,e Commonwealth lite.on Company tiraidwml Generating Station Route ol, non 84 l
liraceville,11. NHO7-9619 Tel 81%458 2H01 i
August 3,1998 Unitd States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
Braidwood Station Units I and 2 Revision to Second Interval Inservice Inspection Program Plan Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 l
Reference:
Letter from T. J. Tulon to the NRC, "SeccM Interval inservice Inspection Program Plan," dated April 17,1498.
In the Reference document Commonwealth Edison Company (Comed) submitted the Braidwood Station Units I and 2 Inservice inspection (ISI) Program for the Second Ten Year Interval. Included in this revision were specific Relief Requests from cenain,
ASME Code requirements. Approval for 13 of these Relief Requests was requested by September 1,1998, to suppon the upcoming Unit I steam generator replacement and refueling outage. Tin outtge is scheduled to begin September 5,1998.
On July 21,1998, a teleconference was held between the NRR, contractors from Idaho National Engineering Laboratory (INEL), and Comed concerning these 13 i
Relief Requests. As a result of this and additional telephone conversations, l
Braidwood Station is submitting a revision to the Second Interval inservice Inspection
/
Program Plan.
l The major changes to the program are related to revising a number of the relief
[)
l requests. These changes are listed in Attachment A, which is a page-list summary of
. the changes for Revision 1 to the Second Interval Inservice Inspection Program Plan.
Attachment B contains the Second Interval inservice Inspection Program Plan, Revision 1.
I I
Additionally, as a result of the telephone conversations with the NRC, Braidwood Station is revising its original request for approval of cenain Relief Requests before the upcoming Unit 1 outage. Approval of Relief Requests 12R-05,12R-11,12R-12, 9908120286 990803 r
PDR AD3CK 05000456 PDR A l'nicom Gimpany L_
)
USNRC Document Control Desk 8/3/98 12R-13,12R-14,12R-017,12R-25,12R-26,12R-30, and 12R-31 is requested by September 1,1998. Approval of Relief Requests 12R-07 and 12R-15 is requested by November 10,1998. Finally, request for rehef12R-27 is withdrawn.
Please address any comments or questions regarding this matter to Richard L.
l Schliessmann, at (815) 458-2801 extension 2038.
i i
l Sincerely, j
thy J. Tulon l-
' e Vice President Braidwood Nuclear Station
[-
Attachments cc:
Regional Administrator - NRC, RIII l
NRC Senior Resident Inspector - Braidwood Station l
l i
l l-L-____---_-_-._----------
I l
l e
9 i
Attachment A l
l Summary of Changes for Revision 1 of the Second Interval Inservice Inspection Plan l
l l
l 1
i l
1 i
I I
l l
t l
Summary of Changes for Revision 1 of the Second Interval Inservice Inspection Plan:
- 1) Cover page (i) revised to reflect revision status, i.e. Revision 1.
1
- 2) Revision Summary sheet revised, page (ii). Each page revision status is reflected on this summary sheet.
- 3) Section 6 Containment contains the Inservice Inspection Program Plan a)
Page 6-4, Section 6.1.1.4 was revised to indicate that Relief Request 12R-27 was deleted.
b)
Page 6-6, Table 6.1.4-1 was revised to reflect correction of typographical errors.
I l
- 4) Section 7 contains the ISI Plan Summary. This section contains information on Code Category, item and total number of welds. This section was revised to reflect correction of j
typographical errors and address changes in weld populations due to revised Relief Requests.
l a)
Page 7-5, total number of components by system and number of components selected for examination fields for item number 89.11, was revised to correct the system misclassification of 4 welds.
I Page 7-5, number of components selected for examination field for item number B10.20, inspection population was revised to reflect 12R-15 revisions.
b)
Page 7-7, notes field for item number C2.22, was revised to remove incorrect reference to Note 15.
c)
Page 7-8, number of components selected for examination field for item numbers C3.20 and C3.30, inspection population was revised to reflect 12R-15 revisions, d)
Page 7-13, number of components selected for examination field for item number DI.20, inspection population was revised to reflect 12R-15 revisions.
e)
Page 7-22, number of components selected for examination field for item number i
l B2.40, inspection population was revised to reflect correction of typographical errors.
l l
f)
Page 7-24, number of components selected for examination field for item number
{
B10.20, inspection population was revised to reflect 12R-15 revisions.
i 1
Page1 i
(
g)
Page 7-26, notes field for item number C2.22, was revised to remove incorrect reference to Note 15.
1 h)
Page 7-27, number of components selected for examination field fbr item numbers C3.20 and C3.30, inspection population was revised to reflect 12R-15 revisions.
l l
i)
Page 7-32, number of components selected for examination field for item number l
Dl.20, inspection population was revised to reflect 12R-15 revisions.
l j)
Page 7-35, relief request number field for item number E5.20, revised to reflect correction of a typographical error to the relief request number.
Page 7-35, relief request number field for item number E5.30, was revised to remove incorrect reference to relief request 12R-23.
Page 7-35, total number of components by system for item number E8.10, revised to reflect correction of a typographical error of total population.
l
- 5) Some pages in Section 8 have been revised. Changes to the relief request section are summarized below:
i a)
Page 8-2, ISI program relief request index was revised to revision status of relief requests.
b)
Page 8-3, ISI program relief request index was revised to revision status of relief requests.
c)
Page 8-4, ISI program relief request index was revised to revision status of relief requests.
d)
Page 8-9 to 8-13, Relief Request 12R-02 was revised to reflect those components selected for inspection due to changes from 12R-15.
e)
Page 8-49 to 8-56, Relief Request 12R-10 was revised to reflect those components selected for inspection due to changes from 12R-15.
f)
Page 8-64 to 8-66, Relief Request 12R-14 was revised to reflect correction of typographical errors on the number of pages.
g)
Page 8-67 to 8-69, Relief Request 12R-15 was revised to better clarify Basis for Relief and Proposed Alternate Provisions sections.
Page 2
h)
Page 8-108 to 8-109, Relief Request I2R-27 was deleted.
i)
Page 8-114 to 8-117, Relief Request 12R-30 was revised to remove incorrect reference to 3 valves and add addition information into Basis for Relief section.
j)
Page 8-118 to 8-121, Relief Request 12R-31 wa. revised to better clarify Basis of Relief and Proposed Alternate Provisions sections.
l f
I i
1-l
\\
l
}
Page 3
-____-_1
Attmchment B Braidwood Station Units 1 and 2 Second Interval Inservice Inspection Program Plan l
l l
Revision 1 1
l l
l l
i l
l l
l t
l l
l l
I I
i l
t I