Corrected Ltr Forwarding Insp Rept 50-445/87-12 on 870708-0804.No Violations or Deviations Noted
ML20237G811
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/26/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20237G797 List:
References
NUDOCS 8709020422
Download: ML20237G811 (1)


See also: IR 05000445/1987012

Text

.

. ...

.

.

4

4

4

.

AUG 2 61987

'

In Reply Refer To:

Docket:

50-445/87-12

i

TU Electric

1

ATTN:

Mr. W. G. Counsil

)

Executive Vice President

1

400 North Olive Street,-Lock Box 81

Dallas, Texas

75201

j

4

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. Kelley and

)

W. F. Smith of the Comanche Peak Project Division during the period

July 8 through August 4, 1987, of activities authorized by NRC

]

Construction Permit CPPR-126 for the Comanche Peak Steam Electric

Station, Unit 1, and to the discussion of our findings with you and

other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observation by the

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

In acecrdance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

'

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

i

be pleased to discuss them with you.

)

Sincerely,

ORIGINAL SIGNED BY R. F. WARN 1CI

1

R.

F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosures:

i

Inspection Report 50-445/87-12

i

OSP:CPPD:IP: SRI

P:RI

AD:IP/PF22

'

I4DKelley

Smith

RWarnick

I 8/2'/87

8/u/87

8/.fv87

8709020422 87082F

PDR

ADOCK 05000445

G

PDR

_ _ __-___-_A

- _ _ _

_ _ _

1

'ls ' *

1

-

In Reply Refer.To:

AUG 2 61987

Dockets:

50-445/87-14

{

50-446/87-11

,1

l

TU Electric

ATTN:

Mr. William G. Counsil

}

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

,

Gentlemen:

This refers to the inspection conducted by Mr. H. S. Phillips of

j

the Comanche Pettk Project Division during the period July 8 through

i

August 4, 1987, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric

'

Station, Units 1 and 2, and to the. discussions of our findings with

you and other members of your staff during and at the conclusion of

the inspection.

t

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

1

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the' enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

i

.

.

be pleased to discuss them with you.

j

l

Sincerely,

i

ordGIEL rYTD EY 1 F. 'r % M"

i

R.

F. Warnick, Assistant Director

1

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

50-445/87-14; 50-446/87-11

i

OSP:CPPD:IP: SRI

AD:IP RFW

'

SPhillipa[

RWarnick

8/E6 /87

8/26/87

_ygun?- _ r ,, e

. > >>

1

.t/ ((f/ '

gy/rp q~

f

1

wpq

_ _ _ _ _ _ _ _ _ _ _ _ _ _

-

_ _ - _ - _ _ _ - -

__

c

.

, , . . . . .

.DISTRIBU'?::ON:

. _ , , , , , . . _ . _ , _ _ . ,

":.DocketnFL:Les a( 50-445/446 )ENRCI.PDR

i

Local PDR

i

CPPD Reading (HQ)

'

Site' Reading

  • CPRT. Group
  • SRI-OPS
  • SRI-CONST

!

  • MIS ~ System
  • RSTS Operator

RPB

RIV File

  • DWeiss, RM/ALF

i

JKeppler/JAxelrad

l

CIGrimes

'

PFMcKee

HSchierling

JLyons

LChandler, OGC

CPPD-LA, OSP

1

  • w/766

l

.

1

.

1

!

l

I'

4

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _