ML22038A603
"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.
| ML22038A603 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 02/10/2022 |
| From: | Michelle Honcharik NRC/NRR/DSS/STSB |
| To: | Victor Cusumano NRC/NRR/DSS/STSB |
| Honcharik M, NRR/DSS, 301-415-1774 | |
| Shared Package | |
| ML22038A674 | List: |
| References | |
| Download: ML22038A603 (4) | |
Text
V. Cusumano MEMORANDUM TO:
Victor G. Cusumano, Branch Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation FROM:
Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JANUARY 10, 2022, MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE REGARDING DRAFT TRAVELER TSTF-589, ELIMINATE AUTOMATIC DIESEL GENERATOR START DURING SHUTDOWN On January 10, 2022, an Observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Technical Specifications Task Force (TSTF). The meeting was a pre-submittal teleconference to discuss draft traveler TSTF-589 Eliminate Automatic Diesel Generator Start During Shutdown" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21316A236). The meeting notice is available in the ADAMS at Accession No. ML21363A077. A list of attendees is enclosed.
The NRC staff requested clarification on the Note in Surveillance Requirement (SR) 3.8.2.1.
The TSTF agreed to provide additional clarification for the Note in the SR 3.8.2.1 Bases.
The NRC staff noted that some two-unit sites have four emergency diesel generators (EDGs) shared among the two units (four EDGs are required for any operating unit; two EDGs required for the shutdown unit). How are the requirements of SR 3.8.2.1 being met for the shutdown unit (when one of two units is shutdown)?
Enclosure:
As stated CONTACT: Michelle C. Honcharik, NRR/DSS 301-415-1774 February 10, 2022 Signed by Honchari on 02/10/22
V. Cusumano TSTF representative stated that following paragraphs in Section 2.2 Variations in TSTF-589, should cover special cases of two-unit sites:
[The [PLANT] TS contain requirements that differ from the STS on which TSTF-589 was based but are encompassed in the TSTF-589 justification. [Describe differences and why TSTF-589 is still applicable.]
[The [PLANT] TS for [TS 3.8.2, "AC Sources - Shutdown,"]
includes requirements to support an operating unit's shared equipment. These requirements are revised. [Describe the revisions and why the proposed changes are justified.))
The public had no comments.
Project No. 753 cc: See next page
Package: ML22038A674; Meeting summary: ML22038A603; Meeting notice: ML21363A077; Draft TSTF-589: ML21316A236
- concurred via e-mail NRR-106 OFFICE NRR/DSS/STSB NRR/DSS/STSB/BC NRR/DSS/STSB NAME MHoncharik VCusumano MHoncharik DATE 2/9/2022 2/9/2022 2/10/2022
Enclosure LIST OF ATTENDEES NRC Staff:
Honcharik, Michelle Sweat, Tarico Vu, Hand Goel, Vijay Khan, Nadim West, Khadijah Haskell, Russell Kuntz, Robert Miller, Ed Industry and Public:
Mann, Brian Vaughan, Jordan L Sparkman, Wesley A.
Joyce, Ryan M.
Couture, Phil Gullott, David Richards, Drew Lueshen, Kevin
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 Wadsworth, TX 77483 Email: amrichards@stpegs.com Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 Email: kevin.lueshen@constellation.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 Email: wasparkm@southernco.com