ML21088A067
| ML21088A067 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/18/2021 |
| From: | David Silk Operations Branch I |
| To: | FirstEnergy Nuclear Operating Co |
| Shared Package | |
| ML19353E013 | List: |
| References | |
| 000500 | |
| Download: ML21088A067 (1) | |
Text
Beaver Valley 1 Exam: List of Provided References RO Exam:
Q#
Reference 6
Loss of Residual Heat Removal Capability, 1OM-53C.4.1.10.1 Rev. 19 pg. 7, 30-36 23 EOP Attachment 5-A, RCS Cooldown Limits - Tech Specs, 1OM-53A.1.5-A Rev 3 27 Embedded
Reference:
IPC RADAREA screen 36 Steam Tables/ Mollier diagram SRO Exam:
Q#
Reference 76 EPP Wallboard (EALs) 79 Embedded reference: T-ave / T-ref monitor screen 83 Tech Spec 3.4.13 pg. 3.4.13-1 with Leakage values redacted 84 Embedded reference: Chart recorder for Reactor Coolant Letdown radiation monitors EPP Wallboard (EALs) 85 Embedded reference: Photograph of control panel of RCP parameters Starting Reactor Coolant Pump, 1OM-53A.1.2-V Rev. 2 pg. 5 92 Event Notifications, NOP-OP-1015 Rev. 8 Management Notifications, NOBP-OP-1015 Rev. 17 Att. 9 pg. 37-41 98 Radiation Work Permit (RWP), NOP-OP-4107 rev 18 Determination of Radiological Risk, NOP-OP-4010 rev. 8