3 4'
I q
t 9
GNTERIOR W
ENERGY 6200 Oak Tree Boulevard Mail Address j
independence OH PO Box 94661 216-447-310 0 Cleveland OH 441014661 i
Docket Number 50-346 License Number NPF-3 Serial Number 2402 September 4, 1996 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
License Amendment Application to Revise Technical Specification 6.2.3, Facility Staff Overtime I
Ladies and Gentlemen:
Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License Number NPF-3, Appendix A, Technical Specifications. The proposed change involves Technical-Specification (TS) 6.2.3, Facility Staff Overtime.
The proposed change would modify the existing TS 6.2.3 by removing the specific overtime limits and working hours from the TS consistent with the NRC's recent determination, on a generic basis, that such limits need not be specified in the TS.
This determination was documented in the NRC Staff's Safety Evaluation for Amendment Numbers 127 and 116 (NRC TAC i
Numbers M86191 and M86192) to the Operating Licenses (Numbers NPF-10 and j
NPF-15, respectively) for Southern California Edison Company's San Onofre 1
Nuclear Generating Station Units 2 and 3.
The specific overtime limits and working hours will be removed from the TS and relocated to the DBNPS's Technical Requirements Manual (TRM) which is referenced in the DBNPS's Updated Safety Analysis Report (USAR).
Future changes will then be controlled in accordance with Section 50.59 of Title 10 of the Code of Federal Regulations.
/ /
The existing TS 6.2.3 will be revised editorially to facilitate the removal j
of specific overtime limits and working hours.
In addition, a new
/[80/
i requirement will be added for plant administrative procedures to ensure that individual overtime for plant personnel identified in the procedures as performing safety-related functions will be reviewed monthly by the plant manager or his designee (s).
a-9609170326 960904 PDR ADOCK 05000346 P
PDR u
operating Componies Cieveland Electne liluminat:ng Toledo Edson
~
bocketNumber50-346 License Number NPF-3 Serial Number 2402 l
Page 2 i
Toledo Edison requests that this amendment application be expeditiously reviewed by the NRC and the amendment be issued by December 6, 1996.
Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 1 321-8466.
Very truly yours, Jo m K. Wood Vice President - Nuclear Davis-Besse Nuclear Power Station DRW/laj Enclosure cc:
A. B. Beach, Regional Administrator, NRC Region III L. L. Gundrum, NRC/NRR Project Manager S. Stasek, NRC Region III, DB-1 Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)
Utility Radiological Safety Board j
l 4
1