ML20133L176

From kanterella
Jump to navigation Jump to search
Amend 112 to License NPF-62,introducing Net TS 3.10.10, Single Control Rod Withdrawal-Refueling, Under TS 3.10, Special Operations
ML20133L176
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/13/1997
From: Pickett D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20133L179 List:
References
NPF-62-A-112 NUDOCS 9701210516
Download: ML20133L176 (5)


Text

.

p Rio O

UNITED STATES

{

j NUCLEAR REGULATORY COMMISSION

'2 WASHINGTON, D.C. 20666 4001 o

'+9.,,,,o ILLINOIS POWER COMPANY. ET AL.

DOCKET NO. 50-461 CLINTON POWER STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 112 License No. NPF-62 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Illinois Power Company * (IP), and Soyland Power Cooperative, Inc. (the licensees) date.d April 19, 1996, and as supplemented by letter dated August 15, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and l

regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:

  • Illinois Power Company is authorized to act as agent for Soyland Power Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.

9701210516 970113 PDR ADOCK 05000461 p

PDR

] (2)

Technical Snecifications and Environmental Protection Plan i

The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.112, are hereby incorporated into this license.

Illinois Power Company shall operate the facility in i

accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMISSION l

%he~

V Douglas V. Pickett, Senior Project Manager Project Directorate III-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 13, 1997 i

ATTACHMENT TO LICENSE AMENDMENT NO. 112 FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.

The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

l Remove Paaes Insert Paaes 3.10-25 3.10-26

i i

Single Control Rod Withdrawal - Refueling s

3.10.10 3.10 SPECIAL~0PERATIONS 3.10.10 Single Control Rod Withdrawal - Refueling LCO 3.10.10 The requirements applicable during CORE ALTERATIONS of LC0 1

3.3.6.1, " Primary Containment and Drywell Isolation Instrumentation"; LC0 3.3.6.2, " Secondary Containment Isolation j

Insirumentation"; LC0 3.3.7.1, " Control Room Ventilation System i

Instrumentation"; LCO 3.6.1.2, " Primary Containment Air Locks";

LCO 3.6.1.3, " Primary Containment Isolation Valves"; LCO 3.6.4.1, " Secondary Containment"; LCO 3.6.4.2, " Secondary Containment Isolation Dampers (SCIDs)"; LC0 3.6.4.3, " Standby Gas Treatment (SGT) System"; LCO 3.7.3, " Control Room Ventilation System"; and LC0 3.7.4, " Control Room Air 1

Conditioning (AC) System" may be suspended in MODE 5 with a single control rod withdrawn from a core cell containing one or more fuel assemblies, provided the following requirements are met:

a.

All other control rods remain fully inserted; and l

b.

No other CORE ALTERATIONS are in progress.

APPLICABILITY: MODE 5 with a control rod withdrawn from a core cell containing one or more fuel assemblies.

ACTIONS


NOTE--------------------------------------

Separate Condition entry is allowed for each requirement of the LCO.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more of the A.1 Suspend CORE Immediately above requirements not ALTERATIONS except met.

for control rod insertion.

8E A.2 Initiate action to Immediately fully insert all control rods.

CLINTON 3.10-25 Amendment No.112

Single Control Rod Withdrawal - Refueling 3.10.10 l

j SURVEILLANCE REQUIREMENTS

)

SURVEILLANCE FREQUENCY i

SR 3.10.10.1 Verify all control rods other than the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control rod being withdrawn, are fully inserted 4

i i

i SR 3.10.10.2 Verify no other CORE ALTERATIONS are in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l

progress.

1 a

1 l

t i

.l 4

l CLINTON 3.10-26 Amendment No. 112