Security Inspection Report 05000277/2020420 and 05000278/2020420 Pb Report
ML20281A274
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/09/2020
From: Dante Johnson
Security Performance Evaluation Branch
To: Bryan Hanson
Exelon Generation Co
Johnson D
Shared Package
ML20281A280 List:
References
IR 2020420
Download: ML20281A274 (4)


Text

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION (NRC)

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE (NSIR)

INSPECTION REPORT

Docket Numbers:

05000277 and 05000278

License Numbers:

DPR-44 and DPR-56

Report Number:

05000277/2020420 and 05000278/2020420

Enterprise Identifier: I-2020-420-0013

Licensee:

Exelon Generation

Facility:

Peach Bottom Atomic Power Station, Units 2 and 3

Location:

Delta, Pennsylvania

Inspection Dates:

August 31, 2020, to September 3, 2020

Inspectors:

J. Berry, Team Leader

E. Byre, Senior Physical Security Inspector

P. Coughlin, Senior Physical Security Inspector

J. Rey, Physical Security Inspector

Approved By:

Danté C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations

SUMMARY

The NRC continued monitoring the licensees performance by conducting a security inspection at Peach Bottom Atomic Power Station, Units 2 and 3, in accordance with Inspection Manual Chapter (IMC) 2201, Appendix C, Generic, Special, and Infrequent Inspections. IMC 2201 Appendix C inspections for the security inspection program are designed to support the NRC goals of maintaining safety, enhancing public confidence, improving the effectiveness, efficiency and realism of the regulatory process, reducing unnecessary regulatory burden, and promoting the common defense and security.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with IMC 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

92707 - Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited

(1) NRC inspectors completed this inspection by gathering sufficient information to develop a scenario that can be segmented into limited scope tactical response drills that allows for a limited assessment of the ability of licensees physical security systems and security organization to meet the general performance objective of Title 10 of the Code of Federal Regulations (10 CFR) 73.55(b) and to ensure changes made to the physical protection program in response to a local, State, or Federal emergency (e.g., state of emergency, disaster, or public health emergency) have not adversely impacted the licensees implementation of their protective strategy.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125664.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 10, 2020, the inspectors presented the security inspection results to Mr.

Matt Herr, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2707

Corrective

Action

Documents

Resulting from

Inspection

04367414;

04367444

09/04/2020

2707

Miscellaneous

Peach Bottom Atomic Power

Station Physical Security

Plan

Revision 19

2707

Procedures

SY-AA-150-102

Security Drills and Exercises

Revision 0

2707

Procedures

SY-PB-501

Site Protective Strategy

Revision 7