A Southern Nuclear Cheryl A. Gayheart Regulatory Affairs Director to this letter contains Proprietary Information to be withheld from public disclosure per 10 CFR 2.390. When separated from Enclosure 1 this transmittal document is decontrolled.

MAR 1 0 2020 Docket No.:

50-321 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 30 Core Operating Limits Report Version 1.0 Ladies and Gentlemen:

.1535 Co lonn ad~ P:.rl-.11 a~

Birmingham. 1\\L 3-:2-13

~05 992 53 16 tel

20. 992 7795 li1' caga~ h\\!afc?southcmco c-om NL-20-0241 In accordance with Technical Specification 5.6.5.d., Southern Nuclear Operating Company (SNC) submits the enclosed Core Operating Limits Report (COLR), for Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Cycle 30, Version 1.0.

The enclosed documentation contains proprietary information as defined by 10 CFR 2.390.

Global Nuclear Fuel (GNF), as the owner of the proprietary information, has executed the enclosed affidavit, which identifies that the enclosed proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The proprietary information was provided to SNC in a GNF transmittal that is referenced by the affidavit. The proprietary information has been faithfully reproduced in the enclosed documentation, such that, the affidavit remains applicable. GNF hereby requests that the enclosed proprietary information provided in Enclosure 1 to this letter be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. A non-proprietary version of the COLR is provided as Enclosure 2. This affidavit is also provided in Enclosure 1 to this letter and identifies that the designated information has been handled and classified as proprietary to GNF.

This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611.

Respectfully submitted, ayheart Regulatory Affairs Director

U. S. Nuclear Regulatory Commission NL-20-0241 Page 2 CAG/TLE/scm

Enclosures:

1. Unit 1 Cycle 30 Core Operating Limits Report Version 1.0 PROPRIETARY INFORMATION and Global Nuclear Fuel - Americas Affidavit
2. Unit 1 Cycle 30 Core Operating Limits Report Version 1.0 NON-PROPRIETARY INFORMATION Cc:

Regional Administrator, Region II NRR Project Manager - Hatch Senior Resident Inspector-Hatch RTYPE: CHA02.004

Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 30 Core Operating Limits Report Version 1.0 Unit 1 Cycle 30 Core Operating Limits Report Version 1.0 NON-PROPRIETARY INFORMATION

Non-Proprietary Information SOUTHERN NUCLEAR OPERATING COMPANY EDWIN I. HATCH NUCLEAR PLANT Unit 1 Cycle 30 CORE OPERATING LIMITS REPORT Version 1

Plant Hatch Unit 1 Cycle 30 Section 1.0 2.0 3.0 4.0 5.0 6.0 Non-Proprietary Information TABLE OF CONTENTS Title Introduction APLHGR Operating Limits MCPR Operating Limits LHGR Operating Limits Operating Pressure Limits References 2

Core Operating Limits Report Version 1 Page 6

10 12 29 39 43

Plant Hatch Unit 1 Cycle 30 Table No.

1-1 1-2 1-3 1-4 3-1 3-2 3-3 3-4 4-1 4-2 4-3 5-1 5-2 Non-Proprietary Information Core Operating Limits Report Version 1 TABLES Title Page System Operability Requirements 7

Equipment Requirements 7

Equipment-Out-of-Service Limitations 8

Exposure Definitions 9

Cycle-Specific MCPR Safety Limit 14 Power-Dependent MCPRp Limit Operating Flexibility Options (for Core Power ~ 28% of Rated) 14 Power-Dependent Kp MCPR Limit Multiplier Flexibility Options (for Core Power > 28% of Rated) 14 Rated-Power OLMCPR Operating Flexibility Options 15 Rated-Power LHGR Limits versus Peak Pellet Exposure 30 Flow-Dependent LHGRFACF Limit Multiplier Operating Flexibility Options 31 Power-Dependent LHGRFACp Limit Multiplier Operating Flexibility Options 31 Pressure Dependent Operating Flexibility Options 42 MFLCPR and MFLPD Limits versus Operating Pressure Regions 42 3

Plant Hatch Unit 1 Cycle 30 Figure No.

2-1 3-1 3-2A 3-28 3-3A 3-38 3-4A-1 3-4A-2 3-4A-3 3-4A-4 3-48-1 3-48-2 3-48-3 Non-Proprietary Information Core Operating Limits Report Version 1 FIGURES Title Page APLHGR Limits versus Average Planar Exposure 11 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 16 Power-Dependent MCPR Limit (MCPRp) versus Core Power 17 Power-Dependent MCPR Limit (MCPRp) versus Core Power (Main Turbine Bypass System Inoperable) 18 Power-Dependent MCPR Limit Multiplier (KP) versus Core Power 19 Power-Dependent MCPR Limit Multiplier (KP) versus Core Power (Main Turbine Pressure Regulator System in TLCO 3. 3.13.c) 20 Rated-Power TLO MCPR Limits versus Average SCRAM Time 21 Rated-Power TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 22 Rated-Power TLO MCPR Limits versus Average SCRAM Time (EOC-RPT System Inoperable) 23 Rated-Power TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable &

EOC-RPT System Inoperable) 24 Rated-Power SLO MCPR Limits versus Average SCRAM Time 25 Rated-Power SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 26 Rated-Power SLO MCPR Limits versus Average SCRAM Time (EOC-RPT System Inoperable) 27 4

Plant Hatch Unit 1 Cycle 30 Figure No.

3-48-4 4-1A 4-18 4-1C 4-2A 4-28 4-3A 4-38 5-1 Non-Proprietary Information Core Operating Limits Report Version 1 Title Page Rated-Power SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable &

EOC-RPT System Inoperable) 28 GNF2 Flow-Dependent LHGR Limit Multiplier (LHGRFACF) versus Core Flow 32 GNF2 Flow-Dependent LHGR Limit Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 33 GNF3 Flow-Dependent LHGR Limit Multiplier (LHGRFACF) versus Core Flow 34 GNF2 Power-Dependent LHGR Limit Multiplier (LHGRFACp) versus Core Power 35 GNF3 Power-Dependent LHGR Limit Multiplier (LHGRFACp) versus Core Power 36 GNF2 Rated-Power LHGR Limit versus Peak Pellet Exposure 37 GNF3 Rated-Power LHGR Limit versus Peak Pellet Exposure 38 Licensed Regions of Operating Dome Pressure versus Core Power 41 5

Plant Hatch Unit 1 Cycle 30

1.0 INTRODUCTION

Non-Proprietary Information Core Operating Limits Report Version 1 The Core Operating Limits Report (COLR) for Plant Hatch Unit 1 Cycle 30 is prepared in accordance with the requirements of Technical Specification 5.6.5. The core operating limits presented herein were developed using NRC-approved methods (References 1 through 3).

Results from the reload analyses for the fuel in Unit 1 Cycle 30 are documented in References 4 through 6.

GNF2 fuel limits in this report are applicable to ARMOR and IronClad Lead Test Assemblies (References 7 through 9).

The following core operating limits are included in this report:

a. Average Planar Linear Heat Generation Rate (APLHGR)- Technical Specification 3.2.1
b. Minimum Critical Power Ratio (MCPR)- Technical Specification 3.2.2
c. Linear Heat Generation Rate (LHGR)- Technical Specification 3.2.3 This report also includes limits on the Maximum Fraction of Limiting Critical Power Ratio (MFLCPR) and Maximum Fraction of Limiting Power Density (MFLPD) thermal limit ratios, which may be used in conjunction with the standard core operating limits to allow operation with dome pressure down to 40 psi below nominal.

Related system operability requirements are defined in Table 1-1. Equipment requirements which must be satisfied for the operating limits included in this report to remain applicable are defined in Table 1-2.

Operating limit flexibility options are provided for various equipment out-of-service conditions, dependent on the number of operating recirculation loops, operability of the main turbine bypass system, operability of the End-of-Cycle Recirculation Pump Trip (EOC-RPT) system, and status of the main turbine pressure regulator system. Additional operational limitations associated with use of combinations of equipment out-of-service limits are defined in Table 1-3.

Operating limits are presented in this report as a function of fuel type, core power, core flow, average scram time, and exposure. These limits are not a function of feedwater temperature.

Cycle exposure intervals used in the presentation of limits in this report are defined in Table 1-4.

Operating limits between tabulated values presented in this report are based on linear interpolation.

6

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information Core Operating Limits Report Version 1 TABLE 1-1 System Operability Requirements System Main Turbine Bypass System Operable (Technical Specification 3. 7. 7)

Operability Requirement At least two bypass valves must be operable TABLE 1-2 Equipment Requirements Equipment Requirement The maximum achievable core flow on the highest Recirculation Flow Control System licensed rod line must be limited to less than 1 07% of rated core flow When operating at greater than 55% core thermal Turbine Power/Load Unbalance Trip Logic power, the turbine Power/Load Unbalance (PLU) trip logic must be functional The Oscillation Power Range Monitor (OPRM)

APRM System Period Based Detection Algorithm (PBDA) amplitude trip setpoint must be set equal to 1.15 7

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information Core Operating Limits Report Version 1 TABLE 1-3 Equipment-Out-of-Service Limitations Equipment I Condition Limitation

  • Core power must be ~ 2000 MWth Single-Loop Operation (SLO)

Plant Hatch Unit 1 Cycle 30 Exposure Label BOC MOC1 MOC2 EOR EOC Non-Proprietary Information TABLE 1-4 Exposure Definitions Definition Beginning of Cycle Exposure First Middle of Cycle Exposure Second Middle of Cycle Exposure End of Rated Exposure End of Cycle Exposure 9

Core Operating Limits Report Version 1 Cycle Exposure 0 MWd/ST EOR - 6000 MWd/ST EOR - 3500 MWd/ST Projected exposure at end of rated power with all control rods out, rated core flow, and rated feedwater temperature Exposure at cycle shutdown

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information Core Operating Limits Report Version 1 2.0 APLHGR OPERATING LIMITS (Technical Specification 3.2.1)

For both two loop operation (TLO) and single loop operation (SLO), the APLHGR operating limit for each six inch axial segment of each fuel assembly in the core is the applicable fuel-type-specific APLHGR limit defined in Figure 2-1.

No flow dependent or power dependent APLHGR limit multipliers (MAPFACF or MAPFACp) are required. For SLO, no unique limit on MAPFACF or MAPFACp is required.

These limits apply to operation over the full range of licensed dome pressure regions shown in Figure 5-1.

10

Plant Hatch Unit 1 Cycle 30 Average Planar Exposure (GWd/ST) 0.00 17.15 60.78 63.50 Average Planar Exposure (GWd/ST) 0.00 9.07 21.22 40.82 57.60 63.50 GNF2 APLHGR Limit (kW/ft) 13.78 13.78 6.87 5.50 GNF3 APLHGR Limit (kW/ft) 14.36 13.78 13.01 10.75 8.00 6.00 Non-Proprietary Information Core Operating Limits Report Version 1 15.00 14.00 "

13.00 12.00 11.00 f

..lll: 10.00

t
!

E 9.00

J 0:::

~ 8.00

...J D.

7.00 6.00

~

!!lit.. ' ~~ J GNF3 1-

~

~

I I

GNF2

~~

' ~

~

\\

\\

5.00 4.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 Average Planar Exposure (GWd/ST)

FIGURE 2-1 APLHGR Limits versus Average Planar Exposure 11

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information 3.0 MCPR OPERATING LIMITS (Technical Specification 3.2.2)

Core Operating Limits Report Version 1 The MCPR operating limit (OLMCPR) for each licensed equipment in or out of service operating flexibility combination is independent of fuel type, and is a function of core power, core flow, average scram time, and cycle exposure.

The cycle-specific MCPR safety limits (SLMCPRs) are specified in Table 3-1.

For both two loop operation (TLO) and single loop operation (SLO), the OLMCPR is determined as follows:

a. For 24% ~core power~ 28%, the greater of either:
1) The flow-dependent MCPR limit, MCPRF, as determined by Figure 3-1,

OR

2) The power-dependent MCPR limit, MCPRp, as determined by Table 3-2.
b. For core power> 28%, the greater of either:
1) MCPRF, as determined by Figure 3-1,
2) The product of the power-dependent MCPR limit multiplier (KP), as determined by Table 3-3, and the scram-time dependent rated-power OLMCPR, as determined by Table 3-4.

These limits apply to operation with vessel dome pressure within +/- 10 psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system inoperable, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the OLMCPR defined in this section.

12

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information Core Operating Limits Report Version 1 In the 3-4A and 3-48 figures, Option A scram time rated-power OLMCPRs correspond to

, = 1.0, where, is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to, = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to,. If, has not been determined, Option A limits must be used.

The average scram time of the control rods, 't, is defined as:

't = 0, OR Lave -'tB

___::c..:....._---=..

, whichever is greater.

where:

't A

=

1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36).

I -2

~+1.6 5* cr

  • N,

't g

=

n I

N i i=l where:

~ =

0.822 sec (mean scram time to notch 36 used in the transient analysis).

(J

=

0.018 sec (standard deviation of J..l).

N,

=

total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1.

n

=

number of surveillance tests performed to date in the cycle.

N i

=

number of active control rods measured in the i1h surveillance test.

11 INi'ti

=

i=l

't ave n

I Ni i=l where:

'ti

=

average scram time to notch 36 of all rods in the i1h surveillance test.

13

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information TABLE 3-1 Cycle-Specific MCPR Safety Limit TLO SLO 1.07 1.09 TABLE 3-2 Core Operating Limits Report Version 1 Power-Dependent MCPRp Limit Operating Flexibility Options (for Core Power s 28% of Rated)

Equipment In/Out of Service Main Turbine Main Turbine Pressure EOC-RPT S~stem Figure#

B~ass S~stem Regulator S~stem 012erable 012erable Status Yes 3-2A Yes/No TLCO 3. 3.13.a, b, or c No 3-28 TABLE 3-3 Power-Dependent Kp MCPR Limit Multiplier Flexibility Options (for Core Power > 28% of Rated)

Equipment In/Out of Service Main Turbine EOC-RPT S~stem Main Turbine Pressure Figure#

B~12ass S~stem Regulator S~stem 012erable 012erable Status TLCO 3.3.13.a orb 3-3A Yes/No Yes/No TLCO 3.3.13.c 3-38 14

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information TABLE 3-4 Core Operating Limits Report Version 1 Rated-Power OLMCPR Operating Flexibility Options Equipment In/Out of Service Figure#

TLO SLO Equipment In Service 3-4A-1 3-4B-1 Main Turbine Bypass System Inoperable 3-4A-2 3-4B-2 EOC-RPT System Inoperable 3-4A-3 3-4B-3 Main Turbine Bypass AND EOC-RPT System 3-4A-4 3-4B-4 System Inoperable Inoperable Main Turbine Pressure Regulator System in TLCO 3.3.13.c 3-4A-1 3-4B-1 Main Turbine Bypass 3-4A-2 3-4B-2 System Inoperable EOC-RPT System 3-4A-3 3-4B-3 Main Turbine Pressure Inoperable Regulator System AND in TLCO 3.3.13.c Main Turbine Bypass System Inoperable AND 3-4A-4 3-4B-4 EOC-RPT System Inoperable 15

Plant Hatch Unit 1 Cycle 30 1.60 1.50 ' "'

ct a..

u

~ 1.40

t::

E

J r:t:
iii

'E Q) 1.30 "C c Q) c..

~

0 u:::

1.20 1 10 Non-Proprietary Information

"' ~

Core Operating Limits Report Version 1 I

TLO

_]

30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Core Flow (%of Rated)

Flow (%of Rated)

MCPRF (TLO) 30.0 1.52 85.0 1.20 110.0 1.20 MCPRF(SLO) = MCPRF(TLO) + 0.03 FIGURE 3-1 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 16

Plant Hatch Unit 1 Cycle 30

~

a..

u E

.:i 0:: e; l:

Cll "C

1:

Cll c..

8 Cll

~

0 a..

2.80 2.70 2.60 2.50 2.40 2.30 24.0 Non-Proprietary Information I

Flow ~60% I I Flow <60% I Core Power(%ofRated)

Flow (% of Rated)

Power(% of Rated)

60.0 24.0

~ 28.0

< 60.0 24.0

~ 28.0 Core Operating Limits Report Version 1 I

TLO I

28.0 MCPRp (TLO) 2.40 2.35 2.35 2.35 MCPRp(SLO) = MCPRp(TLO) + 0.03 FIGURE 3-2A Power-Dependent MCPR Limit (MCPRp) versus Core Power 17

Plant Hatch Unit 1 Cycle 30 2.80 2.70

~

I Flow~60%

Non-Proprietary Information I

Core Operating Limits Report Version 1 I

TLO I

c.

u

IE -

2.60

~ ~

E

.:i 0::

~

IE c Ql

'C t::

Ql Q.

~

r!.

Ql 5:

0 c.

2.50 2.40 2.30 24.0 I Fl=~ ~

Core Power(% of Rated)

Flow (%of Rated)

Power (%of Rated)

MCPRp (TLO)

60.0 24.0 2.71

~ 28.0 2.71

< 60.0 24.0 2.64

~ 28.0 2.45 MCPRp(SLO) = MCPRp(TLO) + 0.03 FIGURE 3-28 Power-Dependent MCPR Limit (MCPRp) versus Core Power (Main Turbine Bypass System Inoperable) 18 28.0

Plant Hatch Unit 1 Cycle 30 1.500 1.400

~

~ ""'

~

c. 1.300 E
I
!!1 E
.::i a:::
a.

(.)

1.200

!!1 c Q)

'C s::::

Q) c.

8 1.100 Q)

~

0 a.

1.000 I

28.0 30.0 40.0 Non-Proprietary Information L

~

~

Core Operating Limits Report Version 1

............ ~ "'

50.0 55.0 60.0 70.0 80.0 90.0 100.0 Core Power(% of Rated)

Power(% of Rated)

Kp (TLO/SLO)

> 28.0 1.413 45.0 1.285

55.0 1.285

> 55.0 1.150 60.0 1.150 85.0 1.070 100.0 1.000 FIGURE 3-3A Power-Dependent MCPR Limit Multiplier (KP) versus Core Power 19

Plant Hatch Unit 1 Cycle 30 1.500 1.400

~

~ ~

c. 1.300 E
1
t

E

J a::

c..

()

1.200 1::

Ql "C

c:

Ql c.

~

1.100 Ql

~

0 c..

1.000 28.0 30.0 40.0 Non-Proprietary Information

~

~

~

Core Operating Limits Report Version 1

~

I I

I I

I I

I I

I I

I 50.0 60.0 70.0 80.0 85.0 90.0 100.0 Core Power(% of Rated)

Power(% of Rated)

Kp (TLO/SLO)

> 28.0 1.413 45.0 1.285 60.0 1.285

85.0 1.196

> 85.0 1.085 100.0 1.000 FIGURE 3-38 Power-Dependent MCPR Limit Multiplier (KP) versus Core Power (Main Turbine Pressure Regulator System in TLCO 3.3.13.c) 20

Plant Hatch Unit 1 Cycle 30 1.70 1.65 1.60 1.55

t

.§ 1.50

~

a..

(.J

!: 1.45 1.40 1.35 1.30 0.0 Non-Proprietary Information 0.2 0.4 0.6 Core Operating Limits Report Version 1 0.8 1.70 1.65 1.60 1.55
t

1.50 E

J

~

a..

(.J 1.45 :!:

1.40 1.35 1.30 1.0 Exposure Range Rated OLMCPR(TLO)

't = 0.0

't = 1.0 BOC - MOC1 1.31 1.44 MOC1-MOC2 1.32 1.46 MOC2-EOC 1.36 1.50 FIGURE 3-4A-1 Rated-Power TLO MCPR Limits versus Average SCRAM Time 21

Plant Hatch Unit 1 Cycle 30 E

J 0:::

0...

u 1.70 1.65 1.60 1.55 1.50 1.45 1.40 1.35 1.30 00 Non-Proprietary Information Core Operating Limits Report Version 1 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPRnLo)

't = 0.0

't = 1.0 BOC-MOC1 1.37 1.49 MOC1-MOC2 1.37 1.52 MOC2-EOC 1.40 1.56 FIGURE 3-4A-2 Rated-Power TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 22 1.70 1.65 1.60 1.55

~

1.50.§

-1 0:::

0...

u 1.45 ::!:

1.40 1.35 1.30 1.0

Plant Hatch Unit 1 Cycle 30 1.70 Non-Proprietary Information Core Operating Limits Report Version 1 1.70 1.65 1-------1-----~-------t--------+--------1 1.65

~

E

.J

~

c..

u 1.55 1.50 1.45 1.40 1.35 1.30 0.0 MOC2-EOC 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPR(TLOl

't = 0.0

't = 1.0 BOC-MOC1 1.32 1.51 MOC1-MOC2 1.38 1.57 MOC2-EOC 1.41 1.60 FIGURE 3-4A-3 Rated-Power TLO MCPR Limits versus Average SCRAM Time (EOC-RPT System Inoperable) 23 1.60 1.55 1.50 1.45 1.40 1.35 1.30 1.0

~

E

.J

~

c..

u

Plant Hatch Unit 1 Cycle 30

.'t::

E

J 0::

a..

(,)

E 1.70 1.65 1.60 1.55 1.50 1.45 1.40 1.35 1.30 0.0 Non-Proprietary Information Core Operating Limits Report Version 1 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPRtTLo)

't = 0.0

't = 1.0 BOC-MOC1 1.38 1.56 MOC1-MOC2 1.44 1.62 MOC2-EOC 1.47 1.65 FIGURE 3-4A-4 Rated-Power TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable

& EOC-RPT System Inoperable) 24 1.70 1.65 1.60 1.55 1.50 1.45 1.40 1.35 1.30 1.0

.'t::

E

J 0::

a..

(,)

E

Plant Hatch Unit 1 Cycle 30 E

.J 0::

0..

(.)

iE 1.70 1.65 1.60 1.55 1.50 1.45 1.40 1.35 1.30 0.0 Non-Proprietary Information Core Operating Limits Report Version 1 1.70 1.65 1.60 1 MOC2-EOC 1.55 I MOC1 - MOC2

~

~ --

1.50 E

.J 0::

0..

(.)

~

-' BOC-MOC1 1.45 :iE 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPR(sLO)

't = 0.0

't = 1.0 BOC-MOC1 1.40 1.47 MOC1-MOC2 1.40 1.49 MOC2-EOC 1.40 1.53 FIGURE 3-48-1 Rated-Power SLO MCPR Limits versus Average SCRAM Time 25 1.40 1.35 1.30 1.0

Plant Hatch Unit 1 Cycle 30 E

.J 0::

Q.

(.)

J!E 1.70 1.65 1.60 1.55 1.50 1.45 1.40 1.35 1.30 0.0 Non-Proprietary Information Core Operating Limits Report Version 1 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPR(sLO)

't = 0.0

't = 1.0 BOC-MOC1 1.40 1.52 MOC1-MOC2 1.40 1.55 MOC2-EOC 1.43 1.59 FIGURE 3-48-2 Rated-Power SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 26 1.70 1.65 1.60 1.55 1.50 1.45 1.40 1.35 1.30 1.0 E

.J 0::

Q.

(.)

J!E

Plant Hatch Unit 1 Cycle 30 1.70 Non-Proprietary Information Core Operating Limits Report Version 1 1.70 1.65 1-------+------+------1-----1 MOC2 -EOC 1.65

~

E

.:i 0:::

a.. u

lE 1.60 1.55 1.55

~

1.50 1.50.§

..J 0:::

a..

u 1.45 1.45 :lE 1.40 1.35 1--------+------+------+-------t-------t 1.35 1.30 0.0 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPR(sLO)

't = 0.0

't = 1.0 SOC - MOC1 1.40 1.54 MOC1-MOC2 1.41 1.60 MOC2-EOC 1.44 1.63 FIGURE 3-48-3 Rated-Power SLO MCPR Limits versus Average SCRAM Time (EOC-RPT System Inoperable) 27 1.30 1.0

Plant Hatch Unit 1 Cycle 30 1.55 E 1.50

.:i a:::

0..

u 1.45 Non-Proprietary Information Core Operating Limits Report Version 1 1.70 1.65 1.60 1.55 1.50 E

.:i a:::

0..

u 1.45 ::!:

1.40 1.35 1.30 L------'--------L------'--------'-----____J 1.30 1.0 0.0 0.2 0.4 0.6 0.8 Exposure Range Rated OLMCPR(sLOl

't = 0.0

't = 1.0 BOC-MOC1 1.41 1.59 MOC1-MOC2 1.47 1.65 MOC2-EOC 1.50 1.68 FIGURE 3-48-4 Rated-Power SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable

& EOC-RPT System Inoperable) 28

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information 4.0 LHGR OPERATING LIMITS (Technical Specification 3.2.3)

Core Operating Limits Report Version 1 The LHGR operating limit for each licensed equipment in or out of service operating flexibility combination is independent of average scram time, and is a function of fuel bundle type, fuel rod type, core power, core flow, and pellet exposure.

For both two loop operation (TLO) and single loop operation (SLO), the LHGR operating limit for each six inch axial segment of each fuel rod in the core is the applicable rated-power, rated-flow LHGR limit taken from Table 4-1 multiplied by the smaller of either:

a. The flow-dependent LHGR limit multiplier, LHGRFACF, as determined by Table 4-2,
b. The power-dependent LHGR limit multiplier, LHGRFACP, as determined by Table 4-3.

Table 4-1 shows the exposure-dependent LHGR limits for all fuel types in the core, as a function of initial gadolinium concentration in a six inch segment of a fuel rod. Figures 4-3A and 4-38 show the LHGR limits for both U02 fuel segments and for fuel segments with the highest initial Gd (Gd203) concentrations.

These limits apply to operation with vessel dome pressure within +/- 1 0 psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system inoperable, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the LHGR operating limit defined in this section.

29

Plant Hatch Unit 1 Cycle 30

((

Non-Proprietary Information TABLE 4-1 Core Operating Limits Report Version 1 Rated-Power LHGR Limits versus Peak Pellet Exposure

))

30

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information TABLE 4-2 Core Operating Limits Report Version 1 Flow-Dependent LHGRFACF Limit Multiplier Operating Flexibility Options Equipment In/Out of Service Fuel Type Main Turbine EOC-RPT Main Turbine Figure#

B~eass S~stem S~stem Pressure Reg,ulator Oeerable Oeerable S~stem Status Yes 4-1A GNF2 Yes/No TLCO 3.3.13.a, b, or c No 4-1 B GNF3 Yes/No Yes/No TLCO 3.3.13.a, b, or c 4-1C TABLE 4-3 Power-Dependent LHGRFACp Limit Multiplier Operating Flexibility Options Equipment In/Out of Service Fuel Type Main Turbine EOC-RPT Main Turbine Figure#

B~eass S~stem S~stem Pressure Regulator Oeerable Oeerable S~stem Status GNF2 Yes/No Yes/No TLCO 3.3.13.a, b, or c 4-2A GNF3 Yes/No Yes/No TLCO 3.3.13.a, b, or c 4-28 31

Plant Hatch Unit 1 Cycle 30 1.000

~

u 0.900

~

~

...J Non-Proprietary Information

/ /

/

/

Core Operating Limits Report Version 1

-= 0.800

~

c.

E

~

~ 0.700

/

~

...J

~

Ql

-g 0.600 Ql c.

~

~ 0.500 u::

0.400

/

'I' v

30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Core Flow (%of Rated)

Flow (%of Rated)

LHGRFACF (TLO/SLO) 30.0 0.557 50.0 0.795 80.0 0.998 90.0 1.000 110.0 1.000 FIGURE 4-1A GNF2 Flow-Dependent LHGR Limit Multiplier (LHGRFACF) versus Core Flow 32

Plant Hatch Unit 1 Cycle 30 1.000

() 0. 900

~

~

....I -= 0.800

~

Q.

E

1

~ 0.700

~

....I 1::

Q) -g 0.600 Q)

Q.

~

~ 0.500 u::: v,

0.400 30.0 40.0 Non-Proprietary Information

/ /

/

/

I

./ I 50.0 60.0 70.0 80.0 90.0 Core Flow(% of Rated)

Core Operating Limits Report Version 1 100.0 11 0.0 Flow (%of Rated)

LHGRFACF (TLO/SLO) 30.0 0.527 50.0 0.625 60.0 0.792 90.0 0.993 100.0 1.000 110.0 1.000 FIGURE 4-18 GNF2 Flow-Dependent LHGR Limit Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 33

Plant Hatch Unit 1 Cycle 30 1.000 u::

(.)

0.900

~

....1

-: 0.800 Non-Proprietary Information

/ v

/ v Core Operating Limits Report Version 1

~

Q.

E

l

~ 0.700

/

v

~

....1

~

Q.l

-g 0.600 Q.l Q.

~

~ 0.500 u:::

0.400

/

~

30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 11 0.0 Core Flow (%of Rated)

Flow (%of Rated)

LHGRFACF (TLO/SLO) 30.0 0.572 40.0 0.683 50.0 0.772 60.0 0.863 70.0 0.930 80.0 0.998 90.0 1.000 110.0 1.000 FIGURE 4-1C GNF3 Flow-Dependent LHGR Limit Multiplier (LHGRFACF) versus Core Flow 34

Plant Hatch Unit 1 Cycle 30 I

I 1.000 I

I I

I I

G.

I

(.)

0.900

~

I I

~

..J...

0.800

.~

c.

E

I
E (t:

0.700

~

..J I

I I

I c

Q)

~

'C 0.600 r::

I Q)

I Q.

~

Q) 3:

0.500 I

I I

I I

0 I

c..

I I

I I

I I

0.400 20.0 I

I 24.0 28.0

/

40.0 Non-Proprietary Information Core Operating Limits Report Version 1

/

~

~/

-/

50.0 60.0 70.0 80.0 90.0 100.0 Core Power(%ofRated)

Power LHGRFACp

(%of Rated)

(TLO/SLO) 24.0 0.460 s 28.0 0.470

> 28.0 0.624 45.0 0.713 60.0 0.740 85.0 0.922 100.0 1.000 FIGURE 4-2A GNF2 Power-Dependent LHGR Limit Multiplier (LHGRFACp) versus Core Power 35

Plant Hatch Unit 1 Cycle 30 1.000

0.

(.J 0.900

~

~

...J...

0.800

~

c.

Non-Proprietary Information

./ v Core Operating Limits Report Version 1

./ v E

1
1!:

a::

0.700

/ v

~

...J r:::

Q.l "C

r:::

Q.l c.

~

Q.l 3:

0 0..

0.600 0.500 0.400 20.0

/

I r I

I I

I I

I I

I I

I I

I i~

I I

130.0 I

24.0 28.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 Core Power(%ofRated)

Power LHGRFACp

(%of Rated)

(TLO/SLO) 24.0 0.415

28.0 0.445

> 28.0 0.583 45.0 0.713 100.0 1.000 FIGURE 4-28 GNF3 Power-Dependent LHGR Limit Multiplier (LHGRFACp) versus Core Power 36

Plant Hatch Unit 1 Cycle 30

((

Non-Proprietary Information FIGURE 4-3A Core Operating Limits Report Version 1

))

GNF2 Rated-Power LHGR Limit versus Peak Pellet Exposure 37

Plant Hatch Unit 1 Cycle 30

((

Non-Proprietary Information FIGURE 4-38 Core Operating Limits Report Version 1

))

GNF3 Rated-Power LHGR Limit versus Peak Pellet Exposure 38

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information 5.0 OPERATING PRESSURE LIMITS Core Operating Limits Report Version 1 The operating limits presented within this report require that reactor dome pressure be maintained within the licensed pressure bands defined by Figure 5-1. For operation in each of these regions, the following pressure dependent restrictions apply:

a. For Region I operation:

The core operating limits from Sections 2.0 through 4.0 are applicable.

b. For Region II and Region Ill operation:
1) The core operating limits from Sections 2.0 through 4.0 are applicable
2) The MFLCPR and MFLPD thermal limit ratios must remain below the maximum values determined by Table 5-1.

These restrictions are independent of core power, core flow, cycle exposure, feedwater temperature, the number of operating recirculation loops, and average scram time.

39

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information Core Operating Limits Report Version 1 The MFLCPR and MFLPD thermal limit ratios are defined in terms of the core operating limits defined in Section 3.0 and Section 4.0.

The MFLCPR thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Critical Power Ratio (FLCPR) in the core. The FLCPR is defined for each fuel assembly in the core as:

FLCPR MCPRLimit

=

Fuel Assembly Minimum Critical Power Ratio where:

MCPRLimit

=

MCPR operating limit defined in Section 3.0 The MFLPD thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Power Density (FLPD) in the core. The FLPD is defined for each six inch axial segment of each fuel rod in the core as:

where:

FLPD

=

Peak kW/ft power generated in a fuel rod segment LHGRLimit LHGRLimit

=

LHGR operating limit defined in Section 4.0 40

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information Core Operating Limits Report Version 1 1080 I

I I I

I T.S. 3.4.10Limit I

- _1.9§Q.

I 1058 1Q~5---

__ I Pnom+10 l ___

1040 1020 C)

'iii

c. -

~ 1000

I Ill Ill

<II...

a..

<II 980 E 8 960 940

~: ~

I Pnom I /

~

/


K=****** /

~~

/

/

\\

/


:G]**..

... -************** ~ \\'

r\\

.......... lt...---

/r Pnom*10 l I

~

I@

                                                • ~

f.-

~

I

~

.......... ~ -----

...---- I I

Pnom*20

.......... ~

~

--1 Pnom-40 I lr 920 20.0 I

30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 24.0 Core Power(%of Rated)

P = A + 0.30

  • CP + 0.0048
  • CP2 Dome Pressure Curves Nominal Dome Pressure (Pnom)

Region I Upper Boundary (P nom+ 1o)

Region I Lower Boundary (P nom-10)

Region II Lower Boundary (Pnom-20)

Region Ill Lower Boundary (Pnom-40)

CP = Percent of Rated Core Power P =Reactor Dome Pressure (psi g)

Core Power 24 S CPS 100 24 ::; CP::; 1 00 24::; CP :5100 24::; CP :51 00 24::; CP :5100 FIGURE 5-1 A

967 977 957 947 927 Licensed Regions of Operating Dome Pressure versus Core Power 41 1058 1045

Plant Hatch Unit 1 Cycle 30 Non-Proprietary Information TABLE 5-1 Core Operating Limits Report Version 1 Pressure Dependent Operating Flexibility Options Equipment In/Out of Service Main Turbine EOC-RPT S~stem Main Turbine Table#

Bl!Qass Sj!stem Pressure Regulator 0Qerable 0Qerable S~stem Status Yes Yes/No TLCO 3.3.13.a orb 5-2 No Yes/No TLCO 3.3.13.a or b Reduced-Pressure Flexibility Option Not Yes/No Yes/No TLCO 3.3.13.c Licensed TABLE 5-2 MFLCPR and MFLPD Limits versus Operating Pressure Regions Operating Pressure Region Max Allowable Thermal Limit Ratio MFLCPR Limit MFLPD Limit I

1.000 1.000 II 0.977 0.940 Ill 0.954 0.830 42

Plant Hatch Unit 1 Cycle 30

6.0 REFERENCES

Non-Proprietary Information Core Operating Limits Report Version 1

1. Global Nuclear Fuel Document NEDE-24011-P-A-28, "General Electric Standard Application for Reactor Fuel (GESTAR //),"September 2019, and the US Supplement, NEDE-24011-P-A-28-US, September 2019.
2. Global Nuclear Fuel Document NEDC-33270P, "GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR //),"Revision 9, December 2017.
3. Global Nuclear Fuel Document NEDC-33879P, "GNF3 Generic Compliance with NEDE-24011-P-A (GESTAR //),"Revision 2, March 2018.
4. Southern Nuclear Operating Company Document NFD-H-19-342, "Hatch-1 Cycle 30 Reload Licensing Analysis Report," Version 1.0, December 2019.
5. Global Nuclear Fuel Document 004N8412, "Supplemental Reload Licensing Report for Hatch 1 Reload 29 Cycle 30," Revision 0, December 2019.
6. Global Nuclear Fuel Document 004N8413, "Fuel Bundle Information Report for Hatch 1 Reload 29 Cycle 30," Revision 0, November 2019.
7. Global Nuclear Fuel Document 004N4841, "Technical Evaluation to Support Introduction of Partially ARMOR Coated Lead Test Rods (LTRs) in Four (4) GNF2 Reload Assemblies at Hatch Nuclear Plant, Unit 1," Revision 0, November 2017.
8. Global Nuclear Fuel Document 004N5426, "Technical Evaluation to Support Introduction of GNF FeCrAI (ATF) Unfueled Lead Test Rods (L TRs) in Four (4) GNF2 Reload Assemblies at Hatch Nuclear Plant, Unit 1," Revision 0, November 2017.
9. Global Nuclear Fuel Document 005N4842-RO, "Application of ARMOR and IronClad LTA Technical Evaluations to Hatch 1, Beyond Cycle 29," Revision 0, November 2019.

43