MAY 3 01986
.
.
Carolinf Power and Light Company
ATTN:,/Mr. E. E. Utley
'
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
!
Gentlemen:
SUBJECT: REPORT NOS. 50-325/86-13 AND 50-324/86-14
l
On April 30 - May 6, 1986, NRC inspected activities authorized by NRC Operating
!
License Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
I
areas, the inspection consisted of selective examinations of procedures and
i
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
tbom
d
rt.
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
i
!
Enclosure:
Inspection Report Nos. 50-325/86-13
and 50-324/86-14
w/ encl:
. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
cc w/ encl:
i
NRC Resident Inspector
Document Control Desk
/StateofNorthCarolina
1
RII
R
RII
hM/(w
QQ?r
.
Macdonald:bhg FJ e
AHerdt
5/er/86
5/4/86
5/ g/86
8606060228 860520
DR
ADOCK 0500
4
,
g
-
-
-
-
-
-
-
-
- -
-
.
.
-
-
- -
-
- - -