ML20215L367
| ML20215L367 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/23/1986 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20215L369 | List: |
| References | |
| NUDOCS 8610280591 | |
| Download: ML20215L367 (2) | |
See also: IR 05000455/1986035
Text
V
[O'-Wen'vv^~~*In170
' \\
' n 7 u n r .n n , ,
<
i
,
v ,
i ,
,, , i , , v g
.
OCT 2'31986
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the preoperational security inspection conducted by
Mr. B. Drouin of this office on September 22 through October 7,1986, of
activities at Byron Nuclear Power Station, Unit 2, authorized by NRC
Construction Permit No. CPPR-131 and to the discussion of our findings with
Mr. R. Ward and other members of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements regarding Unit 2 preoperati.onal activities
were identified during the course of this inspection. All preoperational
inspection findings were closed with the exception of Vital Area detection
aids. We do not consider this finding to be a restraint to fuel load;
however, we do request that we be notified when the remaining access portal
detection systems become operational as specified in Section 4b of the
enclosed report.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, our report of
this inspection will nt be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
K
't
Sincerely,
'y
go2eoS91 861023
o
ADOCK 05000455
W. L. Axelson/ Chief
I (
Nuclear Materials Safety and
Safeguards Branch
Enclosure:
Inspection Report
Enclosure contains
No. 50-455/86035(DRSS)
SAFECUARDS INFORMATION
(UNCLASSIFIED SAFEGUARDS INFORMATION)
Upon separation this
page is Decontrolled
See Attached Distribution
(
RIII
RIII
RIII
RIII ,
RIII,
bBe
n er
ed
F n
x 1 on
Dr u /na
,c/p/g.
sof;'onicou,m v0
AA-rn.,
mKn
n ,,nL-31
.)-(
,
,
3
, v< u n d
f
,
7
.
J
Commonwealth Edison Company
2
OCT 2'31986
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
IE FILE
IE/DI/ORPB
IE/ES
NMSS/SGPL
NRR/PWR-B/SSPB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE
Steve Lewis, ELD
L. Olshan, NRR LPM
H. S. Taylor, Quality Assurance
Division
Enclosure contains
SAFEGUARDS INFCRiATION
Upon scparation this
pa;2 :s Deccntrolled
l
l