B11581, Informs That Schedule for Human Factors Review for Fire Protection Will Be Included in Control Room Design Review Program.Review Performed Per Suppl 1 to NUREG-0737.Safe Shutdown Procedures Will Be Implemented Following Mods
| ML20129C830 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 07/01/1985 |
| From: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | Zwolinski J Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 B11581, NUDOCS 8507160341 | |
| Download: ML20129C830 (1) | |
Text
r CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N.
CONNECTICUT P O Box 270 HARTFORD, CONNECTICUT 06141-0270 TELEPHONE 23*5 "
July 1,1985 Docket No. 50-213 Bl1581 Director of Nuclear Reactor Regulation Attn:
Mr. John A. Zwolinski, Chief Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
J. A. Zwolinski letter to W. G. Counsil, dated November 14,1984.
Gentlemen:
Haddam Neck Plant Human Factors Review for Fire Protection By the referenced letter the Staff forwarded an exemption from certain requirements of 10 CFR 50, Appendix R for the Haddam Neck Plant control room. The exemption contained a condition that Connecticut Yankee Atomic Power Company (CYAPCO) provide a human factors review demonstrating that operators can perform the necessary actions outside the control room in a timely and effective manner. The letter also stated this review may be performed af ter completion of the modifications and can be included in our control room design review (CRDR) performed in accordance with Supplement I to NUREG-0737.
CYAPCO hereby informs the Staff our schedule for the human factors review for fire protection will be included in our CRDR program plan which is required to be submitted to the Staff by February 28,1986. Procedures to achieve safe shutdown with loss of the main control board or the auxiliary control cabinets will be implemented af ter the fire protection modifications discussed in the referenced letter are completed. CYAPCO understands these procedures are subject to NRC approval.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY
%FGA I
J. F. Opok'a U
Senior Vice President L d fr j
8507160341 050701 0~