ML20151F970
| ML20151F970 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/14/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20151F973 | List: |
| References | |
| NUDOCS 8807280053 | |
| Download: ML20151F970 (2) | |
See also: IR 05000353/1988014
Text
y
Lc
..
. ' .
'
. ..-.'
' *-
..
.
.
.
.,
14 JUL 1988
r
Docket No. 50-353
-Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice President-Nuclear
2301 Market Street
Philadelphia, PA
19101
Gentlemen:
Subject:
Inspection Report 50-353/88-14
,
This letter transmits the findings of the routine resident safety inspection by
Messrs. R.'A. Gramm and R. L. Fuhrmeister on May 23, 1988 to June 26, 1988 at
the Limerick Generating Station, Unit 2, Limerick, Pennsylvania of activities
authorized by NRC License No. CPPR-107 and to the discussions held by the
inspector with Mr. D. A. DiPaulo and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed NRC Region
I Inspection Report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel and observations by the inspectors.
No violations were identified and no response to this letter is required.
Your cooperation is appreciated.
Sincerely,
N Sibed Dys
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
NRC Region I Inspection Report 50-353/88-14
l
l
,
OFFICIAL RECORD COPY
IR LIM 2 88-14 - 0001.0.0
'
8807280053 880714
07/11/88
'i \\
ADOCK 05000353
\\
Q
Qf
n
.
_. _
. _ _
,
.
_
. ..
. . . _ _ _ .
- -
. .
- .
. . ,
.
.
.
.
.
,
Philadelphia Electric Company
2
14 JUL 1988
i
cc w/encis:
'
John S. Kemper, Sr., Senior Vice President-Nuclear
S. J. Kowalski, Vice President, Nuclear Engineering
i
l
W. T. Ullrich, Manager, Limerick Unit 2 Startup
'
J. M. Corcoran, Manager, Limerick Quality Division
Graham Leitch, Vice President, Limerick Generating Station
J. W. Gallagher, Vice President-Nuclear Services
Troy B, Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
Dave Honan, PECo Licensisg
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Linville, Section Chief, RPS 2A
J. Durr, Branch Chief, DRS
R. Clark, NRR
B. Clayton, EDO
SRI, Limerick 1
~T .Tekea m, DM
l
l
/
RLgDRP
- DRP
.
Linville/rhl
Wenzinger
'
7//%88
7/f/88
0FFICIAL RECORD COPY
IR LIM 2 88-14 - 0002.0.0
07/11/88
__. .
. _ _ _ _ _ _