ML20211A268
| ML20211A268 | |
| Person / Time | |
|---|---|
| Issue date: | 08/04/1999 |
| From: | Rathbun D NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA) |
| To: | Inhofe J SENATE, ENVIRONMENT & PUBLIC WORKS |
| References | |
| CCS, NUDOCS 9908240010 | |
| Download: ML20211A268 (4) | |
Text
hlc0n E
t,W%,
t UNITED STATES je g
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20SMH1001
%...../
August 4,1999 The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, D.C. 20510
Dear Mr. Chairman:
in accordance with Section 9 of the Federal Advisory Committee Act, the Nuclear Regulatory Commission (NRC) hereby files the required amended Charter for the Licensing Support Network Advisory Review Panel (LSNARP).
i l
Sincerely,
(
t l
Dennis K. Rathbun, Director Office of Congressional Affairs
Enclosure:
As stated cc: ~
Sen. Bob Graham I
9908240010 990804 i
i PDR ORG NRCCO 3
PDR l
\\
{'C.b.h i
l i
6 UNITED STATES NUCLEAR REGULATORY COMMISS ON CHARTER LICENSING SUPPORT NETWORK ADVISORY REVIEW PANEL 1.
Estabiishment and Official Deslanation The Nuclear Regulatory Commission's (NRC) Rules of Practice in 10 CFR Part 2, Subpart J, establish the basic procedures for the submission and management of
{
records and documents relating to the licensing of a geologic repository for the disposal of high-level radioactive waste (HLW). The procedures include the use of an electronic information management system known as the Licensing Support Network (LSN).
Pursuant to 10 CFR 2.1011(d) there is established an advisory committee designated as the LSN Advisory Review Panel.
2.
Objectives. Scope of Activity. and Duties The LSN Advisory Review Panel shall provide advice to:
a.
The NRC on the fundamentalissues of the type of computer system necessary to access the Licensing Support Network; b.
The Secretary of the Commission on the operation and maintenance of the electronic docket established for the HLW geologic repository licensing proceeding; and c.
The LSN Administrator on solutions to improve the functioning of the LSN.
The LSN Advisory Review Panel shall provide advice on:
a.
The format standards for providing electronic access to the documentary material certified by each participant to be made available in the LSN to the other parties, interested governmental participants, or potential parties; b.
Procedures and standards for the electronic transmission of filings, orders, and decisions during both the pre-licensing application phase and the high-level waste licensing proceeding; and c.
Other duties as specified in 10 CFR Part 2 or as directed by the Secretary or the Chief Administrative Judge, Atomic Safety and Licensing Board Panel (ASLBP).
7.,
4 2
After commencement of the high-level waste repository licensing proceeding, the primary focus of the LSN Advisory Review Panel will be on broad, long-term, technical issues relating to the operation and maintenance of the LSN and continuing assessments as to how and whether LSN is performing its intended function and serving users' needs.
3.
Duration The LSN Advisory Review Panel is expected to be needed on a continuing basis through the conciusion of the NPC proceeding on granting a license to DOE to emplace waste at the repository.
4.
Official to Whom the Committee Reports The Panel reports to the Chief Administrative Judge, ALSBP.
5.
Aaency Responsible for Providina Necessary Support The Nuclear Regulatory Commission will provide the necessary support through the LSN Administrator.
6.
Membershio Membership includes representatives who wish to participate from those organizations who served on the NRC High-Level Waste Licensing Support System Advisory Committee. This includes representatives of the State of Nevada, the Department of
~
Energy, the Nuclear Regulatory Commission, the affected units of local govemment in Nevada, the National Congress of American Indians, the Nevada Nuclear Waste Task Force, and a coalition of industry groups. Selected Federal agencies with substantial experience in electronic information management systems may also be included on the Panel. Cone,istent with the Federal Advisory Committee Act, the Secretary of the Commission may appoint additional representatives, giving particular consideration to potentiel parties to the HLW licensing proceeding and those who later acquire actual party status. The NRC representative will be the LSN Administrator, 7.
Estimated Number and Freauency of Meetinos The LSN Advisory Review Panel is expected to meet approximately two to three times a year and to save travel costs will utilize video conferencing and the computer-based capabilities of the internet system to communicate on a previously established "LSNNET."
I s
)
=
s, 3
j 8.
Estimated Annual Operatina Costs The estimated annual operating costs for the LSN Advisory Review Panel are $6,000 2
and 0.2 person-years.
Filed with the Nuclear Regulatory Commission:
Auaust 4.1999 f
\\
Andrew L. Bates Advisory Commie 3e Management Officer l
1 i
i e
1
n-CONGRESSIONAL CORRESPONDENCE SYSTEM DOCUMENT PREPARATION CHECKLIST This check list is to be submitted with each document (or group of Os/As) sent for processing into the CCS.
BRIEF DESCRIPTION OF DOCUMENT (S) J/<x;. Ohm &Lg/v 1.
2.
TYPE OF DOCUMENT X CORRESPONDENCE HEARINGS (Os/As) 3.
DOCUMENT CONTROL _X SENSITIVE (NRC ONLY)
X NON SENSITIVE 4.
CONGRESSIONAL COMMITTEE AND SUBCOMMITTEE (if applicable)
Congressional Committee Subcommittee
'5.
SUBJECT CODES (A)
(B)
(C) 6.
SOURCE OF DOCUMENTS (A) 5520 (DOCUMENT NAME (B)
SCAN (C)
ATTACHMENTS (D)
OTHER 7.
SYSTEM LOG DATES (A)S//f/99 DATA OCA SENT DOCUMENT TO CCS (B)
DATE CCS RECEIVED DOCUMENT (C)
DATE RETURNED TO OCA FOR ADDITIONAL INFORMATION (D)
DATE RESUBMITTED BY OCA TO CCS (E)
DATE ENTERED INTO CCS BY (F)
DATE OCA NOTIFIED THAT DOCUMENT IS IN CCS COMMENTS:
1 RELEASE TO PDR s sassa-P;\\DISRTLIS.DMS
...