Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225 381 4157 Fax 225 635 5068 dlorfin@entergy.com David N. Lorfing Manager-Licensing SAFEGUARDS INFORMATION April 8, 2009 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Rockville Pike Rockville, MD 20852-2738 RBG-46900 RBF1-09-0048
Subject:
Supplemental Information for River Bend Station Submittal of Revision 4 to the Security Plan, Training &Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47
REFERENCE:
- 1. Nuclear Energy Institute (NEI) 03-01, Revision 2, "Nuclear Power Plant Access Authorization Program"
- 2. Letter from Entergy to US NRC dated April 1, 2009 (RBG-46896)
Dear Sir or Madam:
The following statement supplements the information in the cover letter to River Bend Station's revision 'to the Security Plan, Training & Qualification (T&Q) Plan and Safeguards Contingency Plan. These documents were previously submitted to the NRC on April 1, 2009 (Reference 2).
In accordance with I OCFR50. 54(p), these changes do not decrease the effectiveness of the Security Plan.
This letter includes no new commitments. If you require additional information, please contact Mr. Andre' James at (225) 381-4158.
Sincerely, DNL/kh NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."
SAFEGUARDS INFORMATION cSo~
River Bend Station Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan RBG-46900 RBF1-09-0048 Page 2 of 2 SAFEGUARDS INFORMATION cc:
w/o Enclosure U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4125 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Carl F. Lyon, Project Manager U.S. Nuclear Regulatory Commission MS 0-8B1 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."
SAFEGUARDS INFORMATION