basis Capability of Power-Operated Valves at Nuclear Power Plants + (2,021)
- RIS 2022-01, Preparation and Scheduling of Operator Licensing Examinations + (2,022)
- RIS 2022-03, NRC Plans to Establish Controlled Unclassified Information-Sharing Agreements with Non-Executive Branch Entities + (2,022)
- RIS 2022-02, Operational Leakage + (2,022)
- Information Notice 2022-02, Operating Experience Related to the Unexpected Loss of Operating Security Power Due to Inadequate Testing and Maintenance + (2,022)
- Information Notice 2023-01, Risk Insights from High Energy Arcing Fault Operating Experience and Analyses + (2,023)
- Information Notice 2023-02, Reporting When a Fixed Gauge Shutter Is Stuck in the Closed Position + (2,023)
- RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations + (2,023)
- RIS 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels + (2,023)