ML20244B913
Text
h
(
ENCLOSURE 3 DISTRIBUTION ETRTRKi.TII.T
~
4kDRP R/F AM 18 582 / umstson EHORANDUM FOR:
John T. Collins, Regional Administrator, Region IV FR0ft:
R09er J. Mattson, Director Division of Systems Integration
SUBJECT:
IPFLEENTING PROCEDURES FOR NUREG-0737, ITEM II.F.1 This is in response to your amorandum and request for assistance dated April 20,1982 and your remieder of May 24, 1982. Please be assured that, in spite of the fact that we had not yet acknowledged your request, we are preparing a more detailed response to the specific inspection concerns you identified in connechen with the Noble Gas Effluent Monitor and Contain-ment High Range Monitor requirements of NUREG-0737. Phil Stoddart of the Effluent Treatment Systems 'annch has the lead for b tparation of NRR recom-I mended guidelines for the post-implementation inspection effort associated i
with these Action Plan items. In this capacity he is coordinating with the l
Radiological Assessment Branch in this Dtvision, with the' Division of Licen-I sing, and with the Division of Emergency Preparedness, and the Division of Engineering and Quality Assurance in CIE. We have set June 30,1982 as a target date for transmittal of these recomended guidelines.to you and to the othc: Regional Administrators, If a need for a.meetiny with Regional representatives still er.ists following our transmittal, we will be ha'ppy to I
cake the necessary arrangements.
At this time, however, I would like to clarify some matters referred to in your meno. First, although EUREG-0737 specified a January 1,1982 implementa-tion date for these ites, enforceable implementation dates are being worked out by DOL for each licensee separately and are to be identified in confina-tory orders. Second, the post-implementation review has always been understood to be an OIE initiative as part of the inspection process..It has been our understanding, however, that RR assistance would be provided in the develop-ment of the relevant inspection modules, and this is the technical effort we a
have now resumed pursuant to your request. Third, the satter of Technical Specifications associated with these items is a separate and distinct, follow-up, activity with the lead in DOL. We anticipate that this task will be ini-tiated during FY 83.
- risinal Signed 4 hi.s st j
4 l
Roger J. I'.attson, Director
,h. I~ l k
If Division yttet Intecra 101 g ooW X i
cc:
VStello r.egional JHaistrators '
j EGCase
!. II. III, V
- f. APP DEisenhut DVerrelli
/
4 rm. -.s p%4-.e m
IV M
~
l WGarf.111 JCunninghen 051(R$d lD 9...-... J,pl %,4.n DSI V;yg en.cn
.... -..... g.m5m,(.
s.assm >
U 3 /S 2..........EJf 82......
UyJE?........ Njy;{S:
.)