ML23334A242
| ML23334A242 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/30/2023 |
| From: | Joseph Demarshall NRC/RGN-I/DORS/OB |
| To: | Dominion Energy Nuclear Connecticut |
| References | |
| EPID L-2023-OLL-0010 | |
| Download: ML23334A242 (1) | |
Text
Facility 9/11/2023 Facility 9/14/2023 Exam Date Target Date Date Complete
-240 1/14/2023 1/11/2023
-210 2/13/2023 2/6/2023
-210 2/13/2023 1/11/2023
-210 2/13/2023 N/A
-210 2/13/2023 2/6/2023
-195 2/28/2023 1/11/2023
-150 4/14/2023 4/10/2023
-136 4/28/2023 4/25/2023
-100 6/3/2023 N/A
-75 6/28/2023 6/19/2023
-60 7/13/2023 7/13/2023
-50 7/23/2023 7/18/2023
-50 7/23/2023 7/18/2023 WRITTEN Exam Developed By:
WRITTEN Exam Date:
OPERATING Exam Developed By:
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
- 4. Reference material due for NRC-prepared examinations (F).
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
Millstone 3 Facility 9/20/2023 Task Description OPERATING Exam START Date:
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
Form 2.1-1 Examination Preparation Checklist OPERATING Exam COMPLT Date:
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
Page 1 of 3
Facility 9/11/2023 Facility 9/14/2023 Exam Date Target Date Date Complete
-35 8/7/2023 8/14/2023*
-30 8/12/2023 8/11/2023
-14 8/28/2023 8/28/2023
-7 9/4/2023 8/30/2023
-7 9/4/2023 9/4/2023
-7 9/4/2023 8/28/2023
-7 9/4/2023 9/4/2023
-7 9/4/2023 9/4/2023 9/20/2023 OPERATING Exam COMPLT Date:
Task Description
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I). *Target date adjusted by Chief Examiner.
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
WRITTEN Exam Developed By:
Facility OPERATING Exam Developed By:
WRITTEN Exam Date:
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 2.1-1 Examination Preparation Checklist Millstone 3 OPERATING Exam START Date:
Page 2 of 3
Form 3.4-1 Events and Evolutions Checklist REV. 2 Facility: Millstone Unit 3 Date of Exam: 9/11/2023 Operating Test No.: 2023 NRC A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
POSITION POSITION POSITION POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
O I
U RO 1
SRO-I SRO-U RX 3
1 2
1 1 0 NOR 0
1 1 1 I/C 1,4 3,4,5 2,3,5,7 9
4 4 2 MAJ 5
6,8 6
4 2
2 1 Man Cntl 1
5 2,7 4
1 1 0 TS 0
0 2 2 RO 2
SRO-I SRO-U RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 3,7 4,8 4 4
4 2 MAJ 6,8 6
3 2
2 1 Man Cntl 3,7 4
3 1
1 0 TS 0
0 2 2 RO 3
SRO-I SRO-U RX 1
1 1
1 0 NOR 0
1 1 1 I/C 3,4,5 2,3,5,7 7
4 4 2 MAJ 6,8 6
3 2
2 1 Man Cntl 5
2,7 3
1 1 0 TS 0
0 2 2 RO 4
SRO-I SRO-U RX 1
1 1
1 0 NOR 0
1 1 1 I/C 2,3,6 3,4,5 2,3,5,7 10 4
4 2 MAJ 5
6,8 6
4 2
2 1 Man Cntl 6
5 2,7 4
1 1 0 TS 0
0 2 2 RO SRO-I 1
SRO-U RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 3,7 2,4, 5,7, 8
7 4
4 2 MAJ 6,8 6
3 2
2 1 Man Cntl 3,7 2
1 1 0 TS 3,4 2
0 2 2
Form 3.4-1 Events and Evolutions Checklist REV. 2 Facility: Millstone Unit 3 Date of Exam: 9/11/2023 Operating Test No.: 2023 NRC A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
POSITION POSITION POSITION POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
O I
U RO SRO-I 2
SRO-U RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1,2,3,4, 6
3,7 4,8 9
4 4 2 MAJ 5
6,8 6
4 2
2 1 Man Cntl 3,7 4
3 1
1 0 TS 1,4 2
0 2 2 RO SRO-I SRO-U 1,3 RX 0
1 1 0 NOR 1
1 1
1 1 I/C 3,4,5,7 4
4 4 2 MAJ 6,8 2
2 2 1 Man Cntl 0
1 1 0 TS 2,3 2
0 2 2 RO SRO-I SRO-U 2
RX 0
1 1 0 NOR 1
1 2
1 1 1 I/C 3,4,5,7 4,8 6
4 4 2 MAJ 6,8 6
3 2
2 1 Man Cntl 4
1 1
1 0 TS 2,3 2
0 2 2 RO SRO-I SRO-U 4,5 RX 0
1 1 0 NOR 1
1 1
1 1 I/C 2,4,5, 7,8 5
4 4 2 MAJ 6
1 2
2 1 Man Cntl 0
1 1 0 TS 3,4 2
0 2 2 RO SRO-I SRO-U RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 Man Cntl 1
1 0 TS 0
2 2