Summary of July 17, 2025, Pre-Application Public Meeting with SNC, Regarding a Proposed Combined License Amendment Request for an Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus
ML25227A098
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/19/2025
From: Dawnmathews Kalathiveettil
NRC/NRR/DORL/LPL2-1
To:
Southern Nuclear Operating Co
Kalathiveettil D, NRR/DORL/LPL2-1
References
EPID L-2025-LRM-0061
Download: ML25227A098 (1)


Text

August 19, 2025 LICENSEE:

Southern Nuclear Operating Company, Inc.

FACILITY:

Edwin I. Hatch Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF JULY 17, 2025, PRE-APPLICATION PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC., REGARDING A PROPOSED COMBINED LICENSE AMENDMENT REQUEST FOR AN EXTENDED POWER UPRATE AND MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS (EPID L-2025-LRM-0061)

On July 17, 2025, an Observation, pre-application public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company, Inc. (SNC, the licensee). The purpose of the meeting was for SNC to describe its plan to submit a combined license amendment request (LAR) for Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2, which proposes an Extended Power Uprate (EPU) and Maximum Extended Load Line Limit Analysis Plus (MELLLA+). Additionally, there was also a closed portion after the public meeting, with SNC and General Electric Hitachi (GEH), to discuss SNCs plans for a replacement steam dryer (RSD) in each unit as part of this combined LAR.

A list of attendees is provided as an Enclosure.

The meeting was noticed on the NRC public meeting website on May 30, 2025 (ML25154A555).

The NRC staff opened the meeting with introductory remarks and an introduction of the attendees.

The SNC provided slides ahead of the meeting (ML25189A103). However, SNC made some last-minute revisions and presented updated slides (ML25218A128) at the meeting. The presentation covered topics such as (1) purpose and need for the combined LARs, (2) tentative schedules, (3) applicable precedents, (4) applicable guidance, and (5) licensing strategy for the submittal.

NRC staff questions/comments/Observations NRC staff noted that Hatch subsequent license renewal (SLR) application was submitted on May 15, 2025, and that the proposed EPU increase of 5.6% has not been included in any of the Time-Limited Aging Analyses. The licensee stated that SNC would submit revisions to each of the SLR aging analyses as part of the EPU LAR submittal.

NRC staff enquired whether any plant changes will be performed to the Unit 2 feedwater nozzles which have low ASME Section III cumulative usage factor (CUF) margin based on prior EPU reviews. The licensee stated that they are aware of the low CUF margin condition and will consider it within the context of their EPU reviews.

The NRC asked if any digital modifications are planned as part of the proposed EPU.

The licensee stated that there are planned modifications to the GE Nuclear Measurement Analysis and Control (NUMAC) power range neutron monitoring (PRNM) that will likely include some upgrades in modules. The licensee stated that SNC expects to complete these modifications under Title 10 of the Code of Federal Regulations Part 50.59.

The NRC asked if the proposed power uprate will address any unit-specific design and licensing features and noted that Hatch, Unit 1, is a pre-General Design Criteria (GDC) plant and Unit 2 is a GDC plant. The NRC noted that Unit 2 had recirculation piping replaced in 1984 and Unit 1 had not. The licensee stated that any important characteristics applicable to the power uprate would be considered.

Regarding the schedule, the NRC staff noted that the power uprate would likely necessitate a revision to the spent fuel pool criticality analyses and suggested it be submitted 6-8 months ahead of the power uprate request. The licensee stated that the schedule provided in the SNC slides is based on their current best estimates and may change.

Public Comments There were no comments/questions from the public during this meeting.

Closing The NRC staff made no regulatory decisions during the meeting.

Public Meeting Feedback forms were available, but no comments were received.

The meeting adjourned at 10:00 a.m. (Eastern time).

Please direct any inquiries to me at Dawnmathews.Kalathiveettil@nrc.gov or 301-415-5905.

Sincerely,

/RA/

Dawnmathews T. Kalathiveettil, Project Manager Plant Licensing Branch, II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

List of Attendees cc: Listserv

Enclosure LIST OF ATTENDEES JULY 17, 2025, PUBLIC MEETING WITH SOUTHERN NUCLEAR COMPANY REGARDING A PROPOSED COMBINED LAR FOR AN EXTENDED POWER UPRATE AND MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS EDWIN I. HATCH NUCLEAR POWER PLANT, UNITS 1 AND 2 ATTENDEE REPRESENTING Dawnmathews Kalathiveettil The Nuclear Regulatory Commission (NRC)

John Lamb NRC Michael Markley NRC Zach Turner NRC Yuken Wong NRC Amy DAgostino NRC Gokul Vasudevamurthy NRC Ed Miller NRC Naeem Iqbal NRC Summer Sun NRC Fransha Wagner NRC Juan Perez Perez NRC Weidong Wang NRC David Nold NRC DaBin Gibbs NRC Todd Hilsmeier NRC Emma Haywood NRC Angelo Stubbs NRC Milton Valentin NRC Edward Stutzcage NRC John Bozga NRC Gilberto Blas NRC Samir Darbali NRC Thomas Scarbrough NRC John Tsao NRC Sheila Ray NRC Jay Robinson NRC Karen Sida NRC Jorge Cintron-Rivera NRC David Rahn NRC Chris Speer NRC Stewart Bailey NRC Wendell Morton NRC Ahsan Sallman NRC ATTENDEE REPRESENTING Bob Pascarelli NRC Jack Minzer Bryant NRC Darrell Murdock NRC Evan Davidson NRC Tony Sierra NRC Michael Mahoney NRC Chakrapani Basavaraju NRC Michael Markley NRC Tony Nakanishi NRC Kamal Manoly NRC Varoujan Kalikian NRC Reena Boruk NRC Matthew Yoder NRC On Yee NRC Steve Smith-DSS NRC Chris Thornell Southern Nuclear Operating Company, Inc. (SNC)

Jeanne Johnston SNC Denver Atwood SNC Ernest Bates SNC Ryan Joyce SNC Marcus Day SNC Kenneth Hunter SNC Amy Aughtman SNC Johnathan Chavers SNC Samuel Lafountain SNC Tom Kindred SNC Ashley Thomspon SNC Dr. Said Abdel-Khalik PUBLIC Lisa Simpson PUBLIC Duane Avery PUBLIC Scott Rutenkroger PUBLIC Patrick Simpson PUBLIC Manorma Kumar PUBLIC

ML25227A098 NRC-001 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DSS/SNSB/BC NAME DKalathiveettil KZeleznock NDifrancesco (ASallman for)

DATE 08/14/2025 08/18/2025 08/15/2025 OFFICE NRR/DEX/EMIB/BC NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM NAME SBailey MMarkley DKalathiveettil DATE 08/19/2025 08/15/2025 08/19/2025