PLA-5798, Updated Submittal of the Plant Physical Security Plan Revision 0 PLA-5798

From kanterella
Jump to navigation Jump to search
Updated Submittal of the Plant Physical Security Plan Revision 0 PLA-5798
ML042510409
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/30/2004
From: Shriver B
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
PLA-5798
Download: ML042510409 (4)


Text

Bryce L. Shriver Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3120 Fax 570.542.1504 bishrverQpplweb.com I

j

'. ~I I I

% SaaI.-

mm --

M. w SAFEGUARDS INFORMATION August 30, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-Pl-17 Washington DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UPDATED SUBMITTAL OF THE SUSQUEHANNA STEAM ELECTRIC STATION PHYSICAL SECURITY PLAN REVISION 0 PLA-5798 Docket Nos. 50-387 and 50-388

References:

1)

P1A-5730, B. L Shriver (PPL) to USNRC, "Supplemental Response to the April 23, 2003, Orders to the Susquehanna Steam Electric Station, "

dated April 28, 2004.

2) Letterfrom M. H. Chernoff (NRC) to R. M. Ferentz (PPL), "Requestfor Additional Information (RAI) RE: Security Plan Sections 10-19 (TAC NOS. MC 2979 and MC 2980), " dated June 21, 2004.
3) Letterfrom M. H. Chernoff (NRC) to R. M. Ferentz (PPL), "RequestforAdditional Infonnation (RAI) RE: Security Plan Sections 1-9 (TAC NOS. MC 2979 and MC 2980),"

dated June 22, 2004.

4) PLA -5782, B. L Shriver (PPL) to USNRC, "Response to NRC Requestfor Additional Infornation (RAI) RE: Security Plan Sections 1-9(TAC NOS. MC 2979 and MC 2980) andNRCRAI) RE: Security Plan Sections 10-J9(TACNOS. MC 2979 and MC 2980),"

dated July 7, 2004

5) Letterfrom M. H. Chernoff (NRC) to R. M. Ferentz (PPL), "Requestfor Additional Information RE: Training and Qualification Plan (TAC NOS. MC 2979 and MC 2980),"

dated July 9, 2004

6) PLA-5788, B. L Shriver (PPL) to USNRC, "Supplemental Response to PLA-5782 Dated July 7, 2004 and Response to NRC Requestfor Additional Infornation RE: Training and Qualification Plan (TA C NOS. MC 2979 and MC 2980), " dated July 26, 2004
7) Letterfrom M. H. Chernoff (NRC) to R. M. Ferentz (PPL), "Requestfor Additional Information (RAI) RE: Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan (TAC NOS. MC 2979 and MC 2980), " dated July 23, 2004
8) PLA4-5792, B. T. McKinney (PPL) to USNRC, "Response to NRC Requestfor Additional Information RE: Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan (TA CNOS. MC 2979 and MC 2980), " dated August 9, 2004 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED".

SAFEGUARDS INFORMATION A)S/A*

I-Document Control Desk PLA-5798 SAFEGUARDS INFORMATION The purpose of this letter is to provide an updated submittal of the PPL Susquehanna, LLC Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility (PPL Susquehanna, LLC PSP) Revision 0 as stated in References 1, 4, 6 and 8 above.

The updated submittal to the PPL Susquehanna, LLC PSP revision 0 is included on a CD-ROM as Enclosure I to this letter. A listing of the sections that were updated is included in Attachment A of this letter.

The updated submittal incorporates the responses that had been deferred to accommodate resolution of PPL Frequently Asked Questions (FAQs) by the industry Security FAQ panel. The updated submittal also incorporates any responses in References 4, 6 or 8 that were altered as a result of final resolutions to any of the FAQs by the industry Security FAQ panel. These changes were discussed and agreed upon in an August 11, 2004 telephone conversation and in an August 16, 2004 telephone conversation with Ms. M. H.

Chernoff of the NRC staff.

If you have any questions, please contact Mr. Joseph Meter at (570) 542-1873 or Mr.

Brian McBride at (570) 542-3977.

In accordance with 10 CFR 2.202(b), the following affirmation is provided.

Bryce L. Shriver states that he is the Sr. Vice President and Chief Nuclear Officer of PPL Susquehanna, LLC, is authorized to execute this oath on behalf of PPL and, to the best of his knowledge and belief, the facts set forth in this letter are true.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

bQLlL Bryce L. Shriver SAFEGUARDS INFORMATION Document Control Desk PLA-5798 SAFEGUARDS INFORMATION :

August 2004 Updated Submittal of the PPL Susquehanna, LLC Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility Revision 0. A total of one (1) CD-ROM is included in this submission. The CD-ROM labeled "August 2004 PPL Physical Security Plan" contains the following files:

001 08-04 PPL PSP.pdf, 1,188KB, (Safeguards)

Attachment A:

Listing of the Updated Sections of the PPL Susquehanna, LLC Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility Revision 0.

copy: NRC Region I Mr. A. J. Blamey, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP w/o enclosure w/o enclosure w/o enclosure w/o enclosure SAFEGUARDS INFORMATION Document Control Desk PLA-5798 SAFEGUARDS INFORMATION bec:

R. L. Anderson NUCSB3 T. L. Harpster NUCSA4 J. E. Lines NUCAF G. M. Machalick NUCSB2 B. T. McKinney NUCSB3 R. R. Sgarro GENPL4 B. A. Snapp GENTW3 T. G. Wales (DBD) GENPL4 A. J. Wrape GENPL4 R. M. Ferentz NUCNG T. A. Gorman GENPL5 NRA GENPL4 DCS GENPL4 Attn: R. Beidleman w/o enclosure w/o enclosure w/o enclosure w/o enclosure w/o enclosure w/o enclosure w/o enclosure v/o enclosure w/o enclosure SAFEGUARDS INFORMATION