Other: ML072880306, ML20133G926, ML20134C649, ML20134M332, ML20137R696, ML20147J409, ML20149J361, ML20202C179, ML20249B858, VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period, VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2, VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas, VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536, VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site, VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl, VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described
|
MONTHYEARML0728803061996-07-15015 July 1996 Trojan Independent Spent Fuel Storage Installation Updated Safety Analysis Report Project stage: Other ML20129D9751996-10-23023 October 1996 Forwards Addl Comments on Response to Request for Addl Info Re Plant ISFSI Final Survey Plan Project stage: RAI VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site1996-10-30030 October 1996 Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site Project stage: Other ML20134M3321996-11-20020 November 1996 Grants Preliminary Approval of Trojan ISFSI Physical Security Plan Project stage: Other VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl1996-11-27027 November 1996 Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl Project stage: Other VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described1996-12-12012 December 1996 Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described Project stage: Other ML20133G9261997-01-14014 January 1997 Advises That Info Contained in Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,per Request Project stage: Other ML20134C6491997-01-30030 January 1997 Concurs That Addl Info & Attachment III to Pge Be Withheld from Public Disclosure Per 10CFR2.790 as Requested Project stage: Other ML20137P7431997-04-0404 April 1997 Informs That Info Provided in Response to NRC RAI & Calculations & Drawings,Discussed in 970310 Affidavit,Will Be Withheld from Public Project stage: RAI ML20137R6961997-04-10010 April 1997 Denies Request to Withhold Listed Info from Public Disclosure Because Info Does Not Meet Requirements of 10CFR2.790 Project stage: Other ML20147J4091997-05-0202 May 1997 Informs That Documents Contained in Affidavit Executed 970318 from Sierra Nuclear Corp,Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests Project stage: Request ML20149J3611997-07-24024 July 1997 Informs That Calculations Submitted in Support of Trojan ISFSI Application,Discussed in 970501 Affidavit,Will Be Withheld from Public Disclosure Project stage: Other ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided Project stage: Other VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period1998-02-10010 February 1998 Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period Project stage: Other VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 21998-05-13013 May 1998 Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2 Project stage: Other ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD Project stage: Other VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-15361998-08-25025 August 1998 Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536 Project stage: Other ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl Project stage: Meeting ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl Project stage: Meeting VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas1999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas Project stage: Other 1997-05-02
[Table View] |
Text
.
Portland General Electric Company Stephen M Osennoz Trojan SP.a Executive October 30,1996 VPN-067-96 Trojan Nuclear Plant Docket 50-344 License NPF-1 Docket 72-0017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Dear Sirs:
Troian Nuclear Plant - Final Survey Report for the ISFSI Site (TAC No. L22102)
This letter provides Portland General Electric Company's (PGE's) Fint] Survey Report for the ISFSI Site area of the Trojan facility. This Report was performed consi. stent with the Trojan Nuclear Plant Final Survey Plan for the Independent Spent Fuel Storage Installation (ISFSI) Site (PGE-1074). The Final Survey Report also reflects the PGE disposition of the NRC Stafi's Comments on Portland General Electric Company's Response to Request for Additional Information Regarding the Trojan ISFSI Final Survey Plan, which was transmitted to PGE by l
NRC letter, dated October 23,1996.
Please contact Mr. C. P. Yundt, of my staff at (503) 556-7492, if there are any questions related to this report.
Sincerely, Stephen M. Quennoz Trojan Site Executive Enclosure j
c: M. T. Masnik, NRC, NRR L. E. Kokajko, NRC, h%iSS L. J. Callan, NRC Region IV M 90 f
R. A. Scarano, NRC Region IV David Stewart-Smith, ODOE A. Bless, ODOE 9611050321 961030 l
PDR ADOCK 05000344
\\
Y PDR l
g4 71760 Columbia River Highway. Rainier, OR 97048 l
r 503/556-3713