ML20215E025

From kanterella
Jump to navigation Jump to search
Forwards Environ Assessment & Finding of No Significant Impact Re Util 861024 Request for Deferral of Completion of Preoperational Testing of Fuel Handling Sys to Transfer Fuel Bundles Under Wet Loading Conditions
ML20215E025
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/11/1986
From: Siegel B
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
Shared Package
ML20215E028 List:
References
NUDOCS 8612170193
Download: ML20215E025 (3)


Text

,.

December 11, 1986 Docket No. 50-461 DISTRIBUTION 6',

JPartlow NRC PDR ~"'

ACRS (10)

Mr. Frank A. Spangenberg Local PDR Manager-Licensing and Safety PD#4 Reading Clinton Power Station WButler P.O. Box 678 BSiegel Mail Code V920 M0'Brien Clinton, Illinois 61727 RPirfo EJordan

Dear Mr. Spangenberg:

BGrimes

SUBJECT:

ENVIRONMENTAL ASSESSMENT AND FINDING OF N0 SIGNIFICANT IMPACT Re:

Clinton Power Station, Unit No. 1 Pursuant to 10 CFR 51.119, the Commission has requested the Office of the Federal Register to publish the " Environmental Assessment and Finding of No Significant Impact" regarding the proposed exemption from certain requirements of 10 CFR Part 50 for the Illinois Power Company. This finding relates to your request for an exemption, dated October 24, 1986, which would authorize a further deferral for the completion of preoperational testing of that portion of the fuel handling system related to the transfer of fuel bundles under wet loading conditions, relative to that previously authorized (NUREG-0853, Supplement 6 and paragraph 2.D of the Clinton Low Power License, NPF-55), until prior to off-loading of irradiated fuel.

A copy of the above cited report is enclosed for your information.

Sincerely.

Original simmed by Byron L. Siegel, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

Environmental Assessment and Finding of No Significant Impact cc w/ enclosure:

P See next page 3 g1 i

1 P

  • Previously concurred-PD#4/LA PD#4/P OGC,

PD#4/D

  • M0'Brien BSiegel:.

RPirfp WButler 12/01/86

/2/o//86 IJ/4/86 g7/p /86

^

g re

/

o UNITED STATES 8"

Eg NUCLEAR REGULATORY COMMISSION o

{.,

WASHINGTON, D. C. 20555 7,

December 11, 1986 Docket No. 50-461 Mr. Frank A. Spangenberg Manager-Licensing and Safety Clinton Power Station P.O. Box 678 Mail Code V920 Clinton, Illinois 61727

Dear Mr. Spangenberg:

SUBJECT:

ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT Re:

Clinton Power Station, Unit No. 1 Pursuant to 10 CFR 51.119, the Commission has requested the Office of the Federal Register to publish the " Environmental Assessment and Finding of No Significant Impact" regarding the proposed exemption from certain requirements of_10 CFR Part 50 for the Illinois Power Company. This finding relates to your request for an exemption, dated October 24, 1986, which would authorize a further deferral for the completion of preoperational testing of that portion of the fuel handling system related to the transfer of fuel bundles under wet loading conditions, relative to that previously authorized (NUREG-0853, Supplement 6 and paragraph 2.D of the Clinton Low Power License, NPF-55), until prior to off-loading of irradiated fuel.

A copy of the above cited report is enclosed for your information.

Sincerely,

/

N/

B ron L. Si _el, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

Environmental Assessment and Finding of No Significant Impact cc w/ enclosure:

See next page

R-Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit I cc:

Mark Jason Assistant Attorney General Public Utilities Division Office of the Attorney General State of Illinois Center Richard B. Hubbard 100 West Randolph Street - 12th Floor Vice President Chicago, Illinois 60601 Technical Associates 1723 Hamilton Avenue - Suite K Mr. D. P. Hall San Jose, California 95125 Vice President Clinton Power Station Chairman of DeWitt County P. O. Box 678 c/o County Clerk's Office Clinton, Illinois, 61727 DeWitt County Courthouse Clinton, Illinois 61727 Mr. John Greene Manager-Nuclear Station Engineering Dpt.

Director, Criteria & Standards (ANR-460)

Clinton Power Station Office of Radiation Programs P. O. Box 678 U. S. Environrrental Protection Agency Clinton, Illinois 61727 Washington, D; 20460 Sheldon Zabel, Esquire EIS Review Coordinator Schiff, Hardin & Waite Enviror. mental Protection Agency 7200 Sears Tower Region V 233 Wacker Drive 230 S. Dearborn Street Chicago, Illinois 60606 Chicago, Illinois 60604 Resident Inspector Director, Eastern Environmental U. S. Nuclear Regulatory Commission Radiation Facility RR 3, Box 229 A U. S. Environmental Protection Agency l

Clinton, Illinois 61727 P. O. Box 3009 Montgomery, Alabama 36193 l

Mr. R. C. Heider l

Project Manager Illinois Department of Nuclear Safety Sargent & Lundy Engineers Division of Engineering i

1035 Outer Park Drive, 5th Floor l

55 East Monroe Street Chicago, Illinois 60603 Springfield, Illinois 62704 1

Mr. L. Larson Project Manager General Electric Company 175 Curtner Avenue, N/C 395 San Jose, California 95125 Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

l

,-.