ML20211C171

From kanterella
Jump to navigation Jump to search
Effluent Monitoring Rept for First Six Months of 1997, for Lynchburg Mfg Facility Site in Lynchburg,Va
ML20211C171
Person / Time
Site: 07001201
Issue date: 06/30/1997
From: Elliot G
FRAMATOME COGEMA FUELS (FORMERLY B&W FUEL CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9709260134
Download: ML20211C171 (3)


Text

_

i [Y

(,W*

g v.

gb

  1. g _

ee.s F R AMATOME COG EM A F U E LS

+

e.

August 18,1997 Director, Radiation Safety & Safeguards Region II United States Nuclear Ragulatory Commission Atlanta Federal Center 61 Forsyth Street SW Suite 23T85 Atlanta, GA 30303

Reference:

SNM-1168, Docket 70-1201 Gentlemen:

In accordance with the provisions of 10CFR70.59, Framatome Cogema Fuels submits the attached efIluent monitoring report for the first six months of the year 1997 for our Lynchburg Manufacturing Facili,y site located in Lynchburg, Virginia.

You may contact me at (804)S32-5202 should you have any questions or require additional informntion.

Sincerely, OfAA

(~

Gayle F. Elliott, Manager Safety & Licensing L.

\\

Enclosures l

cc:

Ms. Elizabeth Q. Ten Eyck, Director Division of Fuel Cycle Safety & Safeguards Oflice of Nuclear Material Safety & Safeguards United States Nuclear Regulatory Commission

{

Washington, D.C. 20555 Mr. Thomas W. Stone, Jr.

Department of Health Bureau ofIndustrial Hygiene 109 Governor Street Richmond, VA 23219

!!!!(!!!!llk!!f!!!!!!!

9709260134 970630 PDft ADOCK 07001201 PDft

..C..

g Framstome Cogema Fuele F R AM ATO M E no. eex i ts4a. Lyneneuro, vA 24 sos is48 YtCHHOLOGtt5 Telephone: 804 832 5000 Fax: 804-832 5167

Semi-Annual Gaseous Effluent Report 1.

Main Stack (PLR/ SERF-1 RCA) a.

Reporting Period.......................: 01/01/97 to 06/30/97 b.

i.ocation of Sample Collection..: CNFP Main Stack c.

Stack Flow Rate........................: 10250 CFM Radioactivity Released Gross Alpha: 1.565 Cl Gross Beta : 7.057 Cl isotoos Quantity (uCl) Concentration (uCJbnl)

%DAC ruU 1.220 1.64E-14 32.8 23su 0.067 9.14E-16 238U 0.283 3.81 E-15 6.35 "Co 7.057 9.51E-14 0.19 11.

SERF-2 Radiologically Controlled Area a.

Reporting Period......................: 0U01/97 io 06/30/97 b.

Location of Sample Collection..: SERF-2 Main Stack c.

Stack Flow Rate........................: 861 Radioactivity Released Gross Alpha: Not Applicable Gross Beta : 0.554 Cl isotone Quantity (uCJ). Ognpntration (uCl/mD

%DAC "Co 0.554 8.80E-14 0.17 Ill. SERF-3 Radiologically Controlled Area a.

Reporting Period......................: 01/01/97 to 06/30/97 b.

Location of Sample Collection..: SERF-3 Main Stack c.

Stack Flow Rate........................: 4474 CFM Radioactivity Released Gross Alpha: Not Applicable Gross Beta : 6.577 Ci Isotope _

Quantity (uCi) Concentration (uCi/ml)

%DAC "Co 6.577 2.09E-13 0.41 0

Pagg 2,of'2 IV. SERF-4 Radiologically Controlled Area a.

Reporting Period......................: 01/01/97 to 06/30/97 b.

Location of Sample Collection..: SERF-4 Main Stack c.

Stack Flow Rate........................: 9800 CFM Radioactivity Released Gross Alpha: Not Applicable Gross Beta : 15.745 Cl 11010p1 Quantity (uCl) Concentration (uCi/ml)

%DAC "Co 15.745 2.18E-13 0.43

_. _ _ _ _ _ _ _ _ _ _