ML24018A040
| ML24018A040 | |
| Person / Time | |
|---|---|
| Issue date: | 01/17/2024 |
| From: | Ronald Cureton NRC/NRR/DRO/IRAB |
| To: | |
| References | |
| Download: ML24018A040 (1) | |
Text
PI Plant Subject ADAMS ML Effective Date 12-04 OR01 Generic HRA Related Occurrences ML16285A130 05/13/2013 13-01 IE01 Turkey Point 3 Exemption Request from Green-White Threshold ML16285A175 06/26/2013 13-02 IE03 Generic Power Change ML16285A318 10/23/2013 13-03 IE03 Generic Animal Intrusion/Power Change ML16285A319 11/20/2013 13-04 EP03 Point Beach ANS ML16285A320 04/02/2014 13-05 IE03 Generic Downpower ML16285A321 04/02/2014 13-06 MS07 Generic HPCI Failure ML16285A322 1/15/2014 13-07 EP01 Generic DEP Scoring Opportunity ML16285A323 4/1/2014 14-01 MS06, 07, 08, 09, 10 Generic MSPI PRA Technical Adequacy ML16285A324 3/31/2016*
14-02 MS06, 07, 08, 09, 10 Specific Fort Calhoun MSPI ML16285A325 10/1/2014 14-03 IE04 ANO-2 ANO-2 USwC ML16285A326 12/11/2014
PI Type Subject ADAMS ML Effective Date 14-04 OR01 Generic Concurrent Failures ML16285A327 9/11/2014 14-05 EP03 Hatch Hatch New Siren System Data ML16285A328 12/11/2014 14-07 EP03 Point Beach Point Beach ANS ML16285A329 12/11/2014 14-08 MS06 Generic Prairie Island Lockout ML16285A330 4/16/15 14-09 IE01 ANO ANO SCRAM April ML16285A331 2/19/2015 14-10 PP01 Indian Point Indian Point Security Upgrade ML16285A332 4/16/2015 15-01 IE04 Generic Perry SCRAM October 20, 2014 ML16285A333 4/16/2015 15-02 IE03 Generic Prairie Island unplanned downpower ML16285A334 10/21/2015 15-03 MS06,07, 08,09,10 Generic Unavailability Monitoring of Low-Risk Trains ML16285A335 11/17/2015 15-04 EP02 Generic Clarification on Granting Participation Credit During a HAB Drill/Exercise ML16285A336 11/17/2015
PI Type Subject ADAMS ML Effective Date 16-01 MS06,07 08,09,10 Generic Cook PRA Error Affecting MSPI ML16285A337 04/13/2016 16-02 MS06,07 08,09,10 Watts Bar 2 Watts Bar 2 Baseline Planned UA and CCF ML17129A042 09/21/2016 16-03 MS05 Generic Tornado Missile Protection (TMP)
Potential Safety System Functional Failure ML17129A050 07/01/2016 16-04 MS05 Generic Browns Ferry Safety System Functional Failure ML17125A070 04/13/2017 17-01 IE03 Grand Gulf 1 2016 Power Change ML17207A096 07/21/2017 17-02 IE03 Palo Verde 3 PVNGS 3 Power Change ML17207A100 07/21/2017 17-03 MS06,07 08,09,10 Generic Baseline Unavailability Critical Hours ML17291A258 09/21/2017 17-04 MS06, 07, 08, 10 Watts Bar 2 Watts Bar Unit 2 MSPI Effectiveness Date ML18045A038 01/31/2018 17-05 MS09 Watts Bar 2 Watts Bar 2 MSPI MS09 Effectiveness Date ML18045A041 01/31/2018 (Partially Withdrawn) 18-01 IE04 Generic Definition of Initial Transient ML18144A961 05/24/2018
PI Type Subject ADAMS ML Effective Date 18-03 IE04 Columbia Columbia Scram Exemption Request ML18144A977 05/24/2018 18-02 IE01 and IR03 Watts Bar Watts Bar Critical Hours ML18144A967 07/19/2018 18-04 IE04 ANO Unit 1 ANO-1 Scram One-Time Exemption Request ML18232A233 08/20/2018 18-05 IE03 Turkey Point Turkey Point Unit 3 Shutdown ML19024A500 1/17/2019 19-01 EP01 EP EP DEP Whitepaper ML19169A262 5/22/2019 19-02 BI02 Brunswick Brunswick RCS Leakage ML19169A263 7/31/2019 20-01 IE03 Nine Mile Point 1 Nine Mile Point Scram ML20190A148 6/24/2020 20-02 EP02 Generic EP-ERO PI (COVID-19)
ML20107F675 4/15/2020 20-04 EP01 Generic FAQ 20-04: Crediting Automated Notifications in the DEP Performance Indicator ML20335A061 11/18/2020 20-02 EP02 Generic EP-ERO PI (COVID-19),
Updated ML20352A482 12/29/2020
- see FAQ for specific requirements 20-03 MS06 MS07 MS08 MS09 MS10 Generic Restoration of Train Monitoring After PRA Model Changes ML21075A257 2/24/2021 20-05 IE04 River Bend Station RBS Unplanned Scram May 2019 ML21075A267 2/24/2021 20-06 IE01 Grand Gulf Nuclear Station GGNS Turbine Controls Upgrade Scrams One-Time Exemption ML21075A275 2/24/2021 21-01 IE04 Generic -
AP1000 Unplanned Scrams with Complications for AP1000 ML21075A282 2/24/2021 21-02 EP01 Generic Counting DEP Opportunities from an Emergency Following Retraction of the NRC Emergency Notification ML21117A104 04/21/2021 FAQ 21-03 R1 EP03 Generic ANS Guidance Following IPAWS ML21244A427 09/26/2021 22-01 EP03 Generic Replace the ANS PI with an ERFER PI ML22055A562 03/23/2022 22-02 IE04 Diablo Canyon Power Plant Diablo Canyon Unplanned Scram May 2022 ML22278A296 10/20/2022 22-03 IE04 Susquehanna Steam Electric Station Susquehanna Unplanned Scram October 2022 ML22278A766 10/20/2022 23-01 IE01 DC Cook Unit 1 DC Cook Unplanned Scram May 24, 2022 ML23104A432 4/5/2023 23-02 IE04 Peach Bottom Unit 2 Peach Bottom Unit 2 Unplanned Scram with Complications ML23192A121 7/13/2023
- see FAQ for specific requirements 23-03 IE01 Turkey Point Unit 3 Turkey Point Unit 3 Unplanned Scrams per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> ML24012A042 WITHDRAWN 1/17/2024