Discusses Evaluation of Wisconsin Electric Power Co Response to NRC GL 97-05, Steam Generator Tube Insp Techniques
ML20202H660
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/01/1999
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Sellman M
WISCONSIN ELECTRIC POWER CO.
References
GL-97-05, GL-97-5, TAC-MA0484, TAC-MA484, NUDOCS 9902080171
Download: ML20202H660 (2)


Text

.

p 4

= February 1, 1999 i

Mr. Michael B. Sellman Chief Nuclear Officer i Wisconsin Electric Power Co.

231 West Michigan Street.

Saukee, WI 53201 SUBJECT.

EVALUATION OF WISCONSIN ELECTRIC POWER COMPANY'S RESPONSE TO NRC GENERIC LETTER 97-05," STEAM GENERATOR TUBE

-lNSPECTION TECHNIQUES" FOR POINT BEACH NUCLEAR PLANT, UNIT 1

- (TAC NO.- MA0484)

Dear Mr. Sellman:

In letters d' ated March 17 and September 18,1998, Wisconsin Electric Power Company (WE) submitted responses to NRC Generic Letter (GL) 97-05, " Steam Generator Tube Inspection Techniques." The focus of GL 97-05 was to verify that licensee steam generator tube inspection practices were consistent with existing regulatory requirements and plant licensing bases. The WE responses to GL 97-05 included a description and technical basis for all inspection techniques used to size the depth of steam generator tube degradation at Point Beach, Unit 1. The' staff's review of these responses did not identify any concerns with the steam generator tube inspection techniques employed at Point Beach Unit 1 that would indicate WE is not in compliance with the current licensing basis for this facility.

This completes our review of GL 97-05 for Point Beach, Unit 1 and closes TAC No. MA0484. It should be noted that this item was closed for Point Beach, Unit 2 in a letter dated August 31,

.1998.

'If you have any further questions regarding this issue, please contact me at (301) 415-1355.

Sincerely, SIGNED BY ORIGINAL Beth A. Wetzel, Senior Project Manager Project Directorate lil-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-266 cc: See next page

$ y p-]p pf"'"" ' C~]

DISTRIBUTION:

i L e

"" ~ " - ~ " ~ ~

Docket File (50-266).

PUBLIC PD#3-1 Reading E. Adensam OGC.

ACRS

~ B. Burgess, Region lli.

P. Rush E. Murphy DOCUMENT NAME: G:\\WPDOCS\\PTBEACH\\LTRA0484.WPD

  • No major changes to evaluation To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy OFFICE PM:PD31 EN LA:PD31 E

(A)C:EMCB*

D:PD31 C

BWetzel:db h CJamerson k ELMurphy CACarpe NAME DATE

/ / 2 8 /99

/ / % /99b b/ l /99 i

1/7/99 OFFICIAL RECORD COPY j

9902000171 990201

~

PDR ADOCK 05000266 P

PDR l

J

o

-o I

l Mr. Michael B. Sellman Point Beach Nuclear Plant Wisconsin Electric Power Company IJnits 1 and 2 cc:

j Mr. John H. O'Neill, Jr.

Ms. Sarah Jenkins j

Shaw, Pittman, Potts & Trowbridge Electric Divis!on 2300 N S'reet, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 Madison, Wisconsin 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201 Mr. Mark E. Reddemann Site Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator, Region lil U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Resident inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road

' Two Rivers, Wisconsin 54241 P

r

_