NG-03-0774, October 2003 Monthly Operating Report for Duane Arnold Energy Center
| ML033290305 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 11/14/2003 |
| From: | Peifer M Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NG-03-0774 | |
| Download: ML033290305 (2) | |
Text
Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC November 14, 2003 NG-03-0774 10 CFR 50.4 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 OCTOBER 2003 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.
The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.
This letter makes no new commitments or changes to any existing commitments.
Sincerely, ark Aifer Site Vice resident, Duane Arnold Energy Center- _
CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)
Enclosure:
OPERATING DATA REPORT 24C.
z 3277 DAEC Road
- Palo, Iowa 52324-9785 Telephone: 319.851.7611
-r November 14, 2003 Enclosure to NG-03-0774 Page 1 of 1 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold I DATE November 5, 2003 COMPLETED BY Richard Woodward TELEPHONE (319) 851-7318 REPORTING PERIOD: October 2003
- 1. Design Electrical Rating (MWe) 581.40
- 2. Maximum Dependable Capacity (MWe-Net) 565.50 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 745.00 6360.27 200,605.99
- 4. Number of Hours Generator On-line 745.00 6285.79 196.359.04
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical Energy Generated (MWHrs) 428,839.10 3,576,229.80 91.532,932.08 UNIT SHUTDOWNS Duration Type (Hours) Method of Cause & Corrective F: Forced Shuttinp Action No. Date S: Scheduled Reason1 Down Comments IReason: 2 Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation
E- Operator Training & License Examination -'5-Other, (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
NARRATIVE
SUMMARY
At the beginning of October, the DAEC had operated 163 days since completion of Refueling Outage 18. During the month, there were four departures from full-power operation:
(1) For a load line adjustment on October 16, (2) On October 17 to repair a steam leak, and perform a control rod sequence exchange, (3) For a load line adjustment on October 19, and (4) For a load line adjustment on October 20.
Text
Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC November 14, 2003 NG-03-0774 10 CFR 50.4 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 OCTOBER 2003 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.
The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.
This letter makes no new commitments or changes to any existing commitments.
Sincerely, ark Aifer Site Vice resident, Duane Arnold Energy Center- _
CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)
Enclosure:
OPERATING DATA REPORT 24C.
z 3277 DAEC Road
- Palo, Iowa 52324-9785 Telephone: 319.851.7611
-r November 14, 2003 Enclosure to NG-03-0774 Page 1 of 1 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold I DATE November 5, 2003 COMPLETED BY Richard Woodward TELEPHONE (319) 851-7318 REPORTING PERIOD: October 2003
- 1. Design Electrical Rating (MWe) 581.40
- 2. Maximum Dependable Capacity (MWe-Net) 565.50 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 745.00 6360.27 200,605.99
- 4. Number of Hours Generator On-line 745.00 6285.79 196.359.04
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical Energy Generated (MWHrs) 428,839.10 3,576,229.80 91.532,932.08 UNIT SHUTDOWNS Duration Type (Hours) Method of Cause & Corrective F: Forced Shuttinp Action No. Date S: Scheduled Reason1 Down Comments IReason: 2 Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation
E- Operator Training & License Examination -'5-Other, (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)