January 30, 2025 ACO 25-0004 ATTN: Document Control Desk John W. Lubinski, Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Laura Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave. NE, Suite 1200 Atlanta, GA 30303-1200 American Centrifuge Plant and American Centrifuge Lead Cascade Facility Docket Numbers 70-7004 and 70-7003; License Numbers SNM-2011 and SNM-7003 Annual Brief Summary of Facility Changes

Dear John Lubinski and Laura Dudes:

In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2) and U.S. Nuclear Regulatory Commission Materials License Conditions 16.c.ii (SNM-7003) and 24.c.ii (SNM-2011 ), American Centrifuge Operating, LLC (ACO) hereby submits a brief summary of the changes required by 10 CFR 70.62(a)(2) for facility changes made during calendar year 2024. provides the summary of facility changes for both the American Centrifuge Lead Cascade Facility and American Centrifuge Plant.

The non-consecutive change evaluation numbering in the enclosure is a result of cancelled evaluations.

American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661

John W. Lubinski and Laura Dudes January 30, 2025 ACO 25-0004, Page 2 If you have any questions regarding this matter, please contact me at (740) 897-3859.

Enclosure:

As Stated cc:

J. Downs, NRC Y. Faraz, NRC HQ L. Pitts, NRC Region II D. Woodyatt, NRC HQ Sincerely, Kelly L. Fitch Regulatory Manager to ACO 25-0004 ACO's Brief Summary of Facility Changes for Calendar Year 2024 Information Contained Within Does Not Contain Export Controlled Information Reviewing Official:

Lori Hawk / ACO Date:

01 /30/2024

FCE Number PCE Number Rev.

FCE 23-0062 PCE 23-0127 FCE 23-0082 PCE 23-0174 FCE 24-0001 0

PCE 24-0003 0

NRC Report 2014 2024 Brief Summary of Changes for the American Centrifuge Lead Cascade Facility {LCF) and American Centrifuge Plant (ACP)

ISA Summary Approval Change Documents Modified Update Date to SSC?

Due to Change Required?

Title:

1/13/2024 No ACD2-EC-012 Chg. 5 No Revision to Procedure ACD2-EC-012, Control of Refrigerants Description of Change:

Revised the change evaluation form AC-001 to use the correct form issued on July 24, 2023. No other changes were made to the previous evaluation for procedure ACD2-EC-012.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

Title:

2/5/2024 Yes ESO-3100-0120 Rev. 1 No Revision to Engineering Service Order ESO-3100-0120, UPS-Control Circuit Redundancy Description of Change:

Revised ESO-3100-0120 to split the Uninterruptible Power Supply control circuits to the Auxiliary Standby Generators (ASG) and Auxiliary Substations. This modification will provide a second UPS 120-Volt control power feed to the generators.

Reason for the Change:

ESO-3100-0120 is being expanded to provide redundant source control power to the auxiliary substations to ensure maximum reliability.

Title:

1/11/2024 No LA-3605-0001 Section 1.2.1 No Revision to LA-3605-0001, License Application for the American Centrifuge Plant Description of Change:

Revised LA-3605-0001 to change the name of the new Chief Executive Officer and President for Centrus Energy Corp. and associated subsidiaries.

Reason for the Change:

Clarify licensing documentation.

Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 1 of 75

FCE Number PCE Number Rev.

FCE 24-0002 0

PCE 24-0008 0

FCE 24-0003 0

PCE 24-0011 0

FCE 24-0004 0

PCE 24-0013 0

NRC Report 2024

Title:

Revision to Procedure ACD2-RG-044, Regulatory and Security Event Notification and Reporting Description of Change:

Revised ACD2-RG-044 to incorporate changes from 10 CFR 73.71 and 10 CFR Part 73, Appendix G to now reference 10 CFR 73.1200, 73.1205, 73.1 210, and 73.1215 throughout the procedure.

Reason for the Change:

Clarify procedure requirements.

Title:

Revision to Procedure ACD4-OP-073, Nitrogen System Operations Description of Change:

Revised ACD4-OP-073 to clarify the backfill process; and add two new references.

Reason for the Change:

Clarify procedure requirements.

Title:

Revision to LA-3605-0001, License Application for the American Centrifuge Plant; and New Procedure ACD2-EG-023, Pressure Vessel and Relief Valve Program Description of Change:

Revised LA-3605-0001 to match the Quality Assurance Program Description commitment to the American Society for Nondestructive Testing Recommended Practice No. SNT-TC-1A, June 1980 Edition or later.

ACD2-EG-023 establishes programmatic requirements for an unfired pressure vessel and relief valve program for the American Centrifuge Plant, including HALEU Demonstration. This procedure covers installed pressure vessels, relief valves, and new equipment installations.

Reason for the Change:

Clarify licensing documentation and implement procedure requirements.

ISA Summary Reason NRC Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments 1/8/2024 No ACD2-RG-044 Chg. 26 No None of the criteria listed in 10 CFR 70.72(c) are met.

1/8/2024 No ACD4-OP-073 Chg. 8 No None of the criteria listed in 10 CFR 70.72(c) are met.

4/25/2024 No ACD2-EG-023 Chg. 0 No None of the criteria LA-3605-0001 Section 1.5.2 listed in 10 CFR 70.72(c) are met.

Page 2 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0005 0

Title:

1/9/2024 No ACD4-OP-060 Chg. 11 No None of the criteria PCE 24-0015 0

Revision to Procedure ACD4-OP-060, Helium Leak Detector listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-OP-060 to add a section for installation and removal of a test device for calibration.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0006 0

Title:

1/23/2024 Yes ESO-3100-0133 Rev. 0 No None of the criteria PCE 24-0018 0

New Engineering Service Order ESO-3100-0133, Addition of 120-Volt listed in 10 CFR Electrical Receptacles in X-3001 North 70.72(c) are met.

Description of Change:

ESO-3100-0133 was developed to install additional 120-Volt quadruplex electrical outlets in the X-3001 building. The modification process ensures the use of the existing circuit panel, its internal protective circuit breakers, the new cable, conduit, and receptacles installation are designed within safe electrical margins, and configuration drawings are updated.

Reason for the Change:

The installation of additional receptacles will resolve housekeeping and safety issues associated with extension cord use and will provide additional circuits for cold box heat lamp use.

FCE 24-0008 0

Title:

1/18/2024 No ACD2-MM-001 Chg. 21 No None of the criteria PCE 24-0021 0

Revision to Procedure ACD2-MM-001, Control of Material listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-MM-001 to clarify form AC-030 to add signature blocks for Quality Assurance and the Configuration Manager for review of QL-2 Commercial Off The Shelf Item procurement specification, along with an explanation step for each signature block added.

Reason for the Change:

Clarify form requirements.

NRC Report 2024 Page 3 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0009 0

Title:

1/23/2024 No ACD2-RG-003 Chg. 30 No None of the criteria PCE 24-0022 0

Revision to Procedure ACD2-RG-003, Regulatory Communications listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-RG-003 to add the Director, Corporate Security to the minimum concurrences of several reports within Appendices B and C; change reports involving Foreign Ownership, Control, or Influence to have the Security Manager or Facility Security Officer as a minimum concurrence and the Director, Corporate Security as the signature authority; add Safety Review Committee review to the minimum concurrence section of Event Reports; change Nuclear Material Control and Accountability (NMC&A) reports to have the NMC&A Manager vice the Regulatory Manager as the Responsible Organization; add a new report to Appendix C for Controlled Unclassified Information incidents; add references; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0010 0

Title:

2/4/2024 No ACD4-ON-008 Chg. 3 No None of the criteria PCE 24-0028 0

Revision to Procedure ACD4-ON-008, Loss of Instrument Air (YA) listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-ON-008 to provide action steps involving the new standby compressor that has been installed in the X-3001 building to provide more dependable plant air supply; rework for new Ingersoll Rand equipment; correct valve nomenclature; revise actions in Sections for the new compressor; remove an unneeded section; update Appendix A drawings; and add Appendix C for new events list.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0012 0

Title:

2/26/2024 No ACD4-HP-007 Chg. 7 No None of the criteria PCE 24-0034 0

Revision to Procedure ACD4-HP-007, Operation of the Ludlum 2224 listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-HP-007 to align with a newer model probe, the Ludlum 43-

93. Operation of this new probe is essentially identical to older model probes; however, a correction for probe effective area is required.

Additionally, correction of formulas were made on forms AC-364, AC-364A, and AC-674.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 4 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0013 0

Title:

2/12/2024 No ACD4-OP-026 Chg. 5 No None of the criteria PCE 24-0038 0

Revision to Procedure ACD4-OP-026, Centrifuge Connections Leak listed in 10 CFR Checking 70.72(c) are met.

Description of Change:

Revised ACD4-OP-026 to provide the clarification that plastic sheets or bags secured by tape or other means may be used to aid in leak checking.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0014 0

Title:

2/12/2024 No ACD2-QM-101 Chg. 23 No None of the criteria PCE 24-0039 0

Revision to Procedure ACD2-QM-101, Inspection Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-QM-101 to perform a periodic review; provide clarifications and additional guidance when conducting quality control inspections; and revised forms AC-030, AC-056, and AC-185 and clarified their usage within the procedure.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0015 0

Title:

2/20/2024 No ACD2-SP-039 Chg. 5 No None of the criteria PCE 24-0041 0

Revision to Procedure ACD2-SP-039, High Security Key and Lock Control listed in 10 CFR for Classified Storage Areas 70.72(c) are met.

Description of Change:

Revised ACD2-SP-039 to address accountability of cores; add information on how to request a high security key/core/lock using the new form AC-809; remove reference to the Lead Cascade Facility; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 5 of 75

FCE Number PCE Number FCE 24-0016 PCE 24-0042 FCE 24-0017 PCE 24-0044 NRC Report 2024 Rev.

0

Title:

o New Engineering Change Record ECR-3100-0093-03, Door Hardware Removal and Padlock Installation, ECR-3100-0093-04, Minor Security Additions, Modifications and Enhancements, and SP-3605-0044, American Centrifuge Operating, LLC Classified Process Telephone System (PTS)

Description of Change:

ECR-3100-0093-03 was issued to make minor changes to security doors.

ECR-3100-0093-04 was issued to make various changes to the gates and doors; add a physical phone at the storage area; and relocate and add monitoring equipment, including associated conduit, wiring, and hardware routing from the cabinet.

Revised SP-3605-0044 by increasing the number of drops, active lines, and jacks. The additions will not change the system design, location, or impact how the system currently functions, operates, or is controlled.

Reason for the Change:

Implement ECR enhancements and clarify security plan requirements.

0

Title:

o Revision to Procedure ACO2-SP-004, Insider Threat Program; and Training Module UE0010, Insider Threat Program Annual Training Description of Change:

Revised ACO2-SP-004 to incorporate Security Executive Directive-4 (SEAD-4) adjudicative guidelines; perform periodic review; add Security-Related Information -Withhold Under 10 CFR 2.390 to footer; incorporate the Insider Threat Program Senior Official submission of a list of facilities and their associated Commercial and Government Entity (CAGE) or Safeguards & Security Information Management (SSIMS); add Director, Human Resources to the core member group, while removing from the discretionary group; clarify adjunct member is approved by the Insider Threat Program Working Group chairperson; update References; add Acronyms; and made formatting and grammatical changes throughout.

Revised UE0010 to remove links to documents; remove reference to UCP 01-2007, Unclassified Information Identification and Protection Policy; add slides 27 through 37 for additional guidelines; and remove the certificate page since the training is now available in the Learning Management System.

Reason for the Change:

Clarify procedure and training module requirements.

Approval Date 3/15/2024 3/26/2024 Change to SSC?

Yes No Documents Modified Due to Change ECR-3100-0093-03 Rev. 0 ECR-3100-0093-04 Rev. 0 SP-3605-0044 All (removed CUI marking), Sections 2.0, 5.0, Appendix A and Appendix E ACO2-SP-004 Chg. 2 UE0010 Rev. 2 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 6 of 75

FCE Number PCE Number Rev.

FCE 24-0019 0

PCE 24-0049 0

FCE 24-0020 0

PCE 24-0050 0

FCE 24-0021 0

PCE 24-0052 0

NRC Report 2024

Title:

New Procedure ACO2-PS-001, Roles, Responsibilities and Authorities for Maintaining eDOCS Description of Change:

ACO2-PS-001 was developed to outline the protocols and practices for maintaining and operating the electronic document management system (eDOCS).

Reason for the Change:

Implement procedure requirements.

Title:

Revision to Procedure ACD2-SH-028, Welding, Burning, and Hot Work Practices Description of Change:

Revised ACD2-SH-028 to adjust some responsibilities to reflect the current work agreement between American Centrifuge Operating, LLC Fire Services and DOE Contractor Fire Services; add driver procedure number to form AC-277; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

Revision to Procedure ACD4-ON-015, Response to a Complete Loss of Vacuum Description of Change:

Revised ACD4-ON-015 to add a Step to include requirements of ACP4-ON-102 for Loss of Evacuation Vacuum and Loss of Purge Vacuum; update procedure name; reorganize table in a Step; update procedure title for ACD3-FO-002; add steps to initiate 14-day tracker where applicable; add note and step to rest a tripped or shutdown pump; add a caution note and step to isolate Vacuum Cooling Water from a non-operating pump shutdown greater than 15 minutes; add step to direct isolation of the product cold boxes from the Evacuation Vacuum header; remove unnecessary steps; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

ISA Summary Reason NRC Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments 5/23/2024 No ACO2-PS-001 Chg. 0 No None of the criteria listed in 10 CFR 70.72(c) are met.

3/12/2024 No ACD2-SH-028 Chg. 14 No None of the criteria listed in 10 CFR 70.72(c} are met.

4/2/2024 No ACD4-ON-015 Chg. 2 No None of the criteria listed in 10 CFR 70.72(c) are met.

Page 7 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0022 0

Title:

3/20/2024 No ACD2-SH-013 Chg. 8 No None of the criteria PCE 24-0053 0

Revision to Procedure ACD2-SH-013, Job Hazard Analysis listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-SH-013 to update the purpose, scope/applicability, definitions, and general requirements for using the procedure; add the responsibility for supervisors to perform a search of CATSWeb for issues associated with identified hazards as part of a Job Hazards Analysis; and add the supervisor's responsibility into form AC-126.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0023 0

Title:

3/19/2024 No ACD2-TP-002 Chg. 31 No None of the criteria PCE 24-0056 0

Revision to Procedure ACD2-TP-002, Training Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-TP-002 to add a step that training modules containing National Fire Protection Association (NFPA) ?OE requirements are reviewed every three years at a minimum; add a step for other training modules to be reviewed every five years at a minimum; add a step stating that it is the Organization Manager's responsibility to ensure Task-to-Train-to-Procedure Matrixes (TTPMs) are reviewed every two years at a minimum; revise Appendix A; revise form AC-203; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0024 0

Title:

3/20/2024 No ACD2-RG-007 Chg. 9 No None of the criteria PCE 24-0057 0

Revision to Procedure ACD2-RG-007, Operating Experience Review listed in 10 CFR Program 70.72(c) are met.

Description of Change:

Revised ACD2-RG-007 to relocate and combine sections for clarity for lessons learned related to Root Cause Analysis; remove references to Lead Cascade Facility; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 8 of 75

FCE Number PCE Number FCE 24-0025 PCE 24-0059 FCE 24-0026 PCE 24-0062 NRC Report 2024 Rev.

0

Title:

o Revision to Procedure ACD3-EG-103, Engineering Software Controls Description of Change:

Revised ACD3-EG-103 to add additional guidance and clarify that corrective action measures are in place to document software problems from both internal and external sources when outside the modification process; and add a use reference.

Reason for the Change:

Clarify procedure requirements.

0

Title:

o Revision to Procedures ACD2-SP-028, Incident of Security Concern Conduct of Inquiry; ACD2-SP-041, Classified Item, Control, and Inventory; and SP-3605-0019, American Centrifuge Program Classified Matter Protection and Control (CMPC)

Description of Change:

Revised ACD2-SP-028 to update acronyms; add a section to address root cause analysis determinations for security conditions, includes incident category types, information on the use of risk ranking, and to incorporate the use of a root cause analysis tree; update references; update Appendices B, C, and D; and made formatting and grammatical changes throughout.

Revised ACD2-SP-041 to add Controlled Unclassified Information markings; remove Official Use Only markings; update references to include EA-23-018; update definitions and acronyms in Appendix A; remove information regarding disposal and permanent burial of items; and made formatting and grammatical changes throughout.

Revised SP-3605-0019 to include information for periodic inspection of classified material to ensure it is properly marked; add steps for removing items from security areas to include exempt material and non-exempt material; add a step regarding inquiries concerning security incidents; update reference to include Confirmatory Order EA-23-018; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements to implement EA-23-018, Confirmatory Order Modifying License - American Centrifuge Operating - Oak Ridge.

Approval Date 3/27/2024 3/20/2024 Change to SSC?

No No Documents Modified Due to Change ACD3-EG-103 Chg. 9 ACD2-SP-028 Chg. 15 ACD2-SP-041 Chg. 3 SP-3605-0019 Chg. 10 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 9 of 75

FCE Number PCE Number Rev.

FCE 24-0027 0

PCE 24-0063 0

FCE 24-0028 0

PCE 24-0068 0

NRC Report 2014

Title:

Revision to Procedures ACD2-OP-033, Operation of the Portable Gulper, and ACP2-OP-059, Operation of the Safe Geometry Vacuum Description of Change:

Revised ACD2-OP-033 to incorporate flow down of revised controls from NCSE-GEN-002, Nuclear Criticality Safety Education for Portable Gulpers; expand steps to include exception on the use of oil during Dispersed Oil Particulate (DOP) testing; revise steps to change spacing and to clarify spacing is measured from cart frame edge; change steps to include changes from NCSE-GEN-002; add a step to ensure only analyzed oils are used during DOP testing; and made formatting changes throughout.

Revised ACP2-OP-059 to incorporate flow down of revised controls from NCSE-GEN-002, Change 3; add steps, and Section associated with DOP testing; add exception indicating oil during DOP testing is OK; revise Steps to change spacing requirements and to clarify spacing is measured from cart frame edge; update source references to remove Lead Cascade Facility; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

Revision to Procedures ACD4-OP-055, Centrifuge Disconnect; and ACD4-OP-060, Helium Leak Detector Description of Change:

Revised ACD4-OP-055 to add instructions for purging and sampling of a system or component; add a step, a precaution, and a third warning; and made formatting and grammatical changes throughout.

Revised ACD4-OP-060 to add instructions for purging and sampling of a system or component; add steps and a condition for sampling; add a reference; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

ISA Summary Reason NRC Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments 3/22/2024 No ACD2-OP-033 Chg. 5 No None of the criteria ACP2-OP-059 Chg. 3 listed in 10 CFR 70.72(c) are met.

3/25/2024 No ACD4-OP-055 Chg. 4 No None of the criteria ACD4-OP-060 Chg. 12 listed in 10 CFR 70.72(c) are met.

Page 10 of 75

FCE Number PCE Number FCE 24-0029 PCE 24-0064 FCE 24-0030 PCE 24-0071 FCE 24-0031 PCE 24-0072 NRC Report 2024 Rev.

0

Title:

0 New Engineering Service Order ESO-3100-0069, Expansion of Backup Nitrogen Source for Headers to Pneumatically Operated Valves and Vacuum Pumps Description of Change:

ESO-3100-0069 expands the backup source and implement improvements; add nitrogen capacity and capability to supply either the pneumatically operated valve header, the vacuum pump nitrogen seal purge header, or both; generate new as-built drawings and revise nitrogen system drawings.

Reason for the Change:

The backup source of nitrogen provides Operations with the ability to maintain control over the cascade under off-normal conditions.

0

Title:

0 Revision to Procedure ACD2-RG-003, Regulatory Communications Description of Change:

Revised ACD2-RG-003 to add references for two NRC letters regarding reporting requirements for (1) Insider Threat Program, and (2) TEMPEST; add acronyms; update Appendix B Tables 1 and 2 and Appendix C Table 1 to flow down new requirements; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

0

Title:

o New Procedure SP-3605-0062, Export Compliance Program; and New Training Module UE0020, Export Compliance Program Annual Briefing Description of Change:

New SP-3605-0062 was developed to provide a high-level overview of the regulatory requirements when handling export controlled equipment and information described within the regulations.

New UE0020 was developed as a briefing module to implement with procedure SP-3605-0062 to further enhance the program.

Reason for the Change:

Establish new procedure and training module requirements.

Approval Change Date to SSC?

3/29/2024 Yes 3/28/2024 No 4/25/2024 No Documents Modified Due to Change ESO-3100-0069 Rev. 0 ACD2-RG-003 Chg. 31 SP-3605-0062 Rev. 0 UE0020 Rev. 0 ISA Summary Update Required?

No No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 11 of75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0033 0

Title:

5/16/2024 No ACD2-TP-001 Chg. 26 No None of the criteria PCE 24-0080 0

Revision to Procedure ACD2-TP-001, Procedure Process listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-TP-001 to incorporate multi-site procedure development and change control into the existing procedure processes described in Attachments A, B, C, D, E and I; add verbiage to Attachment O for cross discipline review consideration for multi-site procedures; and clarify form AC-006.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0034 0

Title:

4/19/2024 No ACD2-OP-060 Chg. 0 No None of the criteria PCE 24-0081 0

New Procedure ACD2-OP-060, Helium Leak Detector listed in 10 CFR Description of Change:

70.72(c) are met.

ACD2-OP-060 was developed to flow down requirements of NCSE-GEN-008, Nuclear Criticality Safety Evaluation for Service Carts, such as the limits of use of the small parts containers on the helium leak detectors, and to ensure any parts placed into containers do not exceed the physical dimensions of the container by extending beyond the sides and top of the container.

Reason for the Change:

Implement procedure requirements.

FCE 24-0036 0

Title:

4/23/2024 Yes ESO-3100-0093 Rev. 0 No None of the criteria PCE 24-0085 0

New Engineering Change Request ECR-3100-0093-05, Install a Cell ECR-3100-0093-05 Rev. 0 listed in 10 CFR Phone Locker Box at the Entrance to X-1107E-Vehicle 70.72(c) are met.

Description of Change:

ECR-3100-0093-05 evaluates the assembly and installation of a locked collection point for electronics (e.g., cell phones) prior to personnel entering in the Controlled Access Area (CAA) through X-1107E-Vehicle portal.

Reason for the Change:

Provides a secure location to store electronics (e.g., cell phones and other small recording/photographic devices) that have not been authorized for use within the CAA.

NRC Report 2014 Page 12 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0037 0

Title:

6/5/2024 Yes ESO-3100-0143 Rev. 0 No None of the criteria PCE 24-0089 0

New Engineering Service Order ESO-3100-0143, Removal of Nitrogen listed in 10 CFR IROFS Valve XV-8022 70.72(c) are met.

Description of Change:

ESO-3100-0143 removes the isolation valve from the gaseous nitrogen supply header, along with removal of associated instrumentation and controls. Applicable design outputs, such as Piping and Instrument Diagram, Piping Details, Electrical and Controls drawings and Distributed Control System code are being revised to reflect the new configuration.

Reason for the Change:

Modification of the nitrogen header to remove this valve improves reliability of the nitrogen system and reduces maintenance requirements.

FCE 24-0038 0

Title:

6/11/2024 No ACD2-SH-001 Chg. 12 No None of the criteria PCE 24-0095 0

Revision to Procedure ACD2-SH-001, Hazard Communication Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACS2-SH-001 to add steps for Environmental, Safety & Health (ES&H) to check Occupational Safety and Health Administration (OSHA)

Process Safety Management (PSM) Standard (29 CFR 1910.119) and the Environmental Protection Agency (EPA) Risk Management Program (RMP) Standard (40 CFR Part 68) during the initial process of new hazardous chemicals and during quarterly verifications; update Sources; change frequency of updates of Safety Data Sheets list to annually or as needed; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0038

Title:

9/17/2024 No ACD2-SH-001 Chg. 12 No None of the criteria PCE 24-0095 Revision to Procedure ACD2-SH-001, Hazard Communication Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised the change evaluation form AC-001 to correctly answer Questions 2.B.i. through 2.B.vi. No additional changes were made to procedure ACD2-SH-001.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

RC Report 2024 Page 13 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0039 0

Title:

6/11/2024 No ACD2-SH-004 Chg. 9 No None of the criteria PCE 24-0096 0

Revised Procedure ACD2-SH-004, Confined Space Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-SH-004 to add Non-Permit Confined Space requirements into the procedure and forms, as a recommendation from Safety.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0039

Title:

9/17/2024 No ACD2-SH-004 Chg. 9 No None of the criteria PCE 24-0096 Revision to Procedure ACD2-SH-004, Confined Space Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised the change evaluation form AC-001 to correctly answer Questions 2.B.i. through 2.B.vi. No additional changes were made to procedure ACD2-SH-004.

Reason for the Change:

To correct deficiencies noted with Revision 0 of the change evaluation.

FCE 24-0040 0

Title:

5/22/2024 Yes ECR-3100-0093-06 Rev. 0 No None of the criteria PCE 24-0097 0

New Engineering Change Request ECR-3100-0093-06, Alarm Building listed in 10 CFR Doors and Add to SACAS Software 70.72(c) are met.

Description of Change:

ECR-3100-0093-06 installs switches on building doors that enter office locations and updates software.

Reason for the Change:

To enhance security requirements.

FCE 24-0040

Title:

9/23/2024 Yes ECR-3100-0093-06 Rev. 0 No None of the criteria PCE 24-0097 New Engineering Change Record ECR-3100-0093-06, Alarm Doors and ECR-3100-0093-08 Rev. 0 listed in 10 CFR Add to SACAS Software; and New Engineering Change Request ECR-70.72(c) are met.

3100-0093-08, Addition of Tamper Switch to Junction Box Description of Change:

ECR-3100-0093-08 was generated to install a tamper switch on the phone junction box located in the Standby Generator Room and is being incorporated as a revision to the Change Evaluation.

Reason for the Change:

As part of the latest NRC inspection and results, it was determined that further security measures could be installed.

NRC Report 2024 Page 14 of 75

FCE Number PCE Number FCE 24-0041 PCE 24-0099 FCE 24-0042 PCE 24-0101 NRC Report 2024 Rev.

0

Title:

o Revision to ACD4-OP-102, Evacuation Vacuum Operating Procedure Description of Change:

Revised ACD4-OP-102 to provide procedure improvements; add Appendices A and B for flow path and valve locations of the vent monitor system; add a valve table to place the pumps in standby before entering a section to place the pump in service; update reference and unnecessary conditional steps; delete two sections for placing pumps in lead; update form AC-802; and add a step to provide users guidance for switching in service withdraw traps.

Reason for the Change:

Clarify procedure requirements.

0

Title:

o Revision to Procedure ACD2-RG-044, Regulatory and Security Event Notification and Reporting Description of Change:

Revised ACD2-RG-044 to define time of discovery; clarify steps throughout; add step for Information System Security related events; remove references to Lead Cascade Facility; add commitments and source references; update a step to include American National Standards Institute; update definitions and acronyms in Appendix A; update Appendix B references to various Information System Security Plans and Fundamental Nuclear Material Control Plan - Addendum 1; remove the link to the NRC Form 361A; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

Approval Date 5/23/2024 7/18/2024 Change to SSC?

No No Documents Modified Due to Change ACD4-OP-102 Chg. 10 ACD2-RG-044 Chg. 27 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 15 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Com men ts FCE 24-0043 0

Title:

5/23/2024 No ACD4-OP-035 Chg. 10 No None of the criteria PCE 24-0102 0

Revision to Procedures ACD4-OP-035, Operation of Adventurer Balances ACP4-OP-026 Chg. 15 listed in 10 CFR Sample Scale AX2202; and ACP4-OP-026, Scale Operations 70.72(c) are met.

Description of Change:

Revised ACD4-OP-035 to add a step for circling responses and values and not lining out the others; add a Section for Post Maintenance Testing (PMT) and Diagnostic checks of the scale; add a note applicable to receipt of standards containing nuclear material; add instructions to record times weighed as displayed on the printed weight ticket; clarify to circle appropriate choices on the forms throughout; add new form AC-812 for scale PMT/Diagnostics; and made formatting and grammatical changes throughout.

Revised ACP4-OP-026 to add a step for circling responses and values and not lining out the others; add steps to clarify which forms are used for which evolutions (cylinder weighing or scale PMT/diagnostics); add sections for PMT and Diagnostic checks of scales; add a note for receipt of 30B cylinders containing nuclear material; add new form AC-811 ; and add references; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0043

Title:

9/17/2024 No ACD4-OP-035 Chg. 10 No None of the criteria PCE 24-0102 Revision to Procedures ACD4-OP-035, Operation of Adventurer Balances ACP4-OP-026 Chg. 15 listed in 10 CFR Sample Scale AX2202; and ACP4-OP-026, Scale Operations 70.72(c) are met.

Description of Change:

Revised the change evaluation form AC-001 to provide the reason/technical basis for the change under Question 1 B.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

FCE 24-0044 0

Title:

6/10/2024 No ACD2-TP-001 Chg. 27 No None of the criteria PCE 24-0104 0

Revision to Procedure ACD2-TP-001, Procedure Process listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-TP-001 to allow references to the Lead Cascade Facility to be removed from existing AGO procedures using a graded approach.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 16 of 75

FCE Number PCE Number FCE 24-0045 PCE 24-0105 FCE 24-0046 PCE 24-0107 NRC Report 2024 Rev.

0

Title:

o Revision to Procedure ACD2-SH-014, Electrical Safety Guidelines Description of Change:

Revised ACD2-SH-014 to transfer the Electrical Safety program from Industrial Safety to Engineering; change approval authority to Piketon Engineering Manager; and align with National Fire Protection Association (NFPA) 70E (2021) and Design Analysis and Calculation DAC-2414-0002, ACP Arc-Flash Analysis.

Reason for the Change:

Clarify procedure requirements.

0

Title:

o Revision to Procedures ACD4-OP-073, Nitrogen System Operations, ACD4-ON-073, Loss of Nitrogen, and ACP3-ST-001, HALEU Nitrogen System IROFS Surveillance Testing and Calibration Description of Change:

Revised ACD4-OP-073 to provide more accurate instructions on valving, and conducting testing and surveillances of a new modification to the system that allows for back-up Nitrogen to be supplied to other consumers beyond the Air-Operated Valves (AOVs); and delete a caution that is no longer needed.

Revise ACD4-ON-073 to include an option to provide backup header; delete a note regarding use of residual nitrogen for AOV operation; and add optional steps to direct isolation of purge header and shutdown.

Revise ACP3-ST-001 to remove prerequisites for centrifuges prior to performing surveillance; add prerequisite to ensure nitrogen bottles are connected to AOV header prior to performing surveillance; add references; add prerequisites for the nitrogen system Items Relied on For Safety to be declared inoperable and the feed cylinder to be isolated; add operability restoration; and remove final restoration.

Reason for the Change:

Clarify procedure requirements.

Approval Date 6/6/2024 6/6/2024 Change to SSC?

No No Documents Modified Due to Change ACD2-SH-014 Chg. 20 ACD4-OP-073 Chg. 9 ACD4-ON-073 Chg. 5 ACP3-ST-001 Chg. 6 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 17 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0047 0

Title:

11/7/2024 No ACD2-MP-001 Chg. 20 No None of the criteria PCE 24-0110 0

Revision to Procedure ACD2-MP-001, Safety Review Committee listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-MP-001 to perform a periodic review and remove the specific references to the Facility Safety Review Committee and LA-2605-0001, License Application for the American Centrifuge Lead Cascade Facility, throughout the procedure and on form AC-156; clarify and add references; revise acronyms; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0049 0

Title:

6/24/2024 No ACD4-OP-003 Chg. 14 No None of the criteria PCE 24-0115 0

Revision to Procedures ACD4-OP-003, Machine Cooling Water Normal ACD4-OP-006 Chg. 14 listed in 10 CFR Operations, and ACD4-OP-006, Vacuum Cooling Water Normal Operations 70.72(c) are met.

Description of Change:

Revised ACD4-OP-003 to allow for operators to reset pump at local controller if it fails to shift on first attempt; to sequence addition of chemicals straight into the tank from the lid, bypassing the need for adding via the funnel; and add a ladder into the Tools section.

Revised ACD4-OP-006 to provide direction during pump shifting if the oncoming pump fails to start properly; to allow for operator to add chemicals directly into the top of the Vacuum Water Cooling tank; add a ladder into the Tools section; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0049

Title:

9/30/2024 No ACD4-OP-003 Chg. 14 No None of the criteria PCE 24-0115 Revision to Procedures ACD4-OP-003, Machine Cooling Water Normal ACD4-OP-006 Chg. 14 listed in 10 CFR Operations; and ACD4-OP-006, Vacuum Cooling Water Normal Operations 70.72(c) are met.

Description of Change:

Revised the change evaluation form AC-001 to provide an answer to the Question "If this change is a Revision, was the FCE/PCE Revision Number obtained from the database?" which was inadvertently left blank. No additional changes were made to procedures ACD4-OP-003 or ACD4-OP-006.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

NRC Report 2024 Page 18 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0050 0

Title:

7/1/2024 No ACD4-OP-073 Chg. 10 No None of the criteria PCE 24-0117 0

Revision to Procedure ACD4-OP-073, Nitrogen System Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-OP-073 to improve valving actions to isolate back-up headers; change a step to a conditional step if isolating all back-up sources; add conditional step if back-up source is still being applied to the air operated valves; add conditional step to reestablish normal source Nitrogen to the vacuum pumps after isolating backup Nitrogen; and update a table to include locations and reorganize table for operator convenience.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0051 0

Title:

7/17/2024 No ACD4-OP-019 Chg. 3 No None of the criteria PCE 24-0124 0

Revision to Procedure ACD4-OP-019, Operation of the Rigid Mast Crane listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-OP-019 to add a note to reflect the current programming and calibration of the Rigid Mast Crane and to operate within these limits.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0051

Title:

9/17/2024 No ACD4-OP-019 Chg. 3 No None of the criteria PCE 24-0124 Revision to Change Evaluation for Procedure ACD4-OP-019, Operation of listed in 10 CFR the Rigid Mast Crane 70.72(c) are met.

Description of Change:

Revised the change evaluation form AC-001 to provide the reason/technical justification under Question 1 B. No additional changes were made to procedure ACD4-OP-019.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

RC Report 2024 Page 19 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0052 0

Title:

817/2024 No ACD2-SH-028 Chg. 15 No None of the criteria PCE 24-0127 0

Revision to Procedure ACD2-SH-028, Welding, Burning, and Hot Work listed in 10 CFR Practices 70.72(c) are met.

Description of Change:

Revised ACD2-SH-028 to add step for American Centrifuge Operating, LLC Fire Services to be notified prior to first use of a hot work permit; revise list of commitments; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0053 0

Title:

8/15/2024 No SEC 18-0002 Cover, Change No None of the criteria PCE 24-0134 0

Revision to SEC-23-0001, Security Controls Catalog for SEC-18-0002 Control Page, listed in 10 CFR Information System Security Plan (ISSP) for Oak Ridge, TN; Piketon, OH; TOG, Approvals Page, 70.72(c) are met.

and Bethesda, MD, and SEC-18-0002, Information System Security Plan Sections 2.1.1, 2.2.1, 2.2.2, (ISSP) for Oak Ridge, TN; Piketon, OH; and Bethesda, MD 2.3.1, 2.3.2; Figure 9; and Description of Change:

footers (all pages)

Revised SEC-18-0002 to update cover page, change control page, and Table of Contents (TOG); remove the Controlled Unclassified Information marking from the footer of the document; remove the approval page to be consistent with other security plans; update the Points of Contact in Sections 2.1.1, 2.2.1, and 2.3.1; update Figure 9 to reflect the change in new office space for the Document Control Center; and change Devicelock to Port Control Software in Sections 2.2.2 and 2.3.2.

Reason for the Change:

Clarify security plan requirements and update security controls in SEC 0001.

FCE 24-0054 0

Title:

8/12/2024 No ACD4-AR-101 Chg. 4 No None of the criteria PCE 24-0138 0

Revision to Procedure ACD4-AR-101, Centrifuge Alarms and Responses listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-AR-101 to incorporate Error Code 81 Alarm and Response.

Reason for the Change:

Clarify procedure requirements.

RC Report 2024 Page 20 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0056 0

Title:

8/20/2024 No ACD4-OP-073 Chg. 11 No None of the criteria PCE 24-0144 0

Revision to Procedure ACD4-OP-073, Nitrogen System Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-OP-073 to clarify changing empty nitrogen cylinders from the backup nitrogen supply banks.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0057 0

Title:

9/17/2024 No ACD2-SP-017 Chg. 31 No None of the criteria PCE 24-0145 0

Revision to Procedure ACD2-SP-017, Badge lssueNisitor Control Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-SP-017 to clarify training status verification process; delete and add references; update forms AC-046 and AC-452 to remove the approval requirement for Enrichment Operations Plant Manager; update DOE Form 5631.20; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0057

Title:

12/10/2024 No ACD2-SP-017 Chg. 31 No None of the criteria PCE 24-0145 Revision to Procedure ACD2-SP-017, Badge lssueNisitor Control Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised the change evaluation form AC-001 to correct the answer designation for Question 3C from yes to no.

Reason for the Change:

To correct discrepancies noted in Revision O of the change evaluation.

FCE 24-0058 0

Title:

8/22/2024 No ACP4-OP-036 Chg. 0 No None of the criteria PCE 24-0121 0

New Procedure ACP4-OP-036, Operation of the V-1218 Bridge and W-2 listed in 10 CFR Trolley 70.72(c) are met.

Description of Change:

ACP4-OP-036 was developed to provide instructions on the operation of the V-1218 Bridge and W-2 Trolley in the X-7725 Buffer Storage Area.

Reason for the Change:

Implement procedure requirements.

RC Report 2024 Page 21 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0059 0

Title:

8/22/2024 No ACP4-OP-037 Chg. 0 No None of the criteria PCE 24-0123 0

New Procedure ACP4-OP-037, V-1218 Bridge and W-2 Trolley Routine listed in 10 CFR Checks 70.72(c) are met.

Description of Change:

ACP4-OP-037 was developed to provide the steps involved in performing routine checks of the V-1218 Bridge and W-2 Trolley in the X-7725 Buffer Storage Area.

Reason for the Change:

Implement procedure requirements.

FCE 24-0060 0

Title:

9/9/2024 No ACD4-OP-112 Chg. 5 No None of the criteria PCE 24-0149 0

Revision to Procedures ACD4-OP-112, X-3012 ASG; ACD4-OP-179, ACD4-OP-179 Chg. 6 listed in 10 CFR 1O12-ASG Operations; and ACD4-OP-180, 1Q34 ASG Operations ACD4-OP-180 Chg. 5 70.72(c) are met.

Description of Change:

Revised ACD4-OP-112 to add sections for load tests; add form AC-770; update references; and made formatting changes throughout.

Revised ACD4-OP-179 to add sections for cross connection of starting air and load tests; to address issues noted in condition notifications; add form AC-771 ; update references; and made formatting changes throughout.

Revised ACD4-OP-180 to add sections for cross connection of starting air and load tests; to address issues noted in condition notifications; add form AC-772; update references; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0061 0

Title:

9/9/2024 No ACD4-OP-102 Chg. 12 No None of the criteria PCE 24-0150 0

Revision to ACD4-OP-102, Evacuation Vacuum Operating Procedure listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-OP-102 to include steps for header evacuation, which were previously performed as valving orders but due to the commonality of their performance, it was deemed simpler to incorporate into the procedure; and add use references.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2014 Page 22 of 75

FCE Number PCE Number Rev.

FCE 24-0062 0

PCE 24-0135 0

FCE 24-0063 0

PCE 24-0158 0

NRC Report 1024

Title:

Revision to LA-3605-0001, License Application for the American Centrifuge Plant Description of Change:

Revised LA-3605-0001 to add language to the report required by 10 CFR 70.59 for reporting hydrogen fluoride concentrations to the maximally exposed individual per an NRC request.

Reason for the Change:

Formalize the commitment made to the NRC within the licensing documentation.

Title:

Revision to Procedures ACD4-OP-006, Vacuum Cooling Water Normal Operations; ACP4-OP-031, Tails Cold Box Operation; and ACD4-ON-009, Response to Loss of Power Description of Change:

Revised ACD4-OP-006 to remove reference to VS-400; clarify steps and note boxes; and made formatting changes throughout.

Revised ACP4-OP-031 to add a section for evacuating the dead space; clarify a step for the operator to update the cylinder identification number during cylinder installation; and add steps to have the operator install/remove cover prior to pigtail disconnecting to prevent inadvertent dropping of gaskets into cold well.

Revised ACD4-ON-009 to clarify sections related to the loss of Uninterruptable Power Supply; clarify sections and warning box related to the loss of power control cabinet power; remove unnecessary steps and information; correct table information; clarify a section to sequence loss of substation; add a step to sequence priority of subsequent off-normal evolutions; add a section to direct restoration of auxiliary loads following a loss of power; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

Approval Date 9/12/2024 9/23/2024 ISA Summary Reason NRC Change Documents Modified Update Preapproval Not to SSC?

Due to Change Required?

Required/Comments No LA-3605-0001 Section 9.3.1 No None of the criteria listed in 10 CFR 70.72(c) are met.

No ACD4-OP-006 Chg. 15 No None of the criteria ACP4-OP-031 Chg. 24 listed in 10 CFR ACD4-ON-009 Chg. 7 70.72(c) are met.

Page 23 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0064 0

Title:

11/5/2024 No ACO2-PT-006 Chg. 0 No None of the criteria PCE 24-0151 0

New Multi-Site Procedure ACO2-PT-006, Communications Center listed in 10 CFR Operation 70.72(c) are met.

Description of Change:

ACO2-PT-006 was developed to describe the requirements for operation of a Communications Center for tracking shipments of classified matter.

The procedure is a rewrite of previously approved procedure ACD2-PT-006, Communications Center Operation, which was placed on hold following decommissioning of the Lead Cascade Facility.

Reason for the Change:

Implement procedure requirements.

FCE 24-0065 0

Title:

11/7/2024 No ACO2-PT-007 Chg. 0 No None of the criteria PCE 24-0152 0

New Multi-Site Procedure ACO2-PT-007, (U) Communications Center listed in 10 CFR Abnormal Conditions and Operations 70.72(c) are met.

Description of Change:

ACO2-PT-007 was developed to describe the requirements for operation of a Communications Center for tracking shipments of classified matter.

The procedure is a rewrite of previously approved procedure ACD2-PT-007, (U) Communications Center Abnormal Conditions and Operations, which was placed on hold following decommissioning of the Lead Cascade Facility.

Reason for the Change:

Implement procedure requirements.

FCE 24-0066 0

Title:

10/1/2024 No ACD2-SP-027 Chg. 5 No None of the criteria PCE 24-0164 0

Cancellation of Procedure ACD2-SP-027, (U) Storage, Handling, Marking, listed in 10 CFR and Transport of Classified Parts and Equipment 70.72(c) are met.

Description of Change:

Cancel ACD2-SP-027.

Reason for the Change:

Cancel procedure requirements since these same requirements are captured in other approved procedures.

NRC Report 2024 Page 24 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments FCE 24-0069 0

Title:

10/24/2024 Yes ECR-3100-0093-09 Rev. 0 No None of the criteria PCE 24-0177 0

New Engineering Change Record ECR-3100-0093-09, Addition of Security listed in 10 CFR Equipment 70.72(c) are met.

Description of Change:

ECR-3100-0093-09 was generated to add a surveillance camera.

Reason for the Change:

To enhance security requirements.

FCE 24-0070 0

Title:

10/28/2024 No ACD2-OP-060 Chg. 1 No None of the criteria PCE 24-0178 0

Revision to Procedure ACD2-OP-060, Helium Leak Detector listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-OP-060 to incorporate steps for operators to perform appropriate tuning and focus adjustments on the helium leak detector; add a new helium leak detector of the same model for use in fissile material systems; add definitions to clarify what calibration is in this operating procedure; changed terminology to better clarify requirements in the Quality Assurance Program Description; add a source reference; and change a step to avoid unnecessary repeated switching between filaments.

Reason for the Change:

Clarify procedure requirements.

FCE 24-0071 0

Title:

10/23/2024 No ACD2-QM-011 Chg. 16 No None of the criteria PCE 24-0179 0

Revision to Procedure ACD2-QM-011, Resolving Contractor Issues listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-QM-011 to restructure the contractor issue resolution process to utilize procedure ACD2-RG-004, Corrective Action Process, as the primary method for identifying contractor issues and ensure that the proper reviews and evaluations are performed; remove unnecessary definitions; and modify form AC-381.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 25 of 75

FCE Number PCE Number Rev.

FCE 24-0072 0

PCE 24-0180 0

FCE 24-0073 0

PCE 24-0181 0

NRC Report 2024

Title:

Revision to Procedure ACD2-RG-004, Corrective Action Process Description of Change:

Revised ACD2-RG-004 to clarify steps and sections for a better understanding of the requirements, such as management's expectation of timeliness of making reports to the NRC; clarify the Screening Manager's questions under the Assessment and Categorization section to help with required actions pertaining to Items Relied on For Safety; clarify recommendations for interim action that expedite risk reduction until long-term corrective actions can be developed and implemented; clarify how to document classified closure evidence and expand the examples of closure evidence; clarify process improvements; clarify form AC-634 to align with the Screening Manager's questions; clarify requirements of Attachment C; remove references to the Lead Cascade Facility; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

Revision to Procedures ACD4-OP-035, Operation of Adventurer Balances Sample Scale AX2202; and ACP4-OP-026, Scale Operations Description of Change:

Revised ACD4-OP-035 to add steps throughout to print weight slips for all check weight readings when the printer is available; add a section for opening the mass spectrometer standards cabinet and keeping it attended while open; add a step for addressing tamper indicating device issues; and clarify form AC-812.

Revised ACP4-OP-026 to add steps throughout to print weight slips for all check weight readings when the printer is available; and add steps to change the scale check weight sets.

Reason for the Change:

Clarify procedure requirements.

ISA Summary Reason NRC Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments 11/7/2024 No ACD2-RG-004 Chg. 27 No None of the criteria listed in 10 CFR 70.72(c) are met.

10/30/2024 No ACD4-OP-035 Chg. 13 No None of the criteria ACP4-OP-026 Chg. 19 listed in 10 CFR 70.72(c) are met.

Page 26 of 75

FCE Number PCE Number FCE 24-0075 PCE 24-0184 N/A PCE 24-0004 RC Report 2024 Rev.

0

Title:

o Revision to Procedures ACD2-RG-001, Change Evaluation; and ACD2-RG-002, Application Change Control and License Amendment Requests Description of Change:

Revised ACD2-RG-001 to remove references to the Lead Cascade Facility; remove the use of Facility Change Evaluation; add current security marking review; clarify forms AC-001 and AC-002; and made formatting and grammatical changes throughout.

Revised ACD2-RG-002 to remove references to the Lead Cascade Facility; remove the use of Facility Change Evaluation and Facility Application Change; clarify forms AC-003, AC-004, and AC-551 ; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

o Revision to SP-3605-0042, Security Plan for the Physical Protection of Special Nuclear Material at the American Centrifuge Plant Description of Change:

The NRG amended 1 O CFR 73. 71, Appendix G, Reportable Safeguards Events; Regulatory Guide 5.62, Revision 2, Physical Security Event Notifications, Reports, and Records; and implemented new Regulatory Guide 5.86, Revision 0, Preemption Authority, Enhanced Weapons Authority and Firearms Background Checks; and new Regulatory Guide 5.87, Revision 0, Suspicious Activity Reports Under 10 CFR Part 73.

Based upon these changes in the regulation and guidance documents, SP-3605-0042 was revised to ensure correct regulatory reporting requirements and references are reflected throughout; clarify the use of independent Memorandums of Understanding with Pike County Sheriffs Office; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify security plan requirements.

Approval Date 11/7/2024 1/6/2024 Change to SSC?

No No Documents Modified Due to Change ACD2-RG-001 Chg. 27 ACD2-RG-002 Chg. 16 SP-3605-0042 Sections 1.0, 5.9, 5.11, 5.12, 8.2, 8.3, and 9.0 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 27 of 75

FCE Number PCE Number N/A PCE 24-0005 N/A PCE 24-0006 NRC Report 2024 Rev.

Title:

o Revision to SP-3605-0075, Operations Security Plan for Centrus Energy Corp. Headquarters, and SP-3605-0045, Security Plan for the Protection of Classified Matter at Centrus Energy Headquarters Description of Change:

Revised SP-3605-0075 to reflect changes in Headquarters personnel, clarify Sections 1.0, and 3.0 through 9.0; and made grammatical and formatting changes throughout.

Revised SP-3605-0045 to reflect changes in Headquarters personnel; add the commitment to ensure every five years, the Licensee updates the NRC facility clearance by submitting a complete security Standard Practice Procedures Plan or a certificate that this plan is fully current; clarify access to common areas of the building during business hours and egress after normal business hours; remove physical descriptors of the building; add information to address Foreign Ownership, Control or Influence mitigation; clarify the use of Form SF 701, Activity Security Checklist; clarify training records retention; remove reference to the TEMPEST Plan and add reference to SP-3605-0075; clarify retrieval of information following suspension or revocation of access authorization; and made grammatical and formatting changes throughout.

Reason for the Change:

Clarified security plan requirements.

Title:

o Revision to NCSE-GEN-001, Nuclear Criticality Safety Evaluation for Large UF6 Cylinders; and LA-3605-0003A, Addendum 1 of the Integrated Safety Analysis Summary for the American Centrifuge Plant - HALEU Demonstration Description of Change:

Revised NCSE-GEN-001 to update 30-series cylinder storage and handling requirements based on new calculations documented in DAC-3901-0008 (Revision O); to document a trivial risk evaluation for handling, storage, and transportation of 30-series cylinder that can be used to support a Criticality Accident Alarm System exemption request for 30-series cylinders; to allow receipt of 30-series cylinders containing enriched UF6 from foreign facilities; to acknowledge the presence of Tamper-Indicating Devices on 30-series and 12-series cylinders; and performed an evaluation of a new postulated contingency event.

Revised LA-3605-0003A to flow down the changes from NCSE-GEN-001,

(Revision 5); update the reference for NCSE-GEN-001 latest revision; and made formatting changes throughout.

Reason for the Change:

Clarify NCSE and licensing documentation.

Approval Date 1/23/2024 2/15/2024 Change to SSC?

No Yes Documents Modified Due to Change SP-3605-0075 (All)

SP-3605-0045 (All)

NCSE-GEN-001 Rev. 5 LA-3605-0003A Sections 2.2.1.4.1, 3.5.1, 3.5.3, 3.5.5, 3.7.1, 7.3.6.7.1.10, 7.3.6.7.3.6, 7.3.6.7.3.13, 7.3.6.7.3.21, 7.3.6.7.3.22, 7.5, Figure 2.2-1, and Table C-2-7 ISA Summary Update Required?

No Yes Reason NRC Preapproval Not Required/Com men ts None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 28 of 75

FCE Number PCE Number N/A PCE 24-0007 NIA PCE 24-0010 NRC Report 2024 Rev.

Title:

o Revision to NCSE-CAS-003, Nuclear Criticality Safety Evaluation for the Evacuation Vacuum and Purge Vacuum Systems; and LA-3605-0003A, Addendum 1 of the Integrated Safety Analysis Summary for the American Centrifuge Plant - HALEU Demonstration Description of Change:

Revised NCSE-CAS-003 to ensure the description of the valves and their function in the NCSE are correct and the specific hand valve numbers are corrected to the final as-built plant configuration drawings; and made formatting and grammatical changes throughout.

Revised LA-3605-0003A to correct valve nomenclature consistent with the NCSE-CAS-003 revision; and update reference of NCSE-CAS-003 to the latest revision.

Reason for the Change:

Clarify NCSE and licensing documentation.

Title:

o Revision to Procedures ACP4-OP-051, Inventory Removal; and ACP4-AR-074, Cold Box Alarms and Responses Description of Change:

Revised ACP4-OP-051 to incorporate guidance to notify Engineering for assistance in determining the amount of material added to a cylinder during inventory removal.

Revised ACP4-AR-07 4 to change the product and tails cylinder at maximum net weight alarms.

Reason for the Change:

Clarify procedure requirements.

Approval Date 2/15/2024 117/2024 Change to SSC?

Yes No Documents Modified Due to Change NCSE-CAS-003 Rev. 5 LA-3605-0003A Sections 7.3.6.2.1.5.3 and 7.5 ACP4-OP-051 Chg. 10 ACP4-AR-074 Chg. 6 ISA Summary Update Required?

Yes No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 29 of 75

FCE Number PCE Number N/A PCE 24-0012 NRC Report 2024 Rev.

Title:

o Revision to Procedures ACD4-OP-173, Cascade 131 Operations, and ACP4-OP-178, Cascade 131 Charging with UF6 Description of Change:

Revised ACD4-OP-173 to incorporate lessons learned from initial throughput operations by updating multiple steps within the procedure; and clarify valving in Appendices A, B, C, and D.

Revised ACP4-OP-178 to incorporate lessons learned from initial throughput operations by updating multiple steps within the procedure; incorporate new torque value information; add new section for inventory addition to all centrifuges; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Approval Date 1/9/2024 Change to SSC?

No Documents Modified Due to Change ACP4-OP-173 Chg. 15 ACP4-OP-178 Chg. 22 ISA Summary Update Required?

No Reason NRC Preapproval Not Required/Com men ts None of the criteria listed in 10 CFR 70.72(c) are met.

Page 30 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Com men ts N/A

Title:

1/9/2024 No ACP4-OP-026 Chg. 11 No None of the criteria PCE 24-0014 0

Revision to Procedures ACP4-OP-026, Scale Operations; ACP4-OP-028, ACP4-OP-028 Chg. 14 listed in 10 CFR Transport and Storage of UF6 Cylinders within the Process Building; ACP4-ACP4-OP-029 Chg. 7 70.72(c) are met.

OP-029, Inspection and Operation of UF6 Cylinder Handling Hoists and ACP4-OP-034 Chg. 8 Lifting Fixtures; and ACP4-OP-034, Inspection and Rejection of Small and Large UF6 Cylinders Description of Change:

Revised ACP4-OP-026 to provide ability to apply Tamper Indicating Devices after cylinder placement into storage; clarify steps to direct contacting Nuclear Material Control and Accountability to verify within tolerance; and made formatting and grammatical changes throughout.

Revised ACP4-OP-028 to remove receipt of cylinder section and verbiage throughout procedure as this activity will now be located within procedure ACP4-OP-034; remove form AC-755; clarify terminology for cylinder storage inspections and cylinder exterior inspections throughout; update references; and made formatting and grammatical changes throughout.

Revised ACP4-OP-029 to clarify terminology for cylinder exterior inspection and modify references.

Revised ACP4-OP-034 to clarify terminology and performance criteria for cylinder storage versus cylinder exterior inspection; add form AC-805 for cylinder inspection when placed in storage; add steps to remove empty/clean labeling from cylinder and apply tag instead; add cylinder receipt to procedure and form AC-806; remove cylinder condition only applicable for placement into storage from forms AC-703 and AC-753; clarify steps referencing new form AC-806; and update acronyms.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

2/12/2024 No ACP3-OP-002 Chg. 13 No None of the criteria PCE 24-0016 0

Revision to Procedure ACP3-OP-002, Pump Down Cart Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP3-OP-002 to allow the calibration cart to remain connected to the pump down cart between calibration activities; add steps to limit the movement of the carts when connected together and to use Maintenance Support Technicians to move/operate calibration carts; add Items Relied on For Safety stamp; clarify wording to direct personnel to contact Shift Supervisor if pressure cannot be met; add reference; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 31 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

1/25/2024 No ACP2-NM-101 Chg. 9 No None of the criteria PCE 24-0017 0

Revision to Procedure ACP2-NM-101, Accounting for Nuclear Materials listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-NM-101 to clarify source documents used for establishing accountable values; add new account number to the Nuclear Material Balance Areas list; add new Depleted Standards code to the Material Type Codes list; update forms AC-722 and AC-724 to clarify the Sample Number blocks; remove redundancy; update definitions and acronyms; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

3/14/2024 Yes NCSE-GEN-010 Rev. 3 Yes None of the criteria PCE 24-0020 0

Revision to NCSE-GEN-010, Nuclear Criticality Safety Evaluation for NCSE-GEN-003 Rev. 3 listed in 10 CFR Decontamination and Waste Operations; NCSE-GEN-003, Nuclear LA-3605-0003A Sections 70.72(c) are met.

Criticality Safety Evaluation for Portable Container Handling, Storage, and 3.7.9, 7.3.6.9.1, 7.3.6.9.3, Transportation; and LA-3605-0003A, Addendum 1 of the Integrated Safety 7.3.6.15.1, 7.3.6.15.3, 7.5, Analysis Summary for the American Centrifuge Plant - HALEU and Tables C-2-9 and C-2-15 Demonstration Description of Change:

Revised NCSE-GEN-010 and NCSE-GEN-003 to provide the ability to place fissile material into a safe volume container (SVC) or safe geometry container (SGC) while the container is in its storage rack.

Revised LA-3605-0003A Section 3.7.9 to acknowledge the ability to place fissile material into a SVC or SGC while the container is in its storage rack; revise Section 7.5 to update with the most recent revisions of NCSE-GEN-010 and NCSE-GEN-003; revise Appendix C, Tables C-2-15 and C-2-9, to reflect the scenario control changes.

Reason for the Change:

Clarify NCSE and licensing documentation.

N/A

Title:

3/19/2024 No OS-CS-131 003 Rev. 3 No None of the criteria PCE 24-0023 0

Revision to Cascade Settings Document OA-CS-131 001, (U) Cascade listed in 10 CFR 131 Centrifuge Operating Parameters 70.72(c) are met.

Description of Change:

Revised OA-CS-131-23-001 to provide improved, detailed descriptions of centrifuge and cascade characteristics based on performance during Phase 1 of HALEU operations.

Reason for the Change:

Clarify operating parameters.

NRC Report 2024 Page 32 of 75

FCE Number PCE Number N/A PCE 24-0023 N/A PCE 24-0023 N/A PCE 24-0024 NRC Report 2024 Rev.

2 0

Title:

Revision to Cascade Settings Document OA-CS-131-23-003, (U) HALEU Demonstration Cascade Operating Parameters Description of Change:

Revised OA-CS-131-23-003 is based on additional knowledge gained on how the cascade performed during the initial portion Phase 2; corrected the Cascade Settings Document number and title.

Reason for the Change:

Clarify operating parameters and corrected Cascade Settings Document number and title.

Title:

Revision to Cascade Settings Document OA-CS-131-23-003, (U) HALEU Demonstration Cascade Operating Parameters Description of Change:

Revised OA-CS-131-23-003 to add cascade parameters, locations read, and centrifuge operations to create the criteria for Cascade Operations to determine if the cascade is empty of inventory; and add sets of separation factors to use during throughput for inventory calculations.

Reason for the Change:

Clarify operating parameters.

Title:

Revision to Procedure ACP4-NM-208, Preparation and Issuance of Material Balance Reports and Inventory Reports (DOE/NRC Form 742/742C)

Description of Change:

Revised ACP4-NM-208 to update material type codes used in DOE/NRC Form 742; update the requirements for reporting to Nuclear Materials Management and Safeguards System (NMMSS); add NMMSS reports for the ACP and HALEU Demonstration; remove DOE/NRC Form 740M; update Quality Records; add a new table to include DOE Nuclear Material Type Codes; modify definitions and acronyms; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Approval Date 3/19/2024 6/12/2024 1/23/2024 Change to SSC?

No No No Documents Modified Due to Change OS-CS-131-23-003 Rev. 4 OA-CS-131-23-003 Rev. 5 ACP4-NM-208 Chg. 4 ISA Summary Update Required?

No No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 33 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

2/1/2024 No NCSE-CAS-001, Rev. 6 Yes None of the criteria PCE 24-0025 0

Revision to NCSE-CAS-001, (U) Nuclear Criticality Safety Evaluation for LA-3605-0003AG References listed in 10 CFR the Centrifuge Cascade; and LA-3605-0003AG, (U) Classified Information 70.72(c) are met.

Supporting Addendum 1 of the Integrated Safety Analysis Summary Description of Change:

Revised NCSE-CAS-001 to allow for the use of plastic to wrap piping/tubing/components or machines during helium leak detection activities.

Revised LA-3605-0003AG to update the revision number for NCSE-CAS-001 reference.

Reason for the Change:

Clarify NCSE and licensing documentation.

N/A

Title:

2/1/2024 No NCSE-CAS-004 Rev. 7 Yes None of the criteria PCE 24-0026 0

Revision to NCSE-CAS-004, Nuclear Criticality Safety Evaluation for Mass LA-3605-0003A Sections listed in 10 CFR Spectrometry Stations; and LA-3605-0003A, Addendum 1 of the 7.3.6.3.1, 7.3.6.3.3, 7.5, and 70.72(c) are met.

Integrated Safety Analysis Summary for the American Centrifuge Plant -

Table C-2-3 HALEU Demonstration Description of Change:

Revised NCSE-CAS-004 to evaluate removal; handling, storage, and replacement of the pump on the mass spectrometer. The revised analysis and controls ensure the probability of a criticality accident for this operation is "highly unlikely" meeting the performance requirement of 10 CFR 70.61.

Revised LA-3605-0003A to update the controls of subsection 7.3.6.3; Section 7.5 to reflect the most recent revision of NCSE-CAS-004; and update Appendix C (Table C-2-3) to reflect the scenario control changes.

Reason for the Change:

Clarify NCSE and licensing documentation.

N/A

Title:

1/29/2024 No ACP2-EG-010 Chg. 11 No None of the criteria PCE 24-0027 0

Revision to Procedure ACP2-EG-010, Nuclear Criticality Safety Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-EG-01 Oto remove reference to form AC-736 as there was no driver procedure for this form; and add Appendix D for an example of a Fissile Material Operations Assessment Checklist.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2014 Page 34 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

2/8/2024 No ACP2-CM-005 Chg. 0 No None of the criteria PCE 24-0030 0

New Procedure ACP2-CM-005, Chemical Trap Media Change listed in 10 CFR Description of Change:

70.72(c) are met.

ACP2-CM-005 was developed to provide the capability to perform in-situ media change out for the withdrawal chemical traps with the nuclear criticality safety flow down from the newly revised NCSE-MNT-004, Nuclear Criticality Safety Evaluation for Trap Media Removal.

Reason for the Change:

Implement procedure requirements.

N/A

Title:

2/5/2024 No ACP2-ST-217 Chg. 3 No None of the criteria PCE 24-0031 0

Revision to Procedure ACP2-ST-217, CAAS Testing listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-ST-217 to clarify precautions and action steps for ease of procedure and form use; add new steps to clarify response to an unplanned Criticality Accident Alarm System (CAAS) Evacuation alarm while CAAS is declared inoperable; provide additional instructions about hearing protection; address the Uninterruptable Power Supply door and fans if the door is to be left open; establish communications between the Area Control Room and field testing personnel prior to any actions that will result in indication changes, faults, or alarms; correct the speaker circuit junction box colors in steps and on form AC-787; add Appendix P for specific instructions for the Fluke 1238 Industrial Scopemeter; and reformat form AC-792 for ease of use during testing.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

2/5/2024 No ACP2-CM-001 Chg. 5 No None of the criteria PCE 24-0032 0

Revision to Procedure ACP2-CM-001, Chemical Trap Change listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-CM-001 to perform a periodic review; address new guidance regarding trap media reinstallation following trap installation; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 35 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Com men ts N/A

Title:

2/14/2024 No ACP2-CM-002 Chg. 6 No None of the criteria PCE 24-0033 0

Revision to Procedure ACP2-CM-002, Removal, Handling and Storage of listed in 10 CFR Uranium Contaminated Process Equipment 70.72(c) are met.

Description of Change:

Revised ACP2-CM-002 to flow down the requirements of NCSE-CAS-004, Nuclear Criticality Safety Evaluation for Mass Spectrometry Stations (Revision 7) for removal and replacement of pumps; update references; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

2n/2024 No ACP2-NM-111 Chg. 7 No None of the criteria PCE 24-0035 0

Revision to Procedure ACP2-NM-111, Control and Usage of Tamper listed in 10 CFR Indicating Devices 70.72(c) are met.

Description of Change:

Revised ACP2-NM-111 to ensure empty items without Tamper Indicating Devices (TIDs) are verified during static inventory; ensure TIDs are applied as soon as cylinders are accepted by Quality Assurance; update current TIDs being used; remove plastic bag verbiage; update form AC-706 to allow space for two TIDs to be written on the first line; update references; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

2/8/2024 No ACP2-CM-001 Chg. 6 No None of the criteria PCE 24-0037 0

Revision to Procedure ACP2-CM-001, Chemical Trap Change listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-CM-001 to address comments discovered during performance of the previous withdrawal trap change; modify steps; add tools and supplies; consolidate "like" Precautions for readability; add specifications for torque values; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 36 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

3/5/2024 Yes NCSE-FWS-007 Rev. 2 Yes None of the criteria PCE 24-0043 0

Revision to NCSE-FWS-007, Nuclear Criticality Safety Evaluation for LA-3605-0003A Sections listed in 10 CFR Small UF6 Cylinders and Samples; and Revision to LA-3605-0003A, 3.6.3.4, 3.6.5.1, 7.3.6.5.1, 70.72(c) are met.

Addendum 1 of the Integrated Safety Analysis Summary for the American 7.3.6.5.3, 7.5, and Table C Centrifuge Plant - HALEU Demonstration 5

Description of Change:

Revised NCSE-FWS-007 due to extensive changes needed to update the safety basis to support the normal and credible abnormal conditions, which add new nuclear criticality safety (NCS) passive engineered features and administrative control changes to support operational flexibility for handling, storage, and transport of sample/standard tubes and small diameter UF6 cylinders; add supporting NCS calculations to support NCSE passive engineered features and administrative control changes; add several hundred DOE supplied UF6 standard tubes and small diameter UF6 cylinders for storage and/or use to support mass spectrometer operations; and add NCSE improvements and clarifications identified in recent NCS audits.

Revised LA-3605-0003A to add a description of UF6 sample/standard tubes and small diameter cylinders used for the mass spectrometer as identified in the NCSE-FWS-007 revision; update the NCSE-FWS-007 reference with the most recent revision; and made grammatical changes throughout.

Reason for the Change:

Clarify NCSE and licensing documentation.

N/A

Title:

2/26/2024 No PLD1-SP-024PD Rev. 6 No None of the criteria PCE 24-0046 0

Revision to Procedure PLD1-SP-024PD, Operations Security Plan listed in 10 CFR Description of Change:

70.72(c) are met.

Revised PLD1-SP-024PD as a result of the annual review performed in accordance with NR-SP-ACO-OR-0001, Security Program for American Centrifuge Operating, LLC at Oak Ridge, TN; and the periodic review performed in accordance with procedure PLD1 -GA-003, Development, Issue, and Maintenance of Procedures; add references; reorganize steps for better flow; add additional items to Appendix A; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 37 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

3rT/2024 No PLD1-SP-024PD Rev. 6 No None of the criteria PCE 24-0046 Revision to Procedure PLD1-SP-024PD, Operations Security Plan (MAC-1) listed in 10 CFR Description of Change:

70.72(c) are met.

Revised PLD1-SP-024PD to update the classification review box on the cover page; update the header and Change Control Page to include MAC 1; update Table of Contents; and add the OPSEC Self-Assessment Report to Section 11.2.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

3/11/2024 No PLD1-SP-024PD Rev. 6 No None of the criteria PCE 24-0046 2

Revision to Procedure PLD1-SP-024PD, Operations Security Plan (MAC-1) listed in 10 CFR Description of Change:

70.72(c) are met.

Revised the change evaluation form AC-001 to provide the correct answer to the Question "If this change is a Revision, was the PCE Revision Number obtained from the database?" which was inadvertently marked as N/A on Revision 1 of this change evaluation. Additionally, revised form AC-001 to remove the entry for the line to note any "Previously Approved Reference" and the N/A box remained checked. Lastly, revised the decrease of effectiveness evaluation form AC-002 to provide the reason/technical basis for the change under Question 1.8. that was inadvertently missing under Revision 1 of the change evaluation. No additional changes were made to procedure PLD1 -SP-024PD R6 (MAC-1 ).

Reason for the Change:

To correct deficiencies noted with Revision 1 of the change evaluation.

N/A

Title:

2/23/2024 No ACP4-OP-178 Chg. 23 No None of the criteria PCE 24-0047 0

Revision to Procedure ACP4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-178 to incorporate engineering guidance and elements learned during the initial feed cylinder burping executed during operations; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 38 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

3/14/2024 Yes NCSE-GEN-002 Rev. 3 Yes None of the criteria PCE 24-0048 0

Revision to NCSE-GEN-002, Nuclear Criticality Safety Evaluation for LA-3605-0003A Sections listed in 10 CFR Portable Gulpers; and LA-3605-0003A, Addendum 1 of the Integrated 7.3.6.8.1, 7.3.6.8.3, 7.5, and 70.72(c) are met.

Safety Analysis Summary for the American Centrifuge Plant - HALEU Table C-2-8 Demonstration Description of Change:

Revised NCSE-GEN-002 to address Dispersed Oil Particulate (DOP)

Testing that will be performed for the High Efficiency Particulate Air filters contained within the gulpers and vacuums; address changeout of gulper chemical trap media as a normal condition activity, as well as clarifying that checking the contents of the material collection container of the vacuum is a normal condition operation; add new administrative control to govern the selection of oils used for DOP testing; and made additional clarifications and corrections throughout.

Revised LA-3605-0003A to flow down the revised requirements of NCSE-GEN-002; update Section 7.5 to reflect the most recent revision of NCSE-GEN-002; and update Appendix C (Table C-2-8) to reflect the scenario control changes.

Reason for the Change:

Clarify NCSE requirements.

NIA

Title:

3/25/2024 No LA-3605-0001 Table 4.7-1 No None of the criteria PCE 24-0054 0

Revision to LA-3605-0001, License Application for the American listed in 10 CFR Centrifuge Plant 70.72(c) are met.

Description of Change:

Revised LA-3605-0001 Table 4.7.1, Routine Contamination Survey Frequencies, to remove the phrase "(i.e., Monday through Friday)" from footnote C to align with the four-day work week currently in affect at the American Centrifuge Plant.

Reason for the Change:

Clarify licensing documentation.

NRC Report 2024 Page 39 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

3/13/2024 No ACP4-NM-210 Chg. 1 No None of the criteria PCE 24-0058 0

Revision to Procedure ACP4-NM-210, Tracking/Monitoring of Nuclear listed in 10 CFR Material Measurement Systems 70.72(c) are met.

Description of Change:

Revised ACP4-NM-210 to better align with the current filing system; clarify the precision and accuracy review sections; update statistician and Measurement Control Coordinator functions; update titles of Quality Records; update references and acronyms; remove redundancy; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

3/15/2024 No ACP4-OP-066 Chg. 16 No None of the criteria PCE 24-0060 0

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-066 to add steps related to the manifold pressure, evacuate manifold to find leak and correct; change steps to note boxes; clarify steps related to weighing; remove table and replace with reference to procedure ACP2-PT-009, Appendix C; add note box that Health Physics will need to be contacted prior to breaking any connections; add table to capture valves and associated mass spectrometers; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

3/19/2024 No ACP4-NM-211 Chg. 1 No None of the criteria PCE 24-0061 0

Revision to Procedure ACP4-NM-211, Monitoring the Performance of listed in 10 CFR Mass Measurement Systems 70.72(c) are met.

Description of Change:

Revised ACP4-NM-211 to better align with the current contractor guidelines; clarify the certification of mass standards; reorder steps for clarity; update references and records; made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 40 of 75

FCE Number PCE Number Rev.

N/A PCE 24-0065 0

N/A PCE 24-0066 0

N/A PCE 24-0066 NRC Report 2024

Title:

Revision to Procedure ACP4-NM-215, Item Monitoring Program Description of Change:

Revised ACP4-NM-215 to clarify the Nuclear Materials Accounting System functions, methodology, and provide guidance on attaching the form rather than writing on the form; add a step for use of hard copies if the Nuclear Materials Accounting System is unavailable for printouts; and clarify reports are generated in the accounting system.

Reason for the Change:

Clarify procedure requirements.

Title:

New Engineering Service Order ESO-3100-0111, HALEU Operations Mass Spectrometer Standards Storage Description of Change:

ESO-3100-0111 was developed to implement a proposed modification that provides storage for mass spectrometer standards for HALEU operations; include Certified-For-Construction (CFC) package CFC-1 that will provide a customized heavy-duty commercial steel storage cabinet for storage of mass spectrometer standards.

Reason for the Change:

Storage capacity is necessary to ensure availability and protection of standards required for operation of the mass spectrometers.

Title:

Revised Engineering Service Order ESO-3100-0111, HALEU Operations Mass Spectrometer Standards Storage Description of Change:

ESO-3100-0111 was revised to add Certified for Construction (CFC) 2 to the scope that was evaluated in PCE 24-0066 Revision 0. The added scope includes a new concrete pad and anchors for the new storage cabinets for mass spectrometer standards in Hoke Tubes and for 1 S and 2S cylinders. The scope also includes engineering input, design, and output documents to support construction and field installation.

Reason for the Change:

Multiple storage cabinets and a designated storage area is needed to accommodate additional standards. The cabinets and storage area are designed to meet the requirements of NCSE-FWS-007, Nuclear Criticality Safety Evaluation for Small UF6 Cylinders and Samples (Revision 2).

ISA Summary Reason NRC Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Com men ts 3/25/2024 No ACP4-NM-215 Chg. 4 No None of the criteria listed in 10 CFR 70.72(c) are met.

3/22/2024 Yes ESO-3100-0111 Rev. 0 No None of the criteria listed in 10 CFR 70.72(c) are met.

11/6/2024 Yes ESO-3100-0111, CFC-2 Rev.

No None of the criteria 0

listed in 10 CFR 70.72(c) are met.

Page 41 of 75

FCE Number PCE Number NIA PCE 24-0067 NIA PCE 24-0069 N/A PCE 24-0070 NRC Report 2024 Rev.

Title:

o New Engineering Service Order ESO-3100-0112, HALEU Operations 308 and 128 Storage Area Description of Change:

ESO-3100-0112 was written to establish a storage area for 308 cylinders; and modify the current 128 storage area to increase the number of fixed storage positions.

Reason for the Change:

Additional storage positions are necessary to support continued operation of the HALEU cascade.

Title:

o Revision to Engineering Evaluation EE-3901-0079, IROFS Boundary Determination for BDD-H-104-1 c Description of Change:

Revised EE-3901-0079 to evaluate failure of the power supply, and/or its associated fused circuit, in a manner that results in loss of only the negative 15 Voltage Direct Current output, as a credible but unlikely event, and that the potential for blown fuses is most likely during maintenance or system warm-up, not during normal operations.

Reason for the Change:

Clarify Engineering Evaluation requirements.

Title:

o Revision to Procedure ACP2-TP-009, On-Site Transportation of Inventory and Off-Site Sample Shipment Description of Change:

Revised ACP2-TP-009 to flow down limitations and conditions for the non-fissile material operation (NFMO) evaluated in Engineering Evaluation EE-3101-0099, Non-Fissile Material Operation (NFMO) for Removal and Storage of Hoke Tubes HT970470 and HT970477 / Receipt and Transport of Hoke Tubes HT970384 and HT970385 (Revision 1 ); add a new section to handle Hoke Tube activities; clarify segregation requirements for items prior to quality control acceptance; add Items Relied on For Safety stamp and updated references; and remove unnecessary Regulatory approval where needed.

Reason for the Change:

Clarify procedure requirements.

Approval Date 3/21/2024 3/25/2024 3/28/2024 Change to SSC?

Yes Yes No Documents Modified Due to Change ESO-3100-0112 Rev. 0 EE-3901-0079 Rev. 3 ACP2-PT-009 Chg. 5 ISA Summary Update Required?

No No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 42 of 75

FCE Number PCE Number Rev.

N/A PCE 24-0073 0

N/A PCE 24-0074 0

N/A PCE 24-0075 0

NRC Report 2024

Title:

Cancellation of Procedure ACP4-ON-102, Loss of Evacuation Vacuum and Revision to Procedure ACD4-ON-015, Response to a Complete Loss of Vacuum Description of Change:

Canceled ACP4-ON-102 due to information being consolidated into a revision to procedure ACD4-ON-015 which adds a section to include previously evaluated ACP4-ON-102 to include both Loss of Evacuation Vacuum and Loss of Purge Vacuum into the same procedure; update procedure name; reorganize table to be consistent with other procedures; update procedure title of ACD3-FO-002 throughout; add steps to initiate 14-day tracker where applicable; add note and step to rest a tripped or shutdown pump; add caution note and step to isolate Vacuum Cooling Water from a non-operating pump shutdown; valve nomenclature; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

New Procedure ACP4-FS-002, Building Surveys Description of Change:

ACP4-FS-002 was written for conducting periodic fire surveys/inspections for the HALEU Demonstration program.

Reason for the Change:

Implement procedure requirements.

Title:

Revision to Procedures ACP2-OP-034, Generation, Handling, Transportation, and Storage of Fissile Containers; and ACP2-CM-004, Field Decontamination Description of Change:

Revised ACP2-OP-034 to incorporate flow down of revised controls from NCSE-GEN-003, Nuclear Criticality Safety Evaluation for Portable Container Handling, Storage, and Transportation (Revision 3) and NCSE-GEN-01 O Nuclear Criticality Safety Evaluation for Decontamination and Waste Operations (Revision 3); and made formatting changes throughout.

Revised ACP2-CM-004 to incorporate flow down of revised controls from NCSE-GEN-010 (Revision 3); add definitions; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

ISA Summary Reason NRC Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments 4/2/2024 No ACP4-ON-102 Chg. 2 No None of the criteria ACD4-ON-015 Chg. 2 listed in 10 CFR 70.72(c) are met.

4/10/2024 No ACP4-FS-002 Chg. 0 No None of the criteria listed in 10 CFR 70.72(c) are met.

4/8/2024 No ACP2-OP-034 Chg. 4 No None of the criteria ACP2-CM-004 Chg. 4 listed in 10 CFR 70.72(c) are met.

Page 43 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments NIA

Title:

4/8/2024 No ACP4-NM-213 Chg. 1 No None of the criteria PCE 24-0076 0

Revision to Procedure ACP4-NM-213, Monitoring the Performance of listed in 10 CFR Process Instrumentation 70.72(c) are met.

Description of Change:

Revised ACP4-NM-213 to better align with the current monitoring activities of the mass spectrometer and calibration data; move steps related to the monitoring of dynamic inventory to the appropriate procedure; update classification marking; remove redundancy; update references and records; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

4/10/2024 No ACP2-NM-104 Chg. 4 No None of the criteria PCE 24-0077 0

Revision to Procedure ACP2-NM-104, Nuclear Material Measurement listed in 10 CFR Controls 70.72(c) are met.

Description of Change:

Revised ACP2-NM-104 to better align with the current controls for the on-line mass spectrometer measurements; clarify mass measurement replicate program requirements; clarify returning field scales back to service; remove redundant information; clarify response actions, control data review, and update control limits; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

4/9/2024 No ACP4-OP-031 Chg. 16 No None of the criteria PCE 24-0078 0

Revision to Procedures ACP4-OP-031, Tails Cold Box Operation; and ACP4-OP-032 Chg. 15 listed in 10 CFR ACP4-OP-032, Product Cold Box Operation 70.72(c) are met.

Description of Change:

Revised ACP4-OP-031 and ACP4-OP-032 to clarify proper pigtail-cylinder valve connection alignment; add a second verification of proper pigtail alignment prior to opening cylinder valves; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 44 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

5/2/2024 No SP-3605-0042 Sections 4.5 No None of the criteria PCE 24-0082 0

Non-Substantive Changes to SP-3605-0042, Security Plan for the Physical and 9.0 listed in 10 CFR Protection of Special Nuclear Material at the American Centrifuge Plant 70.72(c) are met.

Description of Change:

The non-substantive changes clarify Section 4.5, Keys and Locks, which provides information as to the locking system design chosen for the Category II Special Nuclear Material of Moderate Strategic Significance storage area. This design affords a more robust protection strategy.

Reason for the Change:

The non-substantive changes to SP-3605-0042 are being made to satisfy AC Regulatory Action #17106 resulting from discussions held with the NRC inspectors during the 2023 NRC inspection. The changes clarify the use of locking mechanisms on doors of the Category II SNM-MSS storage area. The other changes include general grammatical and formatting corrections identified during review of the plan, and to correct the title of the Regulatory Guide 5.52 as identified in Security Commitment Action

  1. 17615.

The changes to SP-3605-0042 will not alter the design or performance of any item or activity as described in the Integrated Safety Analysis (ISA)

Summary for the American Centrifuge Plant (ACP) or the Addendum 1 of the ISA Summary for the ACP - HALEU Demonstration.

N/A

Title:

4/24/2024 No ACP2-CM-002 Chg. 7 No None of the criteria PCE 24-0083 0

Revision to Procedure ACP2-CM-002, Removal, Handling and Storage of listed in 10 CFR Uranium Contaminated Process Equipment 70.72(c) are met.

Description of Change:

Revised ACP2-CM-002 to clarify steps and notes to allow the pumps to be moved for Non-Destructive Analysis (NOA) once already stored on the storage pad.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 45 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments NIA

Title:

4/17/2024 No ACP3-ST-002 Chg. 14 No None of the criteria PCE 24-0084 0

Revision to Procedure ACP3-ST-002, HALEU Tails Cold Box IROFS listed in 10 CFR Surveillance Testing and Calibration 70.72(c) are met.

Description of Change:

Revised ACP3-ST-002 to add a prerequisite; change the purpose; add steps to verify voltage prior to and following removing power from transmitter; remove specific requirements for Operations or Maintenance to operate various equipment; correct a Reference; remove steps that were no longer needed; add to record "Yes/No" steps to Appendix A for the "As Found" and "As Left" as required in Section 7.8; steps requiring documentation were split apart to clarify and to highlight the need for documentation; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

4/24/2024 Yes ESO-3100-0145 Rev. 0 No None of the criteria PCE 24-0086 0

New Engineering Service Order ESO-3100-0145, Phase 2 Fissile Materials listed in 10 CFR Storage Area Expansion 70.72(c) are met.

Description of Change:

ESO-3100-0145 implements a modification to expand the HALEU Demonstration Fissile Materials Storage Area (FMSA), to support continued production during Phase 2 of the DOE contract for Certified-For-Construction design release CFC-4; relocate existing storage racks for safe volume containers (SVC) and safe geometry containers (SGC);

fabricate additional SVC storage racks; position and weld all storage racks within the existing covered storage area; and procurement of additional SVCs and SGCs.

Reason for the Change:

Continued production requires additional capacity for items stored in SVCs and SGCs. This modification provides additional containers and racks, and installation of existing and new racks within the existing storage area, in a manner that maximizes utilization of floor space while meeting NCSE and license requirements.

NIA

Title:

8/28/2024 Yes ESO-3100-0145 Rev. 1 No None of the criteria PCE 24-0086 Revision to Engineering Service Order ESO-3100-0145, Phase 2 Fissile listed in 10 CFR Materials Storage Area Expansion 70.72(c) are met.

Description of Change:

Revised ESO-3100-0145 for Certified for Construction (CFC) 1-3 design release which includes the expansion of 5B cylinder storage which includes the addition of floor plates, structural anchorage, and sleeves; and to reconfigure security features.

Reason for the Change:

Continued production requires additional capacity for secure storage of 5B cylinders.

NRC Report 2024 Page 46 of 75

FCE Number PCE Number Rev.

N/A PCE 24-0087 0

N/A PCE 24-0088 0

NRC Report 1024

Title:

Revision to Procedure ACP4-OP-178, Cascade 131 Charging with UF6 Description of Change:

Revised ACP4-OP-178 to incorporate lessons learned from previous operating experiences throughout procedures; update Items Relied on For Safety stamps; update references; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

Revision to NR-3605-0005B, Addendum 1 of the Fundamental Nuclear Material Control Plan for the American Centrifuge Plant - HALEU Demonstration Description of Change:

Revised NR-3605-0005B to add a new section and reference a new Table to describe the replicate measurements that are performed for HALEU Demonstration.

Reason for the Change:

Clarify licensing documentation.

Approval Date 4/24/2024 5/30/2024 ISA Summary Reason NRC Change Documents Modified Update Preapproval Not to SSC?

Due to Change Required?

Required/Comments No ACP4-OP-178 Chg. 24 No None of the criteria listed in 10 CFR 70.72(c) are met.

No NR-3605-0005B Table of No None of the criteria Contents, List of Tables, listed in 10 CFR Section 6.5, and Table 6.1 70.72(c) are met.

Page 47 of 75

FCE Number PCE Number N/A PCE 24-0090 N/A PCE 24-0091 NRC Report 1024 Rev.

Title:

o Revision to Procedures ACP4-AR-074, Cold Box Alarms and Responses; ACP4-OP-031, Tails Cold Box Operation; ACP4-OP-032, Product Cold Box Operation; and ACP4-OP-074, Cold Box Withdrawal Mode Operations Description of Change:

Revised ACP4-AR-074 to change alarm responses as required throughout; remove unnecessary Items Relied on For Safety stamp 7.3.6.4 where needed; add recycle mode as an option to transition to; add the need to notify Operations management prior to returning the cold box to service; and made formatting changes throughout.

Revised ACP4-OP-031 to change valve tables to ensure hand valves are open to evacuate dead end sections of manifold; add a note box; clarify ambient temperature; and made formatting changes throughout.

Revise ACP4-OP-032 to change valve tables to evacuate dead end sections of manifold; add a note box; merge steps; clarify ambient temperature; and made formatting changes throughout.

Revised ACP4-OP-074 to add steps throughout procedure to confirm proper valve alignment according to Appendix A after mode transition.

Reason for the Change:

Clarify procedure requirements.

Title:

o Revision to Procedures ACP2-FS-001, Combustible Material Control Program, and ACP2-FS-002, Flammable and Combustible Liquids Description of Change:

Revised ACP2-FS-001 to update a step to use the definition of a fossil fueled vehicle to match the updated Item Relied on For Safety (IROFS) 7.3.1.3; add note based on an exception added to IROFS 7.3.1.5; add reference to Fire Hazard Analysis (FHA); and made formatting and grammatical changes throughout.

Revised ACP2-FS-002 to update a step to use the definition of a fossil fueled vehicle to match the updated IROFS 7.3.1.3; add note based on an exception added to IROFS 7.3.1.5; clarify a note to be consistent with procedure ACP2-FS-001 ; add reference to FHA; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Approval Date 4/29/2024 6/18/2024 Change to SSC?

No No Documents Modified Due to Change ACP4-AR-074 Chg. 7 ACP4-OP-031 Chg. 18 ACP4-OP-032 Chg. 16 ACP4-OP-074 Chg. 9 ACP2-FS-001 Chg. 4 ACP2-FS-002 Chg. 3 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 48 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

4/30/2024 No ACP4-OP-066 Chg. 19 No None of the criteria PCE 24-0092 0

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-066 to add a conditional step in the event the defined leak rate criteria for the mass spectrometer standard disconnect cannot be obtained.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

5/9/2024 No ACP4-OP-051 Chg. 11 No None of the criteria PCE 24-0093 0

Revision to Procedures ACP4-OP-051, Inventory Removal; and ACP4-OP-ACP4-OP-178 Chg. 25 listed in 10 CFR 178, Cascade 131 Charging with UF6 70.72(c) are met.

Description of Change:

Revise ACP4-OP-051 to update scope and prerequisites; add a note; add the ability to remove inventory; update a step based on previous lessons learned from operating experience; clarify a warning box; update steps to postpone cylinder connection/disconnections while inventory removal is using the shared Evacuation Vacuum header; and add steps to prevent cylinder connections to respective cold boxes.

Revised ACP4-OP-178 to update new leak rate consistent with lessons learned from operating experience; and update acronyms.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

5/9/2024 No ACP2-AR-217 Chg. 6 No None of the criteria PCE 24-0094 0

Revision to Procedure ACP2-AR-217, CAAS Alarm Response listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-AR-217 to add system information, improve responses to Criticality Accident Alarm System (CAAS) alarms and faults; clarify the operation of the CAAS Fault Sounder Inhibit and System Reset key switches; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 49 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

5/17/2024 No ACP4-OP-178 Chg. 26 No None of the criteria PCE 24-0098 0

Revision to Procedure ACP4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-178 to provide consistency between different sections regarding conducting leak rates of the feed cylinder pigtail.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

9/17/2024 No ACP4-OP-178 Chg. 26 No None of the criteria PCE 24-0098 Revision to Procedure ACP4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR Description of Change:

70.72(c) are met.

Revised the change evaluation form AC-001 to provide the reason/technical basis for the change under Question 1 B.

Reason for the Change:

To correct deficiencies noted with Revision 0 of the change evaluation.

N/A

Title:

5/23/2024 No ACP4-OP-028 Chg. 15 No None of the criteria PCE 24-0100 0

Revision to Procedure ACP4-OP-028, Transport and Storage of UF6 listed in 10 CFR Cylinders within the Process Building 70.72(c) are met.

Description of Change:

Revised ACP4-OP-028 to provide a preliminary alignment check for the pigtail to cylinder connection.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

10/14/2024 No ACP4-OP-028 Chg. 15 No None of the criteria PCE 24-0100 Revision to Procedure ACP4-OP-028, Transport and Storage of UF6 listed in 10 CFR Cylinders within the Process Building 70.72(c) are met.

Description of Change:

Revised the change evaluation form AC-001 to provide the reason/technical basis for the change under Question 1 B.

Reason for the Change:

To correct deficiencies noted with Revision 0 of the change evaluation.

NRC Report 2024 Page 50 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

11/11/2024 No ACP4-OP-028 Chg. 15 No None of the criteria PCE 24-0100 2

Revision to Procedure ACP4-OP-028, Transport and Storage of UF6 listed in 10 CFR Cylinders within the Process Building 70.72(c) are met.

Description of Change:

Revised the change evaluation form AC-001 to provide an answer to the Question "If this change is a Revision, was the PCE Revision Number obtained from the database?" which not formally obtained from the database. No additional changes were made to procedure ACP4-OP-028.

Reason for the Change:

To correct deficiencies noted with Revision 1 of the change evaluation.

NIA

Title:

5/31/2024 No ACP4-OP-066 Chg. 20 No None of the criteria PCE 24-0103 0

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-066 to flow down requirements from NCSE-FWS-007, Nuclear Criticality Safety Evaluation for Small UF6 Cylinders and Samples (Revision 2); made changes needed as a result of corrective actions for shared evacuation sampling clarifications; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

6/20/2024 No NR-SP-ACO-OR-0001 Figure No None of the criteria PCE 24-0106 0

Revision to NR-SP-ACO-OR-0001, Security Program for American 2 and document footer listed in 10 CFR Centrifuge Operating, LLC at Oak Ridge, Tennessee 70.72(c) are met.

Description of Change:

Revised NR-SP-ACO-OR-0001 to update Figure 2 to add a new office space within the Document Management Center and to remove the Controlled Unclassified Information banner marking (CUI // SP-SRI) which is not required for the footer of this entire document.

Reason for the Change:

Clarify licensing documentation.

NRC Report 2024 Page 51 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

6/6/2024 No ACP2-ON-217 Chg. 5 No None of the criteria PCE 24-0109 0

Revision to Procedure ACP2-ON-217, CMS Off-Normal Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-ON-217 to improve instructions on establishing Criticality Accident Alarm System (CMS) Immediate Evacuation Zone (IEZ) boundaries by adding notification and reporting actions for planned CMS outages; add a new Appendix K to include a map of IEZ boundary locations; and add a step for notification actions once CMS is declared operable.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

7/9/2024 Yes ESO-3100-0170 Rev. 0 No None of the criteria PCE 24-0111 0

New Engineering Service Order ESO-3100-0170, X7725 Rm. 62 Chiller listed in 10 CFR 1021 70.72(c) are met.

Description of Change:

ESO-3100-0170 requests replacement of the C-1021 chiller and evaluates the use of a rental chiller for short term needs. ESO-3100-0170 also requests an evaluation of whether the supplemental cooling capacity of C-1514 is needed for ACP operations.

Reason for the Change:

Install temporary replacement rental chiller.

N/A

Title:

6/24/2024 No ACP4-OP-026 Chg. 16 No None of the criteria PCE 24-0112 0

Revision to Procedure ACP4-OP-026, Scale Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-026 to add a section for Post Maintenance Testing and Diagnostic checks; change form AC-811 title and content for use with a scale; add a step for the use of forklifts; add references; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 52 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

7/9/2024 No ACP2-PT-009 Chg. 6 No None of the criteria PCE 24-0113 0

Revision to Procedure ACP2-PT-009, On-Site Transportation of Inventory listed in 10 CFR and Radioactive Material Shipment and Receipt 70.72(c) are met.

Description of Change:

Revised ACP2-PT-009 to clarify the procedure is applicable to onsite transport and storage of UF6 samples and standards; eliminate steps no longer applicable since the standards in question have already been placed into storage; clarify a Section to flow down from NCSE-FWS-007, Nuclear Criticality Safety Evaluation for Small UF6 Cylinders and Samples (Revision 2); delete a section On-Site Transport Outside of ACP buildings since it was determined to no longer be required; add a section for the Shipment of UF6 Samples, UF6 Standards, or Vent Monitoring Traps; create a new form AC-813 and add as a Quality Record; delete a reference; update acronyms; develop form AC-813 to flow down the new NCSE-FWS-007 requirement to independently verify gram quantities of shipments prior to allowing the shipment on-site; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

7/9/2024 No ACP4-SH-102 Chg. 0 No None of the criteria PCE 24-0116 0

New Procedure ACP4-SH-102, Operation of Sound Level Meters listed in 10 CFR Description of Change:

70.72(c) are met.

ACP4-SH-102 was created to provide the capability to collect additional sound level data (decibel levels) to support HALEU operations (audibility measurements).

Reason for the Change:

New procedure requirements.

NRC Report 2024 Page 53 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

8/8/2024 Yes NCSE-GEN-003 Rev. 4 Yes None of the criteria PCE 24-0118 0

Revision to NCSE-GEN-003, Nuclear Criticality Safety Evaluation for LA-3605-0003A Sections listed in 10 CFR Portable Container Handling, Storage, and Transportation; and Revision to 7.3.6.9.1, 7.3.6.9.3, 7.5, and 70.72(c) are met.

LA-3605-0003A, Addendum 1 of the Integrated Safety Analysis Summary Table C-2-9 for the American Centrifuge Plant - HALEU Demonstration Description of Change:

Revised NCSE-GEN-003 to provide Nuclear Criticality Safety coverage for use of a new device for checking the pressure in partially filled UF6 cylinders; and add four new administrative controls and one new passive control governing the use of and construction of the cylinder pressure check apparatus.

Revised LA-3605-0003A to add and revise sections to flow down the NCSE-GEN-003 changes; update the revision number for the NCSE-GEN-003 reference; and update Table C-2-9 events.

Reason for the Change:

Clarify NCSE and licensing documentation.

N/A

Title:

7/9/2024 Yes ECR-3100-015-030 Rev. 0 No None of the criteria PCE 24-0119 0

New Engineering Change Request ECR-3100-015-030, Group Policy JFl-3200-0028 Rev. 0 listed in 10 CFR Management, and Job Field Instruction JFl-3200-0028, Group Policy 70.72(c) are met.

Change to Log Scripting Description of Change:

ECR-3100-0015-030 and JFl-3200-0028 provide the guidance for performing changes to the group policy programming on the Distributed Control System for processing and archiving data logs.

Reason for the Change:

To document consistent guidance for the individuals with the authorization to make programmatic changes.

N/A

Title:

7/11/2024 No ACP4-OP-039 Chg. 0 No None of the criteria PCE 24-0120 0

New Procedure ACP2-OP-039, Operations Inventory listed in 10 CFR Description of Change:

70.72(c) are met.

ACP2-OP-039 was developed to provide an overview of operations activities in performing material inventories; interactions with other groups; and reference other procedures already written, evaluated, and implemented.

Reason for the Change:

Implement procedure requirements.

NRC Report 2014 Page 54 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

7/24/2024 No ACP4-OP-031 Chg. 20 No None of the criteria PCE 24-0125 0

Revision to Procedures ACP4-OP-031, Cold Box Operation; and ACP4-OP-ACP4-OP-032 Chg. 18 listed in 10 CFR 032, Cold Box Operation 70.72(c) are met.

Description of Change:

Revised ACP4-OP-031 to allow for the cycling of cold box chamber power for maintenance and testing operations within specified time limits; clarify action steps for pigtail connections between flange end and the cylinder end; specify the handling, inspection, and/or disposal of used connection parts; add additional part inspections to form AC-733; add a conditional step if cylinder and tag numbers do not match; and made formatting and grammatical changes throughout.

Revised ACP4-OP-032 to allow for the cycling of cold box chamber power for maintenance and testing operations within specified time limits; clarify action steps for pigtail connections between the flange end and the cylinder end; specify the handling, inspection, and/or disposal of used connection parts; add additional part inspections to form AC-747; add conditional step if cylinder and tag numbers do not match; change terminology throughout for precision and consistency; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

9/17/2024 No ACP4-OP-031 Chg. 20 No None of the criteria PCE 24-0125 Revision to Procedures ACP4-OP-031, Cold Box Operation; and ACP4-OP-ACP4-OP-032 Chg. 18 listed in 10 CFR 032, Cold Box Operation 70.72(c} are met.

Description of Change:

Revised the change evaluation form AC-001 to provide the reason/technical basis for the change under Question 1 B.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

N/A

Title:

7/29/2024 Yes ECR-3100-0015-031 Rev. 0 No None of the criteria PCE 24-0128 0

New Engineering Change Record ECR-3100-0015-031, DCS Server JFl-3200-0029 Rev. 0 listed in 10 CFR Changeout; and New Job Field Instruction JFl-3200-0029, (U) DCS Server 70.72(c) are met.

Changeout Description of Change:

ECR-3100-0015-031 and JFl-3200-0029 were developed to provide the guidance for performing removal and replacement of server components on the Distributed Control System for processing and archiving data logs.

Reason for the Change:

To document consistent guidance for the individuals with the authorization to perform the physical removal and replacement of the server components.

NRC Report 2024 Page 55 of 75

FCE Number PCE Number N/A PCE 24-0129 N/A PCE 24-0130 N/A PCE 24-0131 RC Report 2024 Rev.

0 0

Title:

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation Description of Change:

Revised ACP4-OP-066 to point to the new Appendix F for Authorized UF6 Standards; and add a reference.

Reason for the Change:

Clarify procedure requirements.

Title:

New Engineering Service Order ESO-3100-0150, Partial Cylinder Pressure Check Device Description of Change:

ESO-3100-0150 was developed to support the design and fabrication of a new portable pressure measurement device for performing internal pressure checks of partially filled UF6 cylinders.

Reason for the Change:

The original intent to use a pump down cart to measure cylinder pressure, which was determined to pose a significant risk of overloading or saturating the pump down cart chemical trap. The portable cylinder pressure check gauge was developed in response to this concern.

Title:

o Revision to Procedure ACP4-OP-178, Cascade 131 Charging with UF6 Description of Change:

Revised ACP4-OP-178 to provide more detailed actions and component clarification for pigtail connections on the panel and the 308 feed cylinder; add steps to clarify the inspection, handling, and disposal of pigtail connection components: add inspections to form AC-763; revise a section for requirements and withdrawal cylinder alignments when burping the 308 feed cylinder; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Approval Date 7/27/2024 8/15/2024 7/30/2024 ISA Summary Change Documents Modified Update to SSC?

Due to Change Required?

No ACP4-OP-066 Chg. 21 No Yes ESO-3100-0150 Rev. 0 No No ACP4-OP-178 Chg. 27 No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 56 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

7/27/2024 No ACP3-ST-002 Chg. 16 No None of the criteria PCE 24-0132 0

Revision to Procedure ACP3-ST-002, HALEU Cold Box IROFS listed in 10 CFR Surveillance Testing and Calibration 70.72(c) are met.

Description of Change:

Revised ACP3-ST-002 to update prerequisite; clarify steps to coordinate with procedure ACP3-OP-002; add "If required" to Tools step for a Measuring and Test Equipment torque screwdriver as not all surveillances require it; clarify step for maintaining or cycling power to refrigeration system; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

8/7/2024 No ACP2-CM-002 Chg. 8 No None of the criteria PCE 24-0136 0

Revision to Procedure ACP2-CM-002, Removal, Handling and Storage of listed in 10 CFR Uranium Contaminated Process Equipment 70.72(c) are met.

Description of Change:

Revised ACP2-CM-002 to add a step to clarify if removing piping or tubing, compare label/marking on item to be removed with work package number, if numbers do not match, stop, and notify supervisor; add a step to clarify if removing an item other than piping or tubing that will fit into an Safe Volume Container (SVC), verify the item to be removed as identified in the work package, will fit into an SVC and document on form AC-729; correct a step to clarify verification of the pump to be removed as identified in the work package and document on form AC-729. If the numbers do not match, stop, and notify the supervisor; and revise form AC-729 to add SVC number line.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

8/15/2024 No ACP3-ST-004 Chg. 9 No None of the criteria PCE 24-0140 0

Revision to Procedure ACP3-ST-004, HALEU Cold Box IROFS listed in 10 CFR Surveillance Testing and Calibration 70.72(c) are met.

Description of Change:

Revised ACP3-ST-004 to clarify the rules for short cycling during testing and calibration.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 57 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

8/19/2024 No ACP2-OP-037 Chg. 5 No None of the criteria PCE 24-0141 0

Revision to Procedure ACP2-OP-037, Requirements For Use of The listed in 10 CFR Calibration Cart 70.72(c) are met.

Description of Change:

Revised ACP2-OP-037 to change purge gas tank to nitrogen cylinder; and add a step to be consistent with a source reference.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

8/19/2024 No ACP3-OP-002 Chg. 16 No None of the criteria PCE 24-0142 0

Revision to Procedure ACP3-OP-002, Pump Down Cart Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP3-OP-002 to incorporate SPC-3100-0001, Calibration Cart and Pump Down Cart N2 Cylinder Pressure, requirements; remove references to partially filled cylinder checks; delete or change steps which apply to partially filled cylinders; add a new step to remove the "if' statement since this section now only applies to new/cleaned/washed cylinders; update a source reference; and revise form AC-751 to include documentation of pressure device used and device identification/serial number.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

8/19/2024 No ACP2-OP-039 Chg. 1 No None of the criteria PCE 24-0143 0

Revised Procedure ACP2-OP-039, Operations Inventory listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-OP-039 to add a step for determining start and stop times for work-in-progress containers; add a step for determining service carts requiring Non-Destructive Analysis (NOA) and coordinating their possible use during NDA surveys; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 58 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments NIA

Title:

8/22/2024 No Form AC-325 Rev. 53 No None of the criteria PCE 24-0146 0

Revision to Form AC-325, Auxiliary Check Sheet listed in 10 CFR Description of Change:

70.72(c) are met.

Revised form AC-325 to add visual inspection of the in-service heat lamps.

Reason for the Change:

Clarify form requirements.

NIA

Title:

8/28/2024 No ACP4-OP-067 Chg. 0 No None of the criteria PCE 24-0148 0

New Procedure ACP4-OP-067, Pressure Checks of Partially Filled UF6 listed in 10 CFR Cylinders 70.72(c) are met.

Description of Change:

ACP4-OP-067 was developed for HALEU operations to allow 5-series cylinders that were only partially filled with product before being removed from the withdrawal system to be filled further.

Reason for the Change:

Implement procedure requirements.

NIA

Title:

9/5/2024 No ACP4-NM-212 Chg. 1 No None of the criteria PCE 24-0153 0

Revision to Procedure ACP4-NM-212, Monitoring the Performance of listed in 10 CFR Analytical/NOA Measurement Systems 70.72(c) are met.

Description of Change:

Revised ACP4-NM-212 to align with the correct roles provided by the Statistician and the Measurement Control Coordinator, moving sections for clarity, removing redundancy, and updating the verbiage for a better understanding; remove unnecessary Quality Records; update acronyms; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2014 Page 59 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

9/6/2024 No ACP4-OP-074 Chg. 10 No None of the criteria PCE 24-0154 0

Revision to Procedures ACP4-OP-074, Cold Box Withdrawal Mode ACP4-OP-032 Chg. 21 listed in 10 CFR Operations; and ACP4-OP-032, Product Cold Box Operation 70.72(c) are met.

Description of Change:

Revised ACP4-OP-074 to add steps to evacuate and burp pigtails, withdrawal manifold, and cylinder prior to bringing online to the cascade; and add requirements for partial 5B and 12B cylinders.

Revised ACP4-OP-032 to add a section for leak checking various cold box valves; add a step to ensure cylinder pressure is written on form AC-746; remove steps 7 which sequenced performing an additional pressure check on installed equipment; and clarify a step to update the cylinder identification number during installation.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

9/17/2024 No ACP4-OP-074 Chg. 10 No None of the criteria PCE 24-0154 Revision to Procedures ACP4-OP-074, Cold Box Withdrawal Mode ACP4-OP-032 Chg. 21 listed in 10 CFR Operations and ACP4-OP-032, Product Cold Box Operation 70.72(c) are met.

Description of Change:

Revised the change evaluation form AC-001 to provide answers for Questions 2C and 2D that were inadvertently left blank.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

N/A

Title:

9/24/2024 No ACP2-NM-104 Chg. 5 No None of the criteria PCE 24-0155 0

Revision to Procedure ACP2-NM-104, Nuclear Material Measurement listed in 10 CFR Controls 70.72(c) are met.

Description of Change:

Revised ACP2-NM-104 to add a section for returning Mass Spectrometer to service; clarify a section; update Quality Records, definition, and acronyms; clarify the HALEU Demonstration inventory period in Appendix B; and made minor formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 60 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments NIA

Title:

912012024 No ACP3-ST-001 Chg. 7 No None of the criteria PCE 24-0156 0

Revision to Procedure ACP3-ST-001, HALEU Nitrogen System IROFS listed in 10 CFR Surveillance Testing and Calibration 70.72(c) are met.

Description of Change:

Revised ACP3-ST-001 to remove Items Relied on For Safety (IROFS) 7.3.6.11.2.2 surveillance testing requirements for a valve; clarify where IROFS valve indications were to be verified; change valve numbers; remove references to nitrogen compressed gas cylinders; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

9/2012024 No ACP4-OP-066 Chg. 25 No None of the criteria PCE 24-0157 0

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-066 to add the definition for a Valid Sample Set; and reorder and clarify a step and form AC-756 to align with changes.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

9/2512024 No SPC-3101-0012 Rev. 0 No None of the criteria PCE 24-0159 0

New Setpoint/Tolerance Calculation SPC-3101-0012, HALEU Cascade listed in 10 CFR Pressure Transmitters 70.72(c) are met.

Description of Change:

SPC-3101 -0012 was developed to establish revised As-Left and As-Found tolerances applicable to calibration of certain HALEU cascade pressure transmitters.

Reason for the Change:

Initiate Setpoint Tolerance Calculation.

NIA

Title:

9/2712024 No ACP3-OP-002 Chg. 17 No None of the criteria PCE 24-0161 0

Revision to Procedure ACP3-OP-002, Pump Down Cart Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP3-OP-002 to clarify a step for obtaining the cylinder identification; and update to a new Pressure Indicator and new Pressure Transmitter throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 61 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

10/3/2024 Yes ESO-3100-0070 Rev. 0 No None of the criteria PCE 24-0162 0

New Engineering Service Order ESO-3100-0070, Removal of Centrus listed in 10 CFR Supplied Power to Non-ACP Facilities 70.72(c) are met.

Description of Change:

ESO-3100-0070 was developed to facilitate documentation changes related to the removal of 13.8 kV power feeders to the following DOE-Environmental Management (EM) facilities: X-1020, X-1007, X-112, X-3000, X-1000, XT-847, and X-1007 Hot Water Boiler.

Reason for the Change:

This project is being driven by DOE-Environmental Management to align power feeds to most facilities with the appropriate custodial organization.

The facilities which are being removed from these X-6000 power feeds are no longer part of the ACP area of responsibility.

NIA

Title:

9/30/2024 No ACP2-PT-009 Chg. 7 No None of the criteria PCE 24-0163 0

Revision to Procedure ACP2-PT-009, On-Site Transportation of Inventory listed in 10 CFR and Radioactive Material Shipment and Receipt 70.72(c) are met.

Description of Change:

Revised ACP2-PT-009 to add a caution box to ensure Operations personnel verify that the item has been accepted per Quality Control; revise steps to include the minimum spacing requirements and weighing or storage of UF6 standards; and add a reference.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

10/28/2024 Yes ESO-3501 -0005 Rev.a No None of the criteria PCE 24-0165 0

New Engineering Service Order ESO-3501-0005, Vehicle Barrier System listed in 10 CFR Installation 70.72(c) are met.

Description of Change:

New ESO-3501-0005 addresses the "installation* of a vehicle barrier system at the ACP.

Reason for the Change:

AGO committed to the installation of a vehicle barrier system that will meet the American Society for Testing and Materials F2656 standard or utilizing alternative mitigation measures determined with a technical justification documented in Engineering Evaluation, EE-3501-0001.

NRC Report 2024 Page 62 of 75

FCE Number PCE Number NIA PCE 24-0166 NIA PCE 24-0167 NRC Report 2024 Rev.

Title:

o Revision to Procedure ACP2-NM-105, Control of Nuclear Material Items Description of Change:

Revised ACP2-NM-105 to add verbiage to address the ACO internal 8-character Identification Number for cylinders/containers to ensure consistency; clarify labels being applied to cylinders/containers; update references and acronyms; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

Title:

o Revision to Procedures ACP2-AR-217, Criticality Accident Alarm System (CMS) Alarm Response, and ACP2-ST-217, CMS Testing Description of Change:

Revised ACP2-AR-217 to add anomaly as an alarm level; add Noisy Area Warning Light Activation responses; add Building Evacuation System (BES) monitoring to BES Fault supplementary actions; add Uninterruptible Power Supply (UPS) monitoring to UPS Fault supplementary actions; and made formatting changes throughout.

Revised ACP2-ST-217 to change the order of the tests; add a new step to make the Sensitivity/Operability tests a prerequisite to performing the fault and fault clearance tests when part of the annual surveillance; add a new section to allow both tests to be performed sequentially on one detector if chosen; revise a section and form AC-791 to record elapsed time to detector fault and clarified actions to proceed if a detector fails the test; change fault test passing duration according to manufacturer's recommendations; change steps to allow for detector testing while CMS is operable; add conditional steps at the end of each section to set the CMS Fault Sounder Inhibit to off; add notes to sections for operators or maintenance support technician to operate breakers; change form AC-791 to reverse the order of the White and Yellow detectors in the tables to match the physical order of the detectors in each cluster to make test logging easier; change form AC-793 to add more rows to the tables; add oscilloscope recording settings in Appendix P; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarified procedure requirements.

Approval Date 10/8/2024 10/9/2024 Change to SSC?

No No Documents Modified Due to Change ACP2-NM-105 Chg. 5 ACP2-AR-217 Chg. 7 ACP2-ST-217 Chg. 6 ISA Summary Update Required?

No No Reason NRC Preapproval Not Required/Comments None of the criteria listed in 10 CFR 70.72(c) are met.

None of the criteria listed in 10 CFR 70.72(c) are met.

Page 63 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

10/7/2024 No ACD4-OP-073 Chg. 12 No None of the criteria PCE 24-0168 0

Revision to Procedure ACD4-OP-073, Nitrogen System Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-OP-073 to update sections to remove a valve.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

10/7/2024 No ACD4-ON-073 Chg. 6 No None of the criteria PCE 24-0169 0

Revision to Procedure ACD4-ON-073, Loss of Nitrogen listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-ON-073 to remove a section since a momentary loss of nitrogen is no longer a credible failure mode with the removal of the Nitrogen Items Relied on For Safety Panel; and remove an entry condition due to the removal of momentary loss of nitrogen.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

10/14/2024 No ACP2-OP-038 Chg. 0 No None of the criteria PCE 24-0170 0

New Procedure ACP2-OP-038, On-Site Transport and Receipt of UF6 listed in 10 CFR Cylinder 70.72(c) are met.

Description of Change:

ACP2-OP-038 was developed to fill a need pertaining to the application of hold tags to UF6 cylinders between procedure ACD2-MM-001, Control of Material, and procedure ACP2-PT-009, On-Site Transportation of Inventory and Radioactive Material Shipment and Receipt.

Reason for the Change:

Implement procedure requirements.

NRC Report 2014 Page 64 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments NIA

Title:

11/21/2024 No LA-3605-0001 Section 4.7.5 No None of the criteria PCE 24-0171 0

Revision to LA-3605-0001, License Application for the American and Tables 4.7-2 and 4.7-3 listed in 10 CFR Centrifuge Plant 70.72(c) are met.

Description of Change:

Revised LA-3605-0001 to add a statement for "Representative air samples may be used to assign internal dose"; and clarify Tables 4.7-2 and 4.7-3 to add a quarterly (90-day) urine sample frequency along with new recall and restriction levels. Regulatory Guide 8.25, Air Sampling in the Workplace, and Regulatory Guide 8.34, Monitoring Criteria and Methods to Calculate Occupational Radiation Doses, provide a means for use of air sampling for dose assessment.

Reason for the Change:

Clarify licensing documentation.

NIA

Title:

10/21/2024 No ACP2-NM-111 Chg. 10 No None of the criteria PCE 24-0172 0

Revision to Procedure ACP2-NM-111, Control and Usage of Tamper listed in 10 CFR Indicating Devices 70.72(c) are met.

Description of Change:

Revised ACP2-NM-111 to add steps to ensure the Tamper Indicating Device (TID) Custodian updates the TID Log after application or removal has been completed; clarify completed records; clarify general requirements of TID appliers and TID custodian requirements; add security approved Mass Spectrometer/Sample storage cabinets and instructions of which TID to use when securing the cabinet; add E-Cup or Polylock to steps to clarify which TID to use; add form AC-815 to Appendix C; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

12/11/2024 No ACD2-HP-013 Chg. 2 No None of the criteria PCE 24-0174 0

Revision to Procedure ACD2-HP-013, Radiation Protection Program Self-listed in 10 CFR Assessments 70.72(c) are met.

Description of Change:

Revised ACD2-HP-013 to change the Radiation Protection Self-Assessment Annual Review requirement to be performed by the following year second quarter; update acronyms and use references; and made grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

RC Report 1014 Page 65 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

12/17/2024 No ACD2-SH-002 Chg. 6 No None of the criteria PCE 24-0175 0

Revision to ACD2-SH-002, Reproductive Hazards listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-SH-002 to create a formal process for the removal of work status as a declared pregnant workers following a one-year expiration date rather than solely referencing 29 CFR 1910.1200, 29 CFR 1900.1450, and Regulatory Guide 8.13; add a new form AC-814; update form AC-417 to have clearer directions and update references for workers understanding of their rights; add attachments; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

11/19/2024 No ACP4-OP-178 Chg. 29 No None of the criteria PCE 24-0176 0

Revision to Procedure ACP4-OP-178, Cascade 131 Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-178 to add new personnel safety-related steps to precautions and limitations; and add new step to address securing of evacuation valves following cylinder burping.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

10/24/2024 No ACP4-OP-066 Chg. 26 No None of the criteria PCE 24-0183 0

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-066 to add a step to use dry ice during leak rate if desired; add new standards and H values in Appendix F; moved definitions/acronyms to Appendix G; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 66 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

10/30/2024 No ACP2-PT-009 Chg. 8 No None of the criteria PCE 24-0185 0

Revision to Procedure ACP2-PT-009, On-site Transportation of Inventory listed in 10 CFR and Radioactive Material Shipment and Receipt 70.72(c) are met.

Description of Change:

Revised ACP2-PT-009 to delete a section that is no longer needed; add a note to allow multiple steps to be performed in any order; add Health Physics-Industrial Hygiene to the required approvals where needed; clarify a step to require the receipt area to be within Criticality Accident Alarm System coverage per Non-Fissile Material Operation (NFMO) Engineering Evaluation; add a step to ensure the receipt area remains less than 100 grams 235U as required by NFMO EE-3101 -0036; add 24-inch spacing from all other fissile material; update Items Relied on For Safety stamps; add a note to suggest not leaving the cart unattended while it contains UF6 standards; update references; and made editorial changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

11/6/2024 No ACD2-PT-005 Chg. 11 No None of the criteria PCE 24-0188 0

Revision to Procedure ACD2-PT-005, Transport of Classified Matter listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-PT-005 to remove all references.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

11/5/2024 No ACP3-ON-016 Chg. 1 No None of the criteria PCE 24-0189 0

Revision to Procedure ACP3-ON-016, Response to Off-Normal Cold Box listed in 10 CFR Operation 70.72(c) are met.

Description of Change:

Revise ACP3-ON-016 to add a step to dispose of broken glass from heat lamps into satellite waste containers according to procedure ACD2-EC-007, Waste Management; and a add a note box to record system pressure readings after a cold box trips off to aid engineering with trouble shooting.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2014 Page 67 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

11/19/2024 No ACD2-MP-002 Chg. 14 No None of the criteria PCE 24-0190 0

Revision to Procedure ACD2-MP-002, Stop Work Actions listed in 10 CFR Description of Change:

70.72(c) are met Revised ACD2-MP-002 to update the title of Cascade/ Recycle and Assembly Operations Shift Supervisor; add guidance on documentation required for form AC-090; add note boxes to clarify compensatory actions and corrective actions guidance; revise a step to clarify compensatory and corrective actions to release stop work; revise form AC-090 to separate compensatory actions and corrective actions sections; add definitions; and update references.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

11/20/2024 No ACD2-MP-002 Chg. 14 No None of the criteria PCE 24-0190 Revision to Procedure ACD2-MP-002, Stop Work Actions listed in 10 CFR Description of Change:

70.72(c) are met Revised the change evaluation to provide answers to Questions 2C and 2D that were inadvertently missed during Revision 0.

Revised ACD2-MP-002 to remove the proposed title change for Cascade/

Recycle and Assembly Operations Shift Supervisor that was not performed under Revision O of this change evaluation. This title change requires the performance of an application change.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation and procedure change.

N/A

Title:

11/13/2024 Yes ESO-3100-0160 Rev. 0 No None of the criteria PCE 24-0192 0

New Engineering Service Order ESO-3100-0160. Annunciator Panel 21 listed in 10 CFR Replacement 70.72(c) are met Description of Change:

ESO-3100-0160 was developed to replace Annunciator Panel 21. This ESO will be processed as a Commercial Controls Modification and will specify a replacement annunciator panel, change the required design drawings to reflect the new configuration, and provide a test plan for functional testing after installation.

Reason for the Change:

The original alarm panel is obsolete, and no replacement parts are available to keep it in service.

NRC Report 2024 Page 68 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

11/18/2024 No ACD4-ON-009 Chg. 8 No None of the criteria PCE 24-0193 0

Revision to Procedure ACD4-ON-009, Response to Loss of Power listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-ON-009 to remove CATO requirements that are no longer required by National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace; redefine boundary within a note; replace CAT 1 notes with numerically defined calories of energy rating; correct load listings in Appendices B, J, and K; remove actions and feed listings for the Nitrogen Items Relied on For Safety panel; and change response to flashing Criticality Accident Alarm System Noisy Area Warning Lights to reference procedure ACP2-AR-217.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

11/13/2024 No ACP4-OP-173 Chg. 17 No None of the criteria PCE 24-0196 0

Revision to Procedure ACP4-OP-173, Cascade 131 Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-173 to add a step to ensure a valve is open; update step reference numbers in a note box; and clarify a step.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

11/13/2024 No ACP4-OP-074 Chg. 11 No None of the criteria PCE 24-0197 0

Revision to Procedure ACP4-OP-074, Cold Box Withdrawal Mode listed in 10 CFR Operations 70.72(c) are met.

Description of Change:

Revised ACP4-OP-074 to add, revise, and delete steps and notes to clarify cold box operations; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 69 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

12/11/2024 No ACP2-OP-059 Chg. 4 No None of the criteria PCE 24-0198 0

Revision to Procedure ACP2-OP-059, Operation of the Safe Geometry listed in 10 CFR Vacuum 70.72(c) are met.

Description of Change:

Revised ACP2-OP-059 to incorporate flow down for Accounting of Nuclear Materials. Specifically, add sub-steps to document movement of Safe Geometry Containers attached to the Safe Geometry Vacuum when staging or moving items; add steps to provide instruction on logging Safe Geometry Containers locations; add step to ensure the completion of Nuclear Material Control and Accountability paperwork; and add use references.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

11/26/2024 No ACD3-EO-064 Chg. 8 No None of the criteria PCE 24-0199 0

Revision to Procedure ACD3-EO-064, Valve Positioning Controls listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD3-EO-064 to provide for greater control of plant components; perform a periodic review; remove steps involving the handwriting of "as left" positions on form AC-264 due to the as left position always being that of the required position; add a section to formally implement a process of valving order revision after approval; add a section to detail administrative closeouts and end-of-year consolidations; remove references to the Lead Cascade Facility; reformat form AC-264 to incorporate form AC-266, update signature blocks, and add closeout checkers/positions; delete form AC-266; and revise form AC-267 to add a separate purpose/description block to provide better tracking of frequently performed valving orders and add start/completion date/signature blocks.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/11/2024 No ACD4-AR-106 Chg. 10 No None of the criteria PCE 24-0200 0

Revision to Procedure ACD4-AR-106, Cascade Alarms and Responses listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD4-AR-106 to remove Items Relied on For Safety (IROFS) component activations and responses for an IROFS nitrogen valve which was replaced by a hand valve; update nitrogen valve that has been removed/replaced; update actions for low pressures to include the Backup Nitrogen system; and add a reference.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 70 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments NIA

Title:

12/12/2024 No ACD2-MA-002 Chg. 36 No None of the criteria PCE 24-0201 0

Revision to Procedure ACD2-MA-002, Work Control Process listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-MA-002 to perform a periodic review; clarify Quality Assurance review requirements; add possibility for Operations to perform a Job Hazard Analysis; update lifetime retention requirement for work package forms; remove references to Lead Cascade from references; and made formatting and grammatical changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/4/2024 No ACD2-UT-001 Chg. 9 No None of the criteria PCE 24-0202 0

Revision to Procedure ACD2-UT-001, Backflow Prevention and Cross-listed in 10 CFR Connection Control 70.72(c) are met.

Description of Change:

Revised ACD2-UT-001 to transfer ownership of the surveys required by Rule 3745-95-03 of the Ohio Administrative Code to Facility Custodians and the Operations Manager.

Reason for the Change:

Clarify procedure requirements.

NIA

Title:

12/4/2024 No ACP2-NM-105 Chg. 6 No None of the criteria PCE 24-0203 0

Revision to Procedure ACP2-NM-105, Control of Nuclear Material Items listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-NM-105 to clarify the procedure requirements to include Receiving personnel in the Item Identification Number process when applying and verifying the cylinder/container labels, and clarify the movement within the sub-Material Balance Areas.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2014 Page 71 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

12/18/2024 No ACP4-OP-066 Chg. 27 No None of the criteria PCE 24-0205 0

Revision to Procedure ACP4-OP-066, Mass Spectrometer Operation listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-066 to flow down changes identified in NCSE-FWS-007, Nuclear Criticality Safety Evaluation for Small UF6 Cylinders and Samples (Revision 3); add details stating that batches sample/standard tube batches maintain a minimum of 24 inches from other fissile material; clarify that sample/standard tubes are not subject to the transport cart requirement while they are packaged in their shipping/transport containers; and add a definition.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/12/2024 No ACD2-QM-101 Chg. 24 No None of the criteria PCE 24-0206 0

Revision to Procedure ACD2-QM-101, Inspection Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-QM-101 to clarify the documentation needed for purchased items that need to be inspected; clarify the method for identifying items requiring preinstallation inspection or testing; clarify if a test is satisfactory or unsatisfactory; add a note box in to identify attached metal identification tag or engravement on an item that identifies the associated Inspection Report number; clarify the acceptance process for an item; clarify the identification process for nonconforming items; clarify how acceptable items are reinspected and identified; clarify the method for documenting an item that is rejected and still nonconforming after reinspection; modify form AC-056 to include instructions to aid an inspector; delete Attachment D since the form AC-553 tag was rolled into Attachment A; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/19/2024 No ACD2-QM-101 Chg. 24 No None of the criteria PCE 24-0206 Revision to Procedure ACD2-QM-101, Inspection Program listed in 10 CFR Description of Change:

70.72(c) are met.

Revised the change evaluation form AC-001 to provide an answer to the Question "If this change is a Revision, was the PCE Revision Number obtained from the database?" which was inadvertently left blank. No additional changes were made to procedure ACD2-QM-101.

Reason for the Change:

To correct deficiencies noted with Revision O of the change evaluation.

NRC Report 2024 Page 72 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

12/16/2024 No Form AC-072A No None of the criteria PCE 24-0207 0

Correct Configuration Item Database and Revise Form AC-072A, Cl listed in 10 CFR Database Change Record Approval Sheet 70.72(c) are met.

Description of Change:

Revised form AC-072A and corrected the configuration item database to match current documentation and the physical plant.

Reason for the Change:

Correct management assessment findings.

N/A

Title:

12/12/2024 No ACD2-QM-007 Chg. 11 No None of the criteria PCE 24-0208 0

Revision to Procedure ACD2-QM-007, Identification and Control of Items listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACD2-QM-007 to add a definition, add and clarify steps to aid in the users understanding of quality level items and its impact on operation and maintenance activities; delete an unnecessary note; and add Attachment A, Tag Example, of metal tags to provide a more durable option for use in the field.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/17/2024 No ACP2-AR-217 Chg. 8 No None of the criteria PCE 24-0209 0

Revision to Procedure ACP2-AR-217, CMS Alarm Response listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-AR-217 to add a system reset Key Switch Description to explain how the reset works and under which conditions it is used; add detailed sub-steps for system reset Key Switch operations throughout the procedure to clarify use; add system reset to the Criticality Accident Alarm System (CMS) fault warning section if the cause of the warning cannot be determined; add and clarify supplementary actions steps for CMS Evacuation; add a reference; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 73 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

12/13/2024 No ACP2-CM-001 Chg. 7 No None of the criteria PCE 24-0210 0

Revision to Procedures ACP2-CM-001, Chemical Trap Change, and ACP2-ACP2-CM-005 Chg. 1 listed in 10 CFR CM-005, Chemical Trap Media 70.72(c) are met.

Description of Change:

Revised ACP2-CM-001 to flow down the requirements of NCSE-MNT-004, Nuclear Criticality Safety Evaluation for Trap Media Removal (Revision 2);

and update references.

Revised ACP2-CM-005 to flow down the requirements of NCSE-MNT-004 (Revision 2); update references, commitments, and acronyms; and add an Attachment A.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/18/2024 No ACD4-OP-003 Chg. 16 No None of the criteria PCE 24-0213 0

Revision to Procedure ACD4-OP-003, Machine Cooling Water Normal listed in 10 CFR Operations 70.72(c) are met.

Description of Change:

Revised ACD4-OP-003 to remove a valve reference throughout the procedure where needed; clarify notes and steps; and made formatting changes throughout.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/11/2024 No ACP4-OP-178 Chg. 30 No None of the criteria PCE 24-0214 0

Revision to Procedure ACP4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-178 to add steps and conditional steps to ensure compliance with NCSE-GEN-006, Nuclear Criticality Safety Evaluation for Utilities.

Reason for the Change:

Clarify procedure requirements.

NRC Report 2024 Page 74 of 75

ISA FCE Number Summary Reason NRC PCE Number Rev.

Approval Change Documents Modified Update Preapproval Not Date to SSC?

Due to Change Required?

Required/Comments N/A

Title:

12/16/2024 No ACP2-OP-034 Chg. 5 No None of the criteria PCE 24-0215 0

Revision to Procedures ACP2-OP-034, Generation, Handling, ACP2-PT-009 Chg. 9 listed in 10 CFR Transportation, and Storage of Fissile Containers, and ACP2-PT-009, On-70.72(c) are met.

Site Transportation of Inventory and Off-Site Sample Shipment Description of Change:

Revised ACP2-OP-034 to remove NCSE-FWS-007, Nuclear Criticality Safety Evaluation for Small UF6 Cylinders and Samples, and Items Relied on For Safety 7.3.6.5 that no longer control Safe Volume Containers and Safe Geometry Containers and instead points to NCSE-GEN-003, Nuclear Criticality Evaluation for Portable Container Handling, Storage, and Transportation, for handling controls.

Revised ACP2-PT-009 to implement NCSE-FWS-007 for controls other than 1S/2S cylinders and those requiring the NRC prior approval for the Criticality Accident Alarm System exemption.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/16/2024 No ACP2-CM-005 Chg. 2 No None of the criteria PCE 24-0217 0

Revision to Procedure ACP2-CM-005, Chemical Trap Media Change listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP2-CM-005 to add steps for the installation/re-installation of several components.

Reason for the Change:

Clarify procedure requirements.

N/A

Title:

12/18/2024 No ACP4-OP-173 Chg. 19 No None of the criteria PCE 24-0218 0

Revision to Procedure ACP4-OP-173, Cascade 131 Operations listed in 10 CFR Description of Change:

70.72(c) are met.

Revised ACP4-OP-173 to clarify steps when valve(s) are required to be opened in order to add inventory from the new 30B cylinders for recycle and subsequent throughput operations.

Reason for the Change:

Clarify procedure requirements.

NRC Report 1024 Page 75 of 75