Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2013-13, Rev.1, Deficiencies With Effluent Radiation Monitoring System Instrumentation +
- Information Notice 2013-17, Significant Plant Transient Induced By Safety-Related Direct Current Bus Maintenance At Power +
- Information Notice 2013-21, Welding Problems During Fabrication of Reactor Plant Components +
- Information Notice 2013-14, Potential Design Deficiency In Motor-Operated Valve Control Circuitry +
- Information Notice 2013-15, Willful Misconduct / Record Falsification and Nuclear Safety Culture +
- Information Notice 2013-12, Improperly Sloped Instrument Sensing Lines +
- Information Notice 2013-18, Refueling Water Storage Tank Degradation +
- Information Notice 2013-08, Enclosulist of Recently Issued FSME Generic Communications +
- Information Notice 2013-09, Compressed Flammable Gas Cylinders and Hazards +
- Information Notice 2013-16, Importance of Verification of Treatment Parameters for High Dose-Rate Remoter Afterloader Administrations +
- Information Notice 2013-06, Issues With Air and Water Interaction in Fire Protection Sprinkler Systems +
- Information Notice 2013-10, Programs for Monitoring Boiling-Water Reactor Steam Dryer Integrity +
- Information Notice 2013-04, Concrete Subsurface Laminar Cracking Caused By Moisture Intrusion and Freezing +
- Information Notice 2013-01, Emergency Action Level Thresholds Outside The Range Of Radiation Monitors +
- Information Notice 2013-02, Issues Potentially Affecting Nuclear Facility Fire Safety +
- Information Notice 2013-03, Recent Issue With the Definition of Core Quadrant +
- Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) +
- Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) +
- Information Notice 2013-13, Rev.1, Deficiencies with Effluent Radiation Monitoring System Instrumentation +
- Information Notice 2013-21, Welding Problems during Fabrication of Reactor Plant Components +
- Information Notice 2013-08, EnclosuList of Recently Issued FSME Generic Communications +
- Information Notice 2013-06, Issues with Air and Water Interaction in Fire Protection Sprinkler Systems +
- Information Notice 2013-04, Concrete Subsurface Laminar Cracking Caused by Moisture Intrusion and Freezing +
- Information Notice 2013-07, Premature Degradation of Spent Fuel Storage Cask Structures and Components from Environmental Moisture +
- Information Notice 2013-03, Recent Issue with the Definition of Core Quadrant +
- Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) +
- Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) +
- RIS 2013-18, Withdrawn NRC Regulatory Issue Summary 2013-18 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs +
- RIS 2013-14, Reporting Transactions Involving Temporary Jobsites to the National Source Tracking System +
- RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines For Effective Prevention and Management of System Gas Accumulation +
- RIS 2013-12, Notice of Issuance of Enforcement Guidance Memo-Interim Guidance for Dispositioning Violations Involving 10 CFR 35.60 & 10 CFR 35.63 for the Calibration of Instrumentation to Measure the Activity of Rb-82 and the Determ. of Rb-82 Pt Dosa +
- RIS 2013-06, Withdrawn NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations +
- RIS 2013-11, Fuel Assembly Resolution of Top Nozzle Stress Corrosion Cracking Handling for Dry Cask Spent Fuel Storage and Transportation +
- RIS 2013-03, Pre-Application Communication and Scheduling for Medical Radioisotope Production Facilities Intending to Produce Molybdenum-99 +
- RIS 2013-08, Withdrawn RIS 2013-08, Process for Scheduling Acceptance Reviews of New Reactor Licensing and Design Certification Applications and Process for Determining Budget Needs for Fiscal Year 2016 +
- RIS 2013-05, NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability +
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages +
- RIS 2013-07, NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark +
- Information Notice 2013-05, Battery Expected Life and Its Potential Impact on Surveillance Requirements +
- RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown +
- RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between The NRC And NRC Stakeholders During a Lapse Of Agency Appropriations +
- Information Notice 2013-17, Significant Plant Transient Induced by Safety-Related Direct Current Bus Maintenance at Power +
- RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines for Effective Prevention and Management of System Gas Accumulation +
- Information Notice 2013-14, Potential Design Deficiency in Motor-Operated Valve Control Circuitry +
- RIS 2013-04, Content Specification and Shielding Evaluations for Type B Transportation Packages +
- Information Notice 2013-01, Emergency Action Level Thresholds Outside the Range of Radiation Monitors +
- Information Notice 2013-11, Crack-like Indications at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes +
- Information Notice 2013-20, Steam Generator Channel Head and Tubesheet Degradation +
- RIS 2013-19, Removal of Safeguards Information Designation from Attachment to Order EA-02-261, Order for Compensatory Measures Related to Access Authorization +
- RIS 2013-10, Permanent Implant Brachytherapy Medical Event Reporting Under 10 CFR Part 35 +