Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARPMNS20201328, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-0909 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation Project stage: Request PMNS20201397, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-16016 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary Project stage: Request ML21011A2232021-01-22022 January 2021 Requests for Withholding Information from Public Disclosure Project stage: Other PMNS20210136, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-02-0404 February 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary Project stage: Meeting PMNS20210305, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 42021-03-29029 March 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Request ML21054A0012021-03-29029 March 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade Project stage: Meeting ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification Project stage: Request ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open Project stage: Request ML21099A1052021-04-23023 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance PMNS20210737, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-05-28028 May 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21159A1652021-06-0404 June 2021 Affidavit for Nextera Tricon Presentation for Turkey Point 5th Presubmittal Meeting Project stage: Meeting ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides Project stage: Meeting ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session Project stage: Meeting ML21176A0102021-06-29029 June 2021 Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L Project stage: Meeting ML21172A2712021-06-29029 June 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance PMNS20210933, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-07-12012 July 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public Project stage: Request ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open Project stage: Request ML21190A1862021-08-0202 August 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21232A0172021-08-20020 August 2021 Licensees Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting ML21279A0962021-08-20020 August 2021, 23 August 2021, 15 October 2021 Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Request ML21235A0932021-08-23023 August 2021 Licensees Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting PMNS20211047, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 42021-08-23023 August 2021 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Meeting ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Meeting ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21214A1192021-11-23023 November 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request Project stage: Other PMNS20220162, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 42022-02-25025 February 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 Project stage: Meeting ML22063A4482022-03-0202 March 2022 Nextera/Fpl Affidavit for Proprietary Presentation for March 7, 2022, Public Meeting Project stage: Meeting ML22082A2222022-03-23023 March 2022 Terrapower Slide Presentation for Met Tower Water Supply Public Meeting Project stage: Request PMNS20220150, Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design2022-03-28028 March 2022 Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design Project stage: Meeting ML22101A2042022-04-0606 April 2022 Nextera/Fpl Affidavit for Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) Project stage: Meeting ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) Project stage: Meeting ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22189A2092022-07-20020 July 2022 March 30, 2022, Summary of Public Meeting with Terrapower, LLC to Discuss the Meteorological Data and Plant Water Source for the Natrium Reactor Project stage: Meeting 2021-06-09
[Table View] |
Text
1 Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 9th Pre-submittal Meeting Telecon April 13, 2022 CLOSED MEETING
2 FRAMATOME INC. PROPRIETARY Pages 8 through 11 from this document (these pages are herein referred to as this document) are the property of Framatome Inc. (Framatome) or its affiliates and are to be considered proprietary and may not be reproduced or copied in whole or in part. This document shall not be furnished to others without the express written consent of Framatome and is not to be used in any way which is or may be detrimental to Framatome. This document and any copies that may have been made must be returned to Framatome upon request.
3 Agenda - Closed Session License Amendment Request (LAR) Content Alternate Review (AR) Process Deviations Pre-Submittal Defense-in-Depth and Diversity Submittal Supplements Scope Schedule Technical Specification Surveillance Reduction Project Schedule Review HFE specific activities with emphasis on PV2 Overall Phase Schedule SER requested issuance Questions and Comments Non-proprietary information suitable for public disclosure
4 Florida Power & Light Contract and Support Introductions - On the Call today
- Steve Catron - Licensing Fleet Director
- Jarrett Mack - Fleet Licensing Lead
- Brian Dunn - Director - Fleet Design
- Phillip Barnes - Design Manager
- Wesley Frewin - Digital Design Supervisor
- Warren Busch - Project Engineer
- Jim Goodrich - Unit Supervisor
- Brian Haynes - Licensing Lead
- Ted Quinn - Licensing Engineer
- Jacek Novakowski - Human Factors Lead
- Bill Hannaman - Licensing Engineer (HFE)
- Sargent & Lundy (3rd Party review)
- John McCague Non-proprietary information suitable for public disclosure
5 Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (1 of 4)
Intro/Justification/Safety Analysis Detailed Description Technical Evaluation Existing Plant System Description (D1)
Existing and New Architecture (D2)
New Safety System Equipment New System Functions (D2.3)
Functional Allocation (D2.4)
New Augmented Quality System Functions System Interfaces (D2.5)
Defense-In-Depth and Diversity (D2.6)
Setpoint Methodology and Calculations (D2.7)
Response Time Performance Non-proprietary information suitable for public disclosure
6 Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (2 of 4)
Technical Evaluation (Cont.)
Summary System Development Process (D.4)
Equipment Qualification (D.3)
Applying a Referenced Topical Report (D.5)
Tricon Plant Specific Action Items (D.5)
Human Factors Engineering (B.1.4)
Tests and Self Diagnostics System Failure Analysis Fundamental Design Principles in the new Architecture Compliance with IEEE Std. 603-1991 and IEEE 7-4.3.2-2003 (D.6)
NRC ISG-04 Compliance Matrix Reliability Secure Development and Operational Environment (D.8)
Non-proprietary information suitable for public disclosure
7 Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (3 of 4)
Technical Evaluation (Cont.)
Summary of Vendor Oversight Plan (C2.2)
Technical Specification Surveillance Reduction (a non ISG-06 item)
Regulatory Evaluation Basis Applicable Regulatory Requirements/Criteria Precedent No Significant Hazards Consideration Analysis Environmental Consideration Analysis Conclusions Non-proprietary information suitable for public disclosure
8 Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (4 of 4)
ATTACHMENTS
- Markup Technical Specification Pages
- Markup Technical Specification Bases (Information Only)
- Tricon Topical 4.3 and SVDU 2.0 Qualification Summary Reports
- RPS/ESFAS/NIS System Requirements Specification (SyRS)
- Technical Specification Surveillance Reduction Report/FMEDA
- Framatome Affidavit in support of Attachments
- Listing of Regulatory Commitments End of Topic Framatome Proprietary Information - Withhold from Public Disclosure Per 10 CFR 2.390
9 Alternate Review Process Deviations Non-proprietary information suitable for public disclosure
10 Human Factors Engineering - LAR Content Non-proprietary information suitable for public disclosure
11 Project Schedule Non-proprietary information suitable for public disclosure
12 Action Items and Follow-up for April 13th Closed Meeting Action Items and Follow-up Non-proprietary information suitable for public disclosure
13 Questions?
Non-proprietary information suitable for public disclosure
14 Acronym List Alternate Review AR Conceptual Design Test PV1 Defense-in-Depth and Diversity D3 Engineered Safety Features Actuation System ESFAS Failure Modes, Effects and Diagnostic Analysis FMEDA Florida Power and Light FPL Human Factor Engineering HFE Institute of Electrical and Electronic Engineers IEEE Integrated System Validation ISV Interim Staff Guidance ISG License Amendment Request LAR Non-proprietary information suitable for public disclosure
15 Nuclear Instrumentation System NIS Nuclear Regulatory Commission NRC Preliminary Design Test PV2 Reactor Protection System RPS Safety Evaluation Report SER System Requirements Specification SyRS Safety Visual Display Unit SVDU Turkey Point PTN Vendor Oversight Program VOP Acronym List (continued)
Non-proprietary information suitable for public disclosure
16 Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations