j August 25,-1998 l
Mr. Roger O. Anderson, Director Nuclear Energy Engineering Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 l-
SUBJECT:
EVALUATION OF RESPONSE TO NRC GENERIC LETTER 97-05 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (TAC NOS MA0486 AND MA0487) :
Deer Mr. Anderson:
In a letter dated March 13,1998, Northern States Power Company (NSP) submitted a response
' to NRC Generic Letter (GL) 97-05, " Steam Generator Tube inspection Techniques." The focus of GL 97-05 was to verify that licensee steam generator tube inspection practices were
. consistent with existing regulatory requirements and plant licensing bases. The NSP response to GL 97-05 included a description and technical basis for all inspection techniques used to size
' the depth of steam generator tube degradation at Prairie Island, Units 1 and 2. The staff's review of this response did not identify any concerns with the steam generator tube inspection techniques employed at Prairie Island that would indicate the licensee is not in compliance with the current licensing basis for this facility.
l This completes our work for TAC Nos. MA0486 and MA0487.
Sincerely, ORIGINAL SIGNED BY Tae Kim, Senior Project Manager Project Directorate lll-1 Division of Reactor Projects -Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc: See next page DISTRIBUTION:
- s. Docket File. ;
PUBLIC PD#3-1 Reading i
U,gPO\\
EAdensam (EGA1). OGC ACRS PRush EMurphy MKunowski, Rlli i D
' DOCUMENT NAME: G:\\WPDOCS\\ PRAIRIE \\ PIA 0486.LTR
- No changes to memo.
To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy l
l OFFICE PM:PD31 C
PM:PD31 C
LA:PD31 C
(A)C:EMCB*
D:PD31 E.
TKim h -
NAME CFLy db CJamerso JADavis for CACa pe er 8 J f/98 8/11/98 8 / 2 5 /98 DATE g/2pg8
[/ 2[/98
/
OFFICIAL RECORD COPY
-f ab kbh nE 9908290264 990825 PDR ADOCK 050002B2 O
Mr. Roger O. Anderson, Director Prairie Island Nuclear Generating Northem States Power Company Plant cc:
J. E. Silberg, Esquire Site Licensing Shaw, Pittman, Potts and Trowbndge Prairie Island Nuclear Generating 2300 N Street, N. W.
Plant
- Washington DC 20037 Northem States Power Company 1717 Wakonade Drive East Plant Manager Welch, Minnesota 55089 Prairie Island Nuclear Generating Plant Tribal Council Northem States Power Company Prairie Island Indian Community 1717 Wakonade Drive East ATTN: Environmental Department Welch, Minnesota 55089 5636 Sturgeon Lake Road Welch, Minnesota 55089 Adonis A. Nebiett Assistant Attomey General Office of the Attomey General 455 Minnesota Street -
Suite 900 St. Paul, Minnesota 55101-2127 U.S. Nuclear Regulatory Commission Resident inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089-9642 Regional Administrator, Region lil U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Mr. Stephen Bloom, Administrator Goodhue County Courthouse Boy 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145 J
]
<