From:
Timothy Sippel To:
Faidley, David W; dlashworth@bwxt.com Cc:
Nicholas Peterka; Todd Shewmaker; Matthew Doyle
Subject:
March NCS Inspection Date:
Tuesday, February 14, 2023 11:20:00 AM Attachments:
2023-001 BWXT NCS Document Request.docx Daniel, David,
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a nuclear criticality safety inspection at your facility during the week of March 13, 2023. The inspection will focus on the core inspection procedures described in Inspection Manual Chapter 2600; and will use Inspection Procedure 88015, Nuclear Criticality Safety. The inspectors will be myself and Nicholas Peterka, with Todd Shewmaker accompanying us for training and qualification purposes.
Experience has shown that these inspections are resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to conduct a productive inspection, I have attached a request for documents needed for this inspection. It is important that all of these documents are up to date, complete, and ready for the inspectors upon arrival at the facility.
If possible, an entrance meeting should be schedule for 14:00 on Monday the 13th, with an exit meeting at 16:00 on Thursday the 16th. If there are any questions about this inspection or the material requested, particularly in the you find the request unclear or unduly burdensome, please contact me by email, or at 404-997-4525.
Thank you. - Timothy Sippel.
NUCLEAR CRITICALITY SAFETY INSPECTION DOCUMENT REQUEST SITE: BWXT INSPECTION REPORT NUMBER: 2023-001 PRE-INSPECTION VISIT:
NA INSPECTION DATES:
March 13 - 16, 2023 NRC INSPECTORS:
Lead: Timothy Sippel, Timothy.Sippel@nrc.gov Nicholas Peterka, Nicholas.Peterka@nrc.gov ACCOMPANYING PERSONNEL:
Todd Shewmaker, Todd.Shewmaker@nrc.gov IDENTIFIED LICENSEE CONTACTS:
Manager, Licensing and Safety Analysis: Daniel Ashworth, dlashworth@bwxt.com Manager, Nuclear Criticality Safety:
David Faidley, dwfaidley@bwxt.com ASSOCIATED PROCEDURES:
88015 - Nuclear Criticality Safety Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing during the inspection visit. The current version of these documents is expected unless specified otherwise. The lead inspector can answer questions regarding specific information needs with licensee staff and may request additional documents.
DOCUMENTATION REQUESTED
- 1. Information Requested for On-Site Inspection
- c. Any new or revised NCS procedures since the last NCS inspection (including any revisions to: NCS-01 to -10, NCSE-02, -03, -07, and -11, QWIs 5.1.26, and 4.1.5, and EPR-01-03, and EPR-02-03)
- d. Sample of records indicating operator completion of required NCS training and specific training material on criticality safety
- e. Qualification records for in-training or recently qualified NCS engineers
- f.
List of new and revised NCS PAs, NCS Evaluations, Safety Concern Analyses, Technical Work Records, Justification Analyses, Safety Releases (since the last NCS inspection)
- The inspectors will select a sample of documents for detailed review
- h. Training material and procedures related to NCS support for emergency response, including re-entry, actions to terminate a criticality, and means of assessing/estimating dose from a criticality accident
- i.
NCS inspection reports (a.k.a.: weekly/monthly walkdowns) since the last NCS inspection, schedule for walkdowns
- j.
List of planned CAAS tests and calibrations; NCS related IROFS tests, PMs, or calibrations scheduled for the inspection week; and other NCS related activities occurring during the inspection week
- 2. Activities Requested for On-Site Inspection
- a. Please schedule us to accompany the whatever portions of the quarterly NCS audit that can be performed during the week of the inspection
- b. Please schedule us for a walkdown of the UR organic tank This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.