NEI 03-01, Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter

From kanterella
(Redirected from NEI 03-01)
Jump to navigation Jump to search
Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter
ML091050539
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/08/2009
From: Lorfing D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEI 03-01, RBF1-09-0048, RBG-46900
Download: ML091050539 (2)


Text

Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225 381 4157 Fax 225 635 5068 dlorfin@entergy.com David N. Lorfing Manager-Licensing SAFEGUARDS INFORMATION April 8, 2009 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Rockville Pike Rockville, MD 20852-2738 RBG-46900 RBF1-09-0048

Subject:

Supplemental Information for River Bend Station Submittal of Revision 4 to the Security Plan, Training &Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47

REFERENCE:

1. Nuclear Energy Institute (NEI) 03-01, Revision 2, "Nuclear Power Plant Access Authorization Program"
2. Letter from Entergy to US NRC dated April 1, 2009 (RBG-46896)

Dear Sir or Madam:

The following statement supplements the information in the cover letter to River Bend Station's revision 'to the Security Plan, Training & Qualification (T&Q) Plan and Safeguards Contingency Plan. These documents were previously submitted to the NRC on April 1, 2009 (Reference 2).

In accordance with I OCFR50. 54(p), these changes do not decrease the effectiveness of the Security Plan.

This letter includes no new commitments. If you require additional information, please contact Mr. Andre' James at (225) 381-4158.

Sincerely, DNL/kh NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."

SAFEGUARDS INFORMATION cSo~

River Bend Station Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan RBG-46900 RBF1-09-0048 Page 2 of 2 SAFEGUARDS INFORMATION cc:

w/o Enclosure U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4125 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Carl F. Lyon, Project Manager U.S. Nuclear Regulatory Commission MS 0-8B1 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."

SAFEGUARDS INFORMATION