ML25199A034
| ML25199A034 | |
| Person / Time | |
|---|---|
| Issue date: | 07/18/2025 |
| From: | NRC/OE |
| To: | |
| References | |
| Download: ML25199A034 (1) | |
Text
REACTOR ALLEGATIONS SUBSTANTIATED BY CY RECEIVED*: January 2021 - June 2025 Sites 2021 2022 2023 2024 2025 Arkansas Nuclear One 1
2 Beaver Valley 1
1 Braidwood 1
Browns Ferry 1
Brunswick 1
Callaway 1
Catawba 1
1 Columbia Generating Station 1
4 1
Comanche Peak 2
Cooper 1
D.C. Cook 1
Davis-Besse 1
Diablo Canyon 1
1 1
Dresden 1
Farley 1
Fermi 2
1 FitzPatrick 1
1 2
Ginna 1
Grand Gulf 1
2 1
Harris 3
2 Hatch 2
1 1
Limerick 1
McGuire 2
Millstone 1
Oconee 2
1 Palisades 1
Palo Verde 1
1 Perry 1
Quad Cities 1
1 River Bend 1
1 8
1 Saint Lucie 1
2 7
Salem/Hope Creek 3
2 2
Sequoyah 1
1 South Texas Project 5
1 Summer 1
Surry 2
1 Susquehanna 1
1 Turkey Point 1
1 2
2 Vogtle 1
2 Vogtle AP 1000+
12 8
1 Waterford 1
Watts Bar 4
1 3
1 Wolf Creek 1
+ Vogtle 3 began Operations on August 3, 2022, and Vogtle 4 began Operations on July 28, 2023.
- This table refers to allegations from sources external to the NRC for which NRC has substantiated at least one concern.
NON-OP REACTOR ALLEGATIONS SUBSTANTIATED BY CY RECEIVED*: January 2021 - June 2025 Site 2021 2022 2023 2024 2025 Crystal River 1
3 Indian Point 2
1 Oyster Creek 2
2 Pilgrim 1
1
- This table refers to allegations from sources external to the NRC for which NRC has substantiated at least one concern.
FUEL FACILITY ALLEGATIONS SUBSTANTIATED BY CY RECEIVED*: January 2021 - June 2025 Site 2021 2022 2023 2024 2025 Framatome, Inc.
1 Honeywell International, Inc.
1 1
Nuclear Fuel Services, Inc.
3 2
1
- This table refers to allegations from sources external to the NRC for which NRC has substantiated at least one concern.