ML25013A306
| ML25013A306 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/23/2025 |
| From: | Brice Bickett NRC Region 1 |
| To: | Reid B ADP CR3 |
| References | |
| Download: ML25013A306 (1) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415 January 23, 2025 Billy Reid Site Vice President ADP CR3, LLC 2760 South Falkenburg Rd Riverview FL, 33578
SUBJECT:
CRYSTAL RIVER UNIT 3 - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN
Dear Billy Reid:
The enclosed inspection plan lists the security inspections scheduled through December 31, 2026. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5312 with any questions you may have regarding the inspection plan.
Sincerely, Brice Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 07201035 License No. DPR-72
Enclosure:
Crystal River Unit 3 - Independent Spent Fuel Storage Installation Security Inspection Plan BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2025.01.23 14:16:21 -05'00'
ML25013A306 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS NAME BBickett JEdwards DATE 1/23/25 1/14/25
Site Inspection Activity Plan 07201035 - Crystal River (ISFSI) 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count CR - ISFSI Security Inspection 2
3/3/2025 3/7/2025 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 1/6/2025 9:49:40 AM 6 of 6