ML21050A170

From kanterella
Jump to navigation Jump to search
Entergy Confirmatory Order Acknowledgment. J. Ventosa
ML21050A170
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Arkansas Nuclear, River Bend, Waterford, McGuire  Entergy icon.png
Issue date: 02/19/2021
From: Jeremy Groom
Division of Reactor Safety IV
To: Ventosa J
Entergy Nuclear
Scott L
References
EA-17-132, EA-17-153
Download: ML21050A170 (3)


Text

February 23, 2021 Mr. John A. Ventosa Chief Operating Officer South Entergy Nuclear 1340 Echelon Parkway Mailstop Code: M-ECH-66 Jackson, MS 39213

SUBJECT:

NRC CONFIRMATORY ORDER (EA-17-132 AND EA-17-153); NRC ACKNOWLEDGMENT OF NOTIFICATION REQUIRED BY CONDITION L

Dear Mr. Ventosa:

This letter acknowledges Entergy Nuclear Operations, Inc. and Entergy Operations, Inc.

(Entergy) January 28, 2021, notification letter to the U.S. Nuclear Regulatory Commission (NRC) Agencywide Documents Access and Management System (ADAMS) Accession No. ML21028A782. The notification letter is required by Condition L of Confirmatory Order EA-17-132/EA-17-153 (Order), dated March 12, 2018 (ADAMS Accession No. ML18072A191).

We have reviewed your response and found that it provides, in writing to the Region IV Regional Administrator, Entergys basis for concluding that the terms of the Order have been completed.

We currently have no questions but intend to perform Inspection Procedure (IP) 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders, later to confirm Entergys compliance with the terms and conditions of the Order.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room and from the NRCs ADAMS, accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, Michael C. Hay, Deputy Director Division of Reactor Projects Dockets: 50-313, 50-368, 50-416, 50-247, 50-286, 50-255, 50-458 and 50-382 Licenses: DRP-51; NPF-6, NPF-29, DPR-26, DPR-64, DPR-20, NPF-47 and NPF-3 Michael C.

Hay Digitally signed by Michael C. Hay Date: 2021.02.23 13:42:59

-06'00'

J. Ventosa 2

cc:

Mr. John Dinelli, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

N-TSB-58 1448 S.R. 333 Russellville, AR 72802-0967 Mr. Robert Franssen, Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 Mr. Steven Vercelli, Site Vice President River Bend Station Entergy Operations, Inc.

5485 U.S. Highway 61N St.

Francisville, LA 70775 Mr. John Ferrick, Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70057

ML21050A170 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: JRG Yes No Publicly Available Sensitive NRC-002 OFFICE ACES/TL DRPD/BC DRPC/BC DD/DRP NAME JGroom JDixon JKozal MHay SIGNATURE

/RA/

JLDJ JWK MCH DATE 2/8/2021 2/11/2021 2/11/2021 2/23/2021 OFFICE NAME SIGNATURE DATE