ML20129G134
| ML20129G134 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/23/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Terry C TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20129G138 | List: |
| References | |
| NUDOCS 9610300014 | |
| Download: ML20129G134 (5) | |
See also: IR 05000445/1996011
Text
_
__ .. .
_
. . _ _ _ _ _
_ _
,
i
- N%
UNITED STATES
f
gy
,*
NUCLEAR REGULATORY COMMISSION
)gg
REGloN IV
k
<
,.
6 /W'
E
611 RYAN r t.AZA DRIVE, SUITE 400
$ ~ * **
9.....
OCT 2 31996
-
Mr. C. L. Terry
TU Electric
Group Vice President, Nuclear
I
ATTN: Regulatory Affairs Department
!
P.O. Box 1002
i
Glen Rose, Texas 76043
i
i
SUBJECT:
NRC INSPECTION REPORT 50-445/96-11;50-446/96-11 AND NOTICE OF
(
VIOLATION
!
!
Dear Mr. Terry:
?
On September 28,1996, the NRC completed an inspection at your Comanche Peak Steam
l
Electric Station, Units 1 and 2, reactor facilities. The enclosed report presents the scope
and results of that inspection.
I
During this inspection, one violation of your procedures was identified by our inspectors.
The violation involved a failure to follow procedures for assuring that a danger-tagged
valve was in the proper position. This violation is being cited because it was NRC
identified and because it represents a deficiency which could have serious consequences if
not identified and corrected. We are also concerned that your initial characterization of the
mispositioned valve in your problem identification and resolution program would not have
resulted in a root cause evaluation.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document
Room (PDR).
Sincerely,
' .L
-
J. E. Dyer, Director
Division of Reactor Projects
9610300014 961023
ADOCK 05000445
G
-
T
.
.
.
TU Electric
-2-
i
'
,
i
!
t
Docket Nos.: 50-445
50-446
License Nos.: NPF-87
.
l
Enclosures:
-
2. NRC inspection Report
!
50-445/96-11:50-446/96-11
i
I
cc w/ enclosures:
,
Mr. Roger D. Walker
TU Electric
'
Regulatory Affairs Manager
P.O. Box 1002
Gleri Rose, Texas 76043
J
Juanita Ellis
i
President - CASE
1426 South Polk Street
i
Dallas, Texas 75224
I
TU Electric
Bethesda Licensing
3 Metro Center, Suite 610
.
.
Bethesda, Maryland 20814
l
George L. Edgar, Esq.
1800 M. Street, NW
Washington, D.C. 20036
G. R. Bynog, Program Manager /
Chief Inspector
l
Texas Department of Licensing & Regulation
Boiler Division
l
P.O. Box 12157, Capitol Station
j
'
j
i
Honorable Dale McPherson
County Judge
!
P.O. Box 851
l
Glen Rose, Texas 76043
l
,
'
i
I
)
. .
, _.
- -
. _ .
. _ . .
. _ ,
..-
. , .
_ , . . , .
,
- . _
_
.. _
..
. . .
.
_-.
.
.
TU Electric
-3-
,
1
.
Texas Radiation Control Program Director
1100 West 49th Street
,
l
a
!
Susan Rieff, Director
'
Environmental Policy
Office of the. Governor
P.O. Box 12428
,
.
. ag
TU Electric
-4-
OCT 2 31996
E-Mail report to D. Nelson (DJN)
E Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Richard Correia (RPC)
E-Mail report to Ronald Frahm, Jr. (RKF)
{b6c to'DMB (IE01)
bec distrib. by RIV:
L. J. Callan
Resident inspector (2)
DRP Director
DRS-PSB
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, M3: TWFN 9E10)
,
I
l
DOCUMENT NAME: R:\\_CPSES\\CP611 RP. ATG
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy wth enclosures "N" = No copy
'
RIV: SRI
C:DRP/A
D:DRP
l
l
l
,,
_
,,
m ,,
ATGody
/A(&JITapia ff/g_ pf JEDyer Mi f,
l
10/f 796
10//796 ( ,
10{3/96
(f
10/ /96
1C/ /96
'
g
8 OFFICIAL RECORD COPY
to/ Elf 46
J
~
280019
x
)
J
f.
-
!
- .
J
TU Electric
4
OCT 2 31996
l
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Richard Correia (RPC)
E-Mail report to Ronald Frahm, Jr. (RKF)
bec to DMB (IE01)
bec distrib by RIV:
L. J. Callan
Resident inspector (2)
DRP Director
DRS-PSB
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
i
DOCUMENT NAME: R:\\_CPSES\\CP611 RP.ATG
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy
RIV: SRI
C:DRP/A
D:DRP
l
,,
_
,,
,,
ATGody
/fC
JITapia g//4.p.g JEDyer bF j,
&
l
10/d36
10//796 ( ,
10(y96
li
10/ /96
10/ /96
'
8 OFFICIAL RECORD COPY
to/ LZ/96
,
. _ . _
- - ~ - -
r
~
' ~
_