Performance Measure Trip the Reactor Outside the Control Room JPM Number:

IP-1-01-0A Revision Number:

12 Date:

7/15/2022 Developed By:

Benjamin Reyes

/ Benjamin Reyes /s/

07/15/2022 Instructor: Print / Sign Date Reviewed By:

Barry Mingus

/

Barry Mingus /s/

07/28/2022 SME or Instructor: Print / Sign Date Reviewed By:

Austin Wilde

/ Austin Wilde /s/

09/27/2022 Operations Representative: Print / Sign Date Approved By:

Brian Lewin

/ Brian Lewin /s/

09/27/2022 Training Department: Print / Sign Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.

BM

2. Knowledge and Abilities (K/A) references are included.

BM

3. Performance location specified. (in-plant, control room, simulator, or other)

BM

4. Initial setup conditions are identified.

BM

5. Initiating cue (and terminating cue if required) are properly identified.

BM

6. Task standards identified and verified by instructor or SME review.

BM

7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

BM

8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.

BM

9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: 1BFR-S.1 Revision:

303 Procedure: 2BFR-S.1 Revision:

303 Procedure:

Revision:

Procedure:

Revision:

10. Verify cues both verbal and visual are free of conflict.

BM

11. Verify performance time is accurate.

BM

12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

N/A

13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

BM

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

Revision Record (Summary)

Revision #

Summary 12 Applied new template TQ-AA-150-J020 Rev 1 Verified/updated KAs and procedure revisions; changed KA due deleted KA for NUREG-1122 Rev 12 changes Modified task conditions to align with procedure changes.

Added Task Standard.

11 Applied new template TQ-AA-150-J020 Updated referenced procedures to current revision.

10 Added steps to JPM to require local operation of MCC breakers.

9 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Separated step 3 into two critical steps.

9/16/10 Changed procedure revision reference

JPM SETUP INSTRUCTIONS

1. This is an In-Plant JPM written to be performed on either unit.
2. ENSURE a current revision of _BFR-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS UNIT _, is available for performance of this JPM.
3. Ensure a printed color photo of the 480 Rackable Breaker is available.
4. This completes the setup for this JPM.

INITIAL CONDITIONS You are an extra NSO.

  • The unit has experienced an ATWS situation, and _BFR-S.1 has been entered.
  • All attempts to trip the reactor from the control room have been unsuccessful.

INITIATING CUE The Unit Supervisor directs you to locally trip the reactor per _BFR-S.1 step 6.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps. 3 & 6 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the candidate had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

JPM Start Time:

JPM Sequence #:

of Task Standard:

Manually trip the reactor from outside the Main Control Room per _BFR-S.1 Step 6 RNO. Complete all of the steps of the RNO with the final result of manually opening the MG set breakers.

STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Ensure the examinee does NOT actually reposition anything associated with this JPM.

SIMULATE ONLY! A photo of the 480v rackable breaker is to be used to allow the candidate to describe how they would operate the breakers.

NOTE: This step may be performed at any time.

1 Refer to _BFR-S.1, step 6.

  • LOCATE and OPEN _BFR-S.1 CUE:

Provide a copy of _BFR-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS UNIT _.

NOTE: The examinee may request to contact the Control Room with a First Check to ensure they are at the correct location. If that is done provide the following CUE: First check with Control Room acknowledged.

2 Locally open Reactor Trip Breakers AT _RD05E o DEPRESS Both Reactor trip switchgear manual TRIP buttons AND

Show examinee color photo and ask what indications are they using to identify breaker status.

CUE:

(If asked), Reactor Trip Bypass Breakers are open and racked out.

CUE:

You have heard no noise from your breaker operation.

CUE:

You have heard no page announcements concerning a reactor trip.

CUE:

(If asked about RT breaker position [open/closed] when the cubicle door is simulated open), report that the breaker position indicates closed.

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 3 Locally shutdown _A MG set with hand switches AT _RD03E
  • PLACE _A Generator side control switch in PULL OUT AND
  • PLACE _A Motor side control switch in PULL OUT CUE:

_A Generator output current has lowered to 0 amps and noise from the running machine is diminishing CUE:

(If examinee looks at the _B MG set): _B MG set amps have risen.

4 Attempt to Locally shutdown

_B MG set with hand switches AT _RD03E

  • PLACE _B Generator side control switch in PULL OUT AND
  • PLACE _B Motor side control switch in PULL OUT CUE:

_B Generator output current indicates slightly elevated amps.

The _B MG set Generator and Motor Breaker RED lights are NOT LIT.

The _B MG set Generator and Motor Breaker Green lights are LIT.

CUE:

Provide picture of breaker when applicant to attempt manual breaker trip.

5 Attempt to Locally shutdown

_B MG set with manual breaker trip o Depress _A MG Set Generator side switchgear manual TRIP PB. (This breaker is already tripped, but action might be done for procedure adherence.)

CUE:

Breakers have not opened and _B MG set is still running.

NOTE: Alternate path initiated in the following step.

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 6 Open _B MG set motor side switchgear breaker
  • Trip the Unit specific breaker:
  • For Unit 1:

o Bus 133Y, Cub 3C (401 K3 TB1). [This breaker is already tripped, but action might be done for procedure adherence.]

  • For Unit 2:

o Bus 233Y, Cub 3C (401 K32 TB2). [This breaker is already tripped, but action might be done for procedure adherence.]

  • For Unit 2, Depress Bus 234Y, Cub 2A manual TRIP PB at TB2 426 K32.

CUE:

The _B MG set motor side switchgear breaker RED Lamp is LIT The _B MG set motor side switchgear breaker Green Lamp is NOT LIT CUE:

You hear the following Plant Page announcement: Unit 1 Reactor Trip.

CUE:

You receive the following call from the NSO: Unit 1 reactor is tripped.

CUE:

This JPM is complete.

JPM Stop Time:

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Trip the Reactor Outside the Control Room JPM Number: IP-1-01-0A Revision Number: 12 Task Number and

Title:

4D.FR-01 RESPOND to an Anticipated Transient Without Trip Task Standard: Manually trip the reactor from outside the Main Control Room per _BFR-S.1 Step 6 RNO. Complete all of the steps of the RNO with the final result of manually opening the MG set breakers.

K/A Number and Importance: 012 A4.06, importance 4.2 Suggested Testing Environment: In-Plant Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: 1BFR-S.1 Revision:

303 Procedure: 2BFR-S.1 Revision:

303 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

12 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

INITIAL CONDITIONS You are an extra NSO.

  • The unit has experienced an ATWS situation, and _BFR-S.1 has been entered.
  • All attempts to trip the reactor from the control room have been unsuccessful.

INITIATING CUE The Unit Supervisor directs you to locally trip the reactor per _BFR-S.1 step 6.

Performance Measure Local Operation of PZR PORV Block Valve JPM Number:

IP-3-01-1 Revision Number:

0 Date:

7/29/2022 Developed By:

Benjamin Reyes

/ Benjamin Reyes /s/

07/29/2022 Instructor: Print / Sign Date Reviewed By:

Barry Mingus

/

Barry Mingus /s/

08/02/2022 SME or Instructor: Print / Sign Date Reviewed By:

Austin Wilde

/ Austin Wilde /s/

09/13/2022 Operations Representative: Print / Sign Date Approved By:

Brian Lewin

/ Brian Lewin /s/

09/13/2022 Training Department: Print / Sign Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by instructor or SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: 1BOA PRI-5 Revision:

111 Procedure:

Revision:

Procedure:

Revision:

Procedure:

Revision:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate.
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

Revision Record (Summary)

Revision #

Summary 0

Revised IP-3-01-0A Local Operation of PZR PORV Block Valve (1RY8000B Failure) to remove Alternate path Applied new template TQ-AA-150-J020 Rev 1 Verified KA and procedure revisions Revised task standard Task Standard.

JPM SETUP INSTRUCTIONS

1. This is an In-Plant JPM written to be performed on Unit 1
2. ENSURE a current revision of 1BOA PRI-5, CONTROL ROOM INACCESSIBILITY UNIT 1, step 15, is available for performance of this JPM.
3. This completes the setup for this JPM.

INITIAL CONDITIONS You are the Auxiliary Building EO.

  • The Main Control Room has been declared uninhabitable due to smoke.
  • 1BOA PRI-5 has been entered and the Remote Shutdown Panel has been activated.
  • PZR pressure is 2200 psig and lowering.
  • The crew suspects one or both PZR PORVs are leaking by or open.

INITIATING CUE The Unit 1 Unit Supervisor directs you to locally close the U-1 PZR PORV Block valves per 1BOA PRI-5, step 15.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps. 2, 3, 4, & 5 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the candidate had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

JPM Start Time:

JPM Sequence #:

of Task Standard:

Establish local control of 1RT8000A and 1RY8000B per 1BOA PRI-5. Locally close 1RY8000A and 1RY8000B.

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:

Provide the applicant with a copy of 1BOA PRI-5, step 15.

NOTE: Pressurizer PORV Block Valves may attempted to be closed in any order beginning at step 2 for 1RY8000A and step 4 for 1RY8000B.

NOTE: MCC locations as follows: MCC131X2B located at Aux Bldg 414 Q11, MCC132X2 located at Aux Bldg 426 S11.

1 Refer 1BOA PRI-5, step 15 o LOCATE and OPEN 1BOA PRI-5 o Utilize plant knowledge, operator aid, or plant procedures for MCC location

  • 2 Establish Local Control of 1RY8000A At MCC 131X2B, cub A5:
  • Place LOCAL/REMOTE switch to LOCAL.

CUE:

The Local/Remote switch for 1RY8000A is to the LEFT (LOCAL).

NOTE: In the following step, read the Closing cues in sequence.

  • 3 Locally Close 1RY8000A to isolate 1RY455A At MCC 131X2B, cub A5:
  • CLOSE 1RY8000A by placing control switch to CLOSE CUE:

Both lights are lit for 1RY8000A.

CUE:

Only the RED light is lit for 1RY8000A.

  • 4 Establish Local Control of 1RY8000B At MCC 132X2, cub C4:
  • Place LOCAL/REMOTE switch to LOCAL.

CUE:

The Local/Remote switch for 1RY8000B is to the LEFT (LOCAL).

STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: In the following step, read the Closing cues in sequence.

  • 5.

Locally Close 1RY8000B to isolate 1RY456 At MCC 132X2, cub C4:

  • CLOSE 1RY8000B by placing control switch to CLOSE CUE:

Both lights are lit for 1RY8000B.

CUE:

Only the RED light is lit for 1RY8000B.

CUE:

(After second block valve is closed) NSO reports that PZR backup heaters are ON and RCS pressure is now slowly rising.

CUE:

This JPM is complete.

JPM Stop Time:

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local Operation of PZR PORV Block Valve JPM Number: IP-3-01-1 Revision Number: 0 Task Number and

Title:

4D.OA-27 RESPOND to Control Room Evacuation Task Standard: Establish local control of 1RT8000A and 1RY8000B per 1BOA PRI-5. Locally close 1RY8000A and 1RY8000B.

K/A Number and Importance: 010A2.03, importance 4.3/4.0 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: 1BOA PRI-5 Revision:

111 Procedure:

Revision:

Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

15 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

INITIAL CONDITIONS You are the Auxiliary Building EO.

  • The Main Control Room has been declared uninhabitable due to smoke.
  • 1BOA PRI-5 has been entered and the Remote Shutdown Panel has been activated.
  • PZR pressure is 2200 psig and lowering.
  • The crew suspects one or both PZR PORVs are leaking by or open.

INITIATING CUE The Unit 1 Unit Supervisor directs you to locally close the U-1 PZR PORV Block valves per 1BOA PRI-5, step 15.

Performance Measure Local Abnormal Start of a DG (After a Fire has Occurred) - U1 JPM Number:

IP-6-03-0A Revision Number:

0 Date:

6/13/2022 Developed By:

Barry Mingus

/ Barry Mingus /s/

07/25/2022 Instructor: Print / Sign Date Reviewed By:

Benjamin Reyes

/

Benjamin Reyes /s/

7/27/2022 SME or Instructor: Print / Sign Date Reviewed By:

Austin Wilde

/ Austin Wilde /s/

09/13/2022 Operations Representative: Print / Sign Date Approved By:

Brian Lewin

/ Brian Lewin /s/

09/13/2022 Training Department: Print / Sign Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.

BR

2. Knowledge and Abilities (K/A) references are included.

BR

3. Performance location specified. (in-plant, control room, simulator, or other)

BR

4. Initial setup conditions are identified.

BR

5. Initiating cue (and terminating cue if required) are properly identified.

BR

6. Task standards identified and verified by instructor or SME review.

BR

7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

BR

8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.

BR

9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: 1BOA ELEC-3 Revision:

108 Procedure:

Revision:

Procedure:

Revision:

Procedure:

Revision:

10. Verify cues both verbal and visual are free of conflict.

BR

11. Verify performance time is accurate.

BR

12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

N/A

13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

BR

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

Revision Record (Summary)

Revision #

Summary 0

New Alternate Path JPM derived from LORT JPM N035du

JPM SETUP INSTRUCTIONS

1. This is an In-Plant JPM written to be performed on either Unit 1 DG.
2. ENSURE a current revision of 1BOA ELEC-3 LOSS OF 4KV ESF BUS UNIT 1 is available for performance of this JPM.
3. This completes the setup for this JPM.

NOTE:

Provide one set of conditions and cues as appropriate to the Unit 1 DG selected for the JPM INITIAL CONDITIONS (start 1A DG)

  • You are an Equipment Operator.
  • Unit 1 is in Mode 3.
  • A fault on a 345KV line has caused the SATs to trip.
  • Bus 142 is energized by Diesel Generator 1B.
  • Bus 141 Bus Alive light is NOT LIT.
  • A fire has occurred in the 426 Cable Tray Room that could have impacted wiring for the 1A DG.

INITIATING CUE (start 1A DG)

The SM directs you to perform a local start of Diesel Generator 1A using 1BOA ELEC-3, Attachment B starting with Step 2.

INITIAL CONDITIONS (start 1B DG)

  • You are an Equipment Operator.
  • Unit 1 is in Mode 3.
  • A fault on a 345KV line has caused the SATs to trip.
  • Bus 141 is energized by Diesel Generator 1A.
  • Bus 142 Bus Alive light is NOT LIT.
  • A fire has occurred in the 426 Cable Tray Room that could have impacted wiring for the 1B DG.

INITIATING CUE (start 1B DG)

The SM directs you to perform a local start of Diesel Generator 1B using 1BOA ELEC-3, Attachment D starting with Step 2.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps. 4, 5, 6, 7, 9, & 11 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the candidate had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

JPM Start Time:

JPM Sequence #:

of Task Standard:

Locally start the 1A/1B DG per 1BOA ELEC-3 Attachment B/D. When DC Power has been found to be lost to the DG, realign the isolation switches, install a jumper, and reset the Emergency Pushbutton to allow the DG to auto start.

STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: This JPM is written to perform on either Unit 1 DG. Attachment B will start 1A DG and Attachment D will start 1B DG. There is a separate cue sheet for use on the 1A DG and the 1B DG at the end of this JPM.

NOTE: Double hearing protection is required when the DG is running.

NOTE: The DG should be aligned for standby operation. Many of the component positions are aligned correctly. If component is aligned per JPM then CUE As Indicated. If not, then give as noted in JPM.

NOTE: Provide a copy of 1BOA ELEC-3, Attachment B or D to the operator depending which DG the JPM is being performed on.

1 Refer to 1BOA ELEC-3, Attachment _, Local Start of 1_

DG

  • LOCATE and OPEN 1BOA ELEC-3, Attachment _, Step
2.

NOTE: Have examinee explain what keys they will get and how they will get them.

(The examinee will obtain keys from Center Desk.)

2 Obtain keys Get keys for local diesel generator operation

  • U1 PRI-5 keys
  • B-core masters CUE:

Once the examinee has sufficiently demonstrated obtaining keys then CUE, You have obtained the keys you described.

3 Check DG shutdown At 1PL07J or 1PL08J, 1A or 1B EDG Panel o CHECK Running Idle light NOT LIT

  • DEPRESS Emergency Stop pushbutton

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:

The Running Idle Light is NOT LIT.

Emergency Stop pushbutton has been depressed.

NOTE: Alternate path begins HERE There are two sets of DC power lights on DG Control Panel. One set for Field Flash and Generator Control the other set is for circuit DC#1 and DC#2 DC. Ensure the examinee checks the correct lights for DC#1 and DC#2. They are located near the RESET pushbutton.

  • 4 Check DC control power available At 1PL07J or 1PL08J, 1A or 1B EDG Panel o DC POWER ON/BUS #1 LIT
  • DC POWER ON/BUS #2 LIT CUE:

DC POWER ON/BUS #1 is NOT LIT.

DC POWER ON/BUS #2 is NOT LIT.

  • 5 If a fire has occurred, GO TO Step 9
  • Per cue sheet, a fire has occurred. GO TO step 9
  • 6 Align switches on 1PL07/8J At 1PL07J or 1PL08J, 1A or 1B EDG Panel
1) Verify Control Mode Selector in - LOCAL:
2) Place switch 43IS1 in - ISOL
3) Place switch 43IS2 in -

ISOL

4) Place switch 43IS3 in - ISOL CUE:

(for each switch)The component you have indicated is in the position you described

  • 7 Align backup fuses At 1PL07J or 1PL08J, 1A or 1B EDG Panel
  • Place switch 43IS4 in - ISOL CUE:

The component you have indicated is in the position you described

STEP ELEMENT STANDARD SAT UNSAT Comment Number 8

Check DC control power available At 1PL07J or 1PL08J, 1A or 1B EDG Panel

  • DC POWER ON/BUS #1 LIT CUE:

DC POWER ON/BUS #1 is LIT

  • 9 Install jumpers At 1PL07J or 1PL08J, 1A or 1B EDG Panel Install jumpers at 1PL07/8J
  • Terminal 7 to 8
  • Terminal 43 to 44 CUE:

Jumpers have been installed.

10 Reset the DG At 1PL07J or 1PL08J, 1A or 1B EDG Panel

  • Momentarily place Annunciator and System Reset Switch in - RESET CUE:

The component you have indicated is in the position you described

  • 11 Reset emergency stop At 1PL07J or 1PL08J, 1A or 1B EDG Panel
  • Depress Emergency Stop Reset Pushbutton CUE:

The component you have identified is in the position you described.

You can hear the DG cranking.

12 Check Engine speed > 590 RPM At 1PL07J or 1PL08J, 1A or 1B EDG Panel

  • Check engine speed > 590 RPM CUE:

Engine has started and is at 600 RPM.

13 Check DG SX valve At 1PL07J or 1PL08J, 1A or 1B EDG Panel

  • Check 1SX169A/B OPEN

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:

1SX169_ OPEN light is LIT.

14 Check Bus 14_ energized

  • Check Running Loaded light LIT CUE:

The Running Loaded light is LIT.

CUE:

This JPM is complete.

JPM Stop Time:

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local Abnormal Start of a D/G (After Fire has occurred)

JPM Number: IP-6-03-0A Revision Number: 0 Task Number and

Title:

R-OA-34 PERFORM a Local Emergency Start of a Diesel Generator Task Standard: Locally start the 1A/1B DG per 1BOA ELEC-3 Attachment B/D. When DC Power has been found to be lost to the DG, realign the isolation switches, install a jumper, and reset the Emergency Pushbutton to allow the DG to auto start.

K/A Number and Importance: 064 A2.27 3.8 / 3.9 Suggested Testing Environment: In-Plant Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: 1BOA ELEC-3 Revision:

108 Procedure:

Revision:

Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

INITIAL CONDITIONS (start 1A DG)

  • You are an Equipment Operator.
  • Unit-1 is in Mode 3.
  • A fault on a 345KV line has caused the SATs to trip.
  • Bus 142 is energized by Diesel Generator 1B.
  • Bus 141 Bus Alive light is NOT LIT.
  • A fire has occurred in the 426 Cable Tray Room that could have impacted wiring for the 1A DG.

INITIATING CUE (start 1A DG)

The SM directs you to perform a local start of Diesel Generator 1A using 1BOA ELEC-3, Attachment B starting with Step 2.

INITIAL CONDITIONS (start 1B DG)

  • You are an Equipment Operator.
  • Unit-1 is in Mode 3.
  • A fault on a 345KV line has caused the SATs to trip.
  • Bus 141 is energized by Diesel Generator 1A.
  • Bus 142 Bus Alive light is NOT LIT.
  • A fire has occurred in the 426 Cable Tray Room that could have impacted wiring for the 1B DG.

INITIATING CUE (start 1B DG)