Edwin I. Hatch Nuclear Plant - Units 1 & 2 Pre-Application Meeting to NL-25-0270 SNC Pre-application meeting July 17, 2025 (Public, non-proprietary)
A Southern Nuclear Combined License Amendment Request {LAR) for Extended Power Uprate {EPU) and Maximum Extended Load Line Limit Analysis Plus
{MELLLA+) for the Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 July 17, 2025
Agenda
- Purpose
- Need for a Combined LAR
- Schedule
- Precedents
- Guidance
- Documentation
- Licensing Strategy 2
PURPOSE EPU To Meet Increasing Power Demands in Georgia with Reliable Clean Energy:
Proposed increased licensed power level from 2804 MWth of 2960 MWt, which is an increase of 5.6% from CLTP or 121.5% of the OLTP.
MELLLA+
To Improve Operating Flexibility at Extended Power Uprate Levels:
Allow operations in the MELLLA+ domain to provide maximum operations flexibility. At 121.5% OLTP, MELLLA+
will allow a core flow window range similar to the currently licensed MELLLA domain.
Combined LAR to Support Efficient Licensing Strategy To Gain Efficiency in the Development. Review. and Implementation of the LAR:
APPROVED EPU 25 20 a..
1-
.....J u 15
~
0 w
Cf)
~ 10 0:: u z
5 0
- Proposed Hatch EPU EPU Data from Approved Applications For Power Uprates I NRC.gov 3
Need for Combined LAR Strategy for EPU and MELLLA+
Separate LARs Challenges:
- If submitted for parallel review, linked submittals will complicate the technical review and lead to inefficiencies.
Need for Review Efficiency:
- Essential for meeting schedule demands aligned with power needs and fuel fabrication lead time.
Combined LAR Benefits:
- Streamlines NRC resource use and supports similar future industry submissions.
- Minimizes operator impact by preventing loss of operational flexibility and reducing reactivity management maneuvers upon EPU implementation.
- Simplifies site implementation of physical mods and procedure updates, especially in areas affected by both EPU and MELLLA+.
Criteria 2 Separate LARS Review Efficiency Lower Complexity Lower for sequential Operator Higher Impact Site Implementation More complex Combined LAR Higher Higher Lower Simpler 4
Combined LAR Allows Reduced Reactivity Maneuvers 120 100 I
I.
.. 80 G)
§ Q.,, 60 al....
CV a:
';Ie.
40 20 0
0
~
I I
~
~
- - I I PHH
\\
ii I
r
'f I
I I
I I
I i
I
- ******Additional Reactivity Maneuvers w/o MEllllA+
-- EPU with 1M ELL LA+
100 200 300 400 500 600 700 5
SCHEDULE Hatch Subsequent License Renewal: Estimated Decision 2nd Quarter 2026 Hatch EPU/MELLLA+ LAR: Estimated Submittal 2nd Quarter 2027 Hatch EPU/MELLLA+ LAR: Requested NRC Approval 2nd Quarter 2028 Expected Power Ascension:
o Unit 2-1 st Quarter 2029 o Unit 1 -1 st Quarter 2030 6
Power Uprate Licensing Precedents Hatch Power Uprate
Background:
o 1995 Stretch Power Uprate (SPU): increase of 5% CL TP, 105.0% OL TP o
1998 Extended Power Uprate (EPU) increase of 8% CLTP, 113.4% OLTP o
2003 Measurement Uncertainty Recapture Uprate (MUR) 1.5% of CL TP, 115.1 % OL TP o
Proposed 2027 EPU 5.6% CLTP, 121.5% OLTP (retaining MUR at the proposed EPU power level)
Peach Bottom: 1994 SPU (5% CLTP); 2002 MUR (1.6% CLTP); 2014 EPU (12.4% CLTP);
2017 MELLLA+; 2017 MUR (1.66% CLTP)
Browns Ferry: 2017 EPU (14.3% CLTP); 2019 MELLLA+
Brunswick: 2002 EPU (15% CLTP); 2018 MELLLA+
7
GUIDANCE NRC Review Standard RS-001 (2003)
LIC-112 Power Uprate Process GE Nuclear Energy, "Constant Pressure Power Uprate," NEDC-33004P-A, Revision 4, July 2003 GE Hitachi Nuclear Energy, "General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus," NEDC-33006P-A, Revision 3, June 2009 GE Nuclear Energy, "Generic Guidelines and Evaluations for General Electric Boiling Water Reactor Thermal Power Optimization," NEDC-32938P-A, Revision 2, May 2003 GE Hitachi, "Boiling Water Reactor Detect and Suppress Solution-Confirmation Density,"
NEDC-33075P-A, Revision 8, November 2013 NEI 08-10 Roadmap for Power Uprate Program Development NEI 06-02 License Amendment Request Guidelines 8
CHANGESTOTHEPLANT Steam Dryer Replacement Power Range Neutron Monitoring System Modifications High Pressure Turbine Generator Upgrades Balance-of-Plant System and Component Upgrades 9
DOCUMENTATION GEH Combined Safety Analysis Report*
Operating License/ Technical Specifications Changes FSAR Changes Grid Stability Assessment Risk Assessment Environmental Assessment
- as discussed during closed meeting June 26, 2025 (ADAMS Accession No. ML25153A482) 10
STRATEGY
- Use industry peer input for consistency
- Continue NRC engagements to support a 2027 submittal and an efficient review
- Utilize audits for confirmatory analyses, areas of significance
- Leverage NRC Power Uprate review efficiency strategy 11
C'-*
u, C:
0 u,
Cl)
- l a
Edwin I. Hatch Nuclear Plant - Units 1 & 2 July 17, 2025 Pre-Application Meeting to NL-25-0270 GE Replacement Steam Dryer presentation redacted (Public, non-proprietary)