Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARL-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022 Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 Project stage: Request L-2022-070, 2021 Annual Radiological Environmental Operating Report2022-05-0303 May 2022 2021 Annual Radiological Environmental Operating Report Project stage: Request ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 Project stage: Acceptance Review ML22276A2332022-09-0808 September 2022, 13 September 2022, 15 September 2022, 6 October 2022 Summary of September 13, 2022, Public Meeting with FPL on Turkey Point to Discuss Acceptance Review Issues of Di&C LAR 274 Project stage: Request PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22276A0172022-09-13013 September 2022 Transcript of September 13, 2022 Public Meeting Meeting Between the NRC and Florida Power & Light Company (FPL) to Discuss Acceptance Review Issues of Di&C LAR 274 Project stage: Meeting ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems Project stage: Acceptance Review L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study Project stage: Request ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems Project stage: Acceptance Review L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project stage: Supplement ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 Project stage: Acceptance Review ML22280A1082022-10-13013 October 2022 Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems Project stage: Acceptance Review PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and Project stage: Meeting ML22349A0022022-12-0202 December 2022, 5 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Request ML22322A1812022-12-15015 December 2022 Audit Plan for Turkey Point Digital I&C License Amendment Request (Public Version) Project stage: Other ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Meeting L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results Project stage: Supplement PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis Project stage: Supplement PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting ML23058A4402023-02-22022 February 2023, 2 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Unit Nos. 3 and 4 Project stage: Request ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Meeting ML23108A2812023-03-0606 March 2023, 2 May 2023 April 14 2023 Public Meeting Summary for Turkey Point Digital I&C License Amendment Request Project stage: Request PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary Project stage: Meeting ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 Project stage: Meeting ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 Project stage: Meeting ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Meeting L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. Project stage: Request ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary Project stage: Other ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System Project stage: Other L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project Project stage: Withdrawal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request Project stage: Withdrawal 2023-01-05
[Table View] |
Text
March 3, 2023 LICENSEE:
Florida Power & Light Company FACILITY:
Turkey Point Nuclear Generating, Unit Nos. 3 and 4
SUBJECT:
SUMMARY
OF AUDIT MEETING WITH FLORIDA POWER AND LIGHT CONCERNING A DIGITAL INSTRUMENTATION AND CONTROL UPGRADE LICENSE AMENDMENT REQUEST FOR TURKEY POINT, UNITS NOS. 3 AND 4 (EPID L-2022-LLA-0105)
On February 16, 2023, a partially closed observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company (the licensee, FPL) via video conference. The purpose of the partially closed meeting was to discuss the digital instrumentation and control (I&C) license amendment request (LAR) for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The meeting notice and agenda, dated January 27, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23027A023. The purpose of the meeting was to discuss outstanding audit questions related to the subject review. These questions were originally provided to the licensee in the audit process and are documented in ADAMS (ML22213A117 and ML22322A181). A list of attendees is provided as an enclosure.
During the open portion of the meeting, FPL identified that initial responses for Audit Questions 26, 27, 29, & 30 would be posted to the reading room by February 17, 2023, and another meeting to discuss those responses would be scheduled for February 24, 2023.
Following this discussion, the meeting transitioned to the closed portion. During the closed portion of the meeting, the licensees draft response to the following Audit Questions were discussed:
Audit Question 14 Audit Question 15 Audit Question 16 Audit Question 17 Audit Question 18 Audit Question 19 Audit Question 20 Audit Question 21 Audit Question 22 Audit Question 23 Audit Question 24 Audit Question 25 In addition, updates to previous responses to the following Audit Questions were discussed:
Audit Question 4 Audit Question 7 Audit Question 8 Audit Question 10 No regulatory decisions were made during the meeting. No comments from the public were received during the meeting.
Please direct any inquiries regarding this meeting to Ed Miller at 301-415-2481 or Ed.Miller@nrc.gov.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
List of Attendees cc w/enclosure: Listserv
Enclosure LIST OF ATTENDEES FEBRUARY 17, 2023, MEETING WITH FLORIDA POWER & LIGHT COMPANY TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 LICENSE AMENDMENT REQUEST INVOLVING PROPOSED DIGITAL INSTRUMENTATION AND CONTROL UPGRADE Name Organization Ed Miller U.S. Nuclear Regulatory Commission (NRC)
Michael Marshall NRC BP Jain NRC Rossnyev Alvarado NRC Steve Wyman NRC Justin Vazquez NRC Summer Sun NRC Samir Darbali NRC Mike Waters NRC Rich Stattel NRC Jack Zhao NRC Deanna Zhang NRC Jarrett Mack Florida Power & Light (FPL)
Warren Busch FPL Dr. Ayo FPL Joe Murray FPL Patrick Hahn FPL Clayton Crouch FPL Steve Vanderslice FPL Brian Harnes Framatome Larry Erin Framatome Ted Quinn Framatome Bill Hannaman Framatome Ron Jarrett Framatome Jerry Mauck Framatome Glenn Lang Framatome Kevin Connell Framatome John Hefler Framatome Steve Kane Framatome Phil Opsal Framatome Mike Howard Framatome Phil Gorman Framatome Alan Campbell NEI Warren Odess-Gillette Ray Thomas
Package: ML23048A047 Meeting Notice: ML23048A043 Meeting Summary: ML23048A049 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL2-2/LA NRR/DORL/EICB/BC NRR/DORL/LPL2-2/BC NAME GEMiller RButler MWaters DWrona DATE 3/1/2023 2/24/2023 3/1/2023 3/3/2023