(Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations
ML20105A434
Person / Time
Site: Millstone, Summer  Dominion icon.png
Issue date: 04/14/2020
From: Mark D. Sartain
Dominion Energy Nuclear Connecticut, Dominion Energy Services, Dominion Energy South Carolina
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
20-083
Download: ML20105A434 (7)


Text

Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com Attn: Document Control Desk April 14, 2020 United States Nuclear Regulatory Commission Washington, DC 20555-0001 A, Dominion iJ a,, Energy Serial No.:

20-083 NRA/khb Docket Nos.: 50-336/423 50-395 License Nos.: DPR-65 NPF-49 NPF-12 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)

DOMINION ENERGY SOUTH CAROLINA, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 NRC REGULATORY ISSUE

SUMMARY

2020-01 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2020-01, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter.

If you have any questions concerning this information, please contact Mr. Craig Sly at (804) 273-2784.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy Nuclear Connecticut, Inc. and Dominion Energy South Carolina, Inc.

Enclosures:

1. NRC Form 536 for Millstone
2. NRC Form 536 for V. C. Summer Commitments made by this letter: None

SN 20-083 Scheduling of Operator Licensing Examinations Page 2 of 2 cc:

U.S. Nuclear Regulatory Commission Region I ATTN: Operations Branch 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II ATTN: Operations Branch Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Guzman NRC Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Ted Carter NRC Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop T-8 F5 Rockville, MD 20852-2738 Mr. Shawn A. Williams U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B1-A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector V. C. Summer Nuclear Station NRC Form 536 for Millstone Power Station Millstone Power Station Dominion Energy Nuclear Connecticut, Inc.

Serial No 20-083

NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020

{11-2017)

,>~~

'l' OPERA TOR LICENSING Es11mama booferl per rnsponse 1D comply wilh !hiS V<lklllla/Y lnfQl'lllaljof) cc~,equest 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thi$

information oollection is used 1D plan budgets and resources for opera!Pr examinations.

Send EXAMINATION DATA commenlll regl!lding burden eslimale to !he ln!ormat!on SeNiiles Brancl! (T-2 F43), U.S. Nuclear Reguiaull}' Commission. Washing1Dn. DC20555-0001, or by 8-mal to lnfocollecls.Resouree@nrc.gov, and to the Dll$1< Officer. Office of lnlormation and Regulau,iy Aoo, NEOB-10202. (3150-0131), Office of Management and Budge!, Washingron. DC 20503.

If a means used lo impose an infonnation colleciioo doe$ not display a curranff)I vafid 0MB ootilrol number, the NRC may not eooduct or sponsor, and a ptlfllO!l is not required 1D raspond to, me ml!llllion COiiection.

FACILITY NRCREGION

!MILLSTONE POWER STATION - UNIT 2 11 1

I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 22 CY 23 CY 24 CY 25 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 l

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 22 CY 23 CY 24 CY 25 NUMBER OF REACTOR 8

0 8

0 OPERATORS

. NUMBER OF SENIOR REACTOR 4

0 4

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4

0 4

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 9/12/22 9/16/24 ALTERNATE DATE 9/19/22 9/23/24 NRC FORM 536 (11*2017)

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017}

~"'""<.

+'"

OPERA TOR LICENSING Estimaleo burden per respoosG to complywilh this voiuntaly fnfomla1!on collediol'I request I hour. This informalion colleciion is used to plan budgeiS and resourees for operator examlnatiQns. Send EXAMINATION DATA commenlS regarding burden estimam to Iha lnfonnalioll Services Branch (T-2 F43J. U.S. NU<:lear

,,;.-1'.r;

+d"~

Regulatory Commlssio!l, Wal!hingti,n, DC20555-0001, or by e-mail Ill lnfocollec!R.Resooree@nro.9ov.

and to 1he Desi< Officer, Office of lnformalion and Regulatory Affairs, NEOS.10202, (3150--0131). Office

't-.....,fll or Maoagement and Bu(l;let Washington, DC 20503.

If a means used to impose an i11ID!lll8lion colledi<:>fl does not display a -lly '1811d 0MB control number, the NRC mr,;1 not conduct or sponsor, and a pe!SOO IS not required to raspo!ld lo, Ille information co!lediof!.

FACILITY NRCRE.GION

!MILLSTONE PO~R STATION - UNIT 3 11 1

I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 22 CY 23 CY 24 CY 25 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

l EXAMINA TlONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 22 CY 23 CY 24 CY 25 NUMBER OF REACTOR 0

8 0

8 OPERATORS NUMBER OF SENIOR REACTOR 0

4 0

4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

4 0

4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DA TES PRIMARY DATE 9/11/23 9/15/25 AL TERNA TE DATE 9/18/23 9/22/25 NRC FORM 536 (11-2017)

NRC Form 536 for V. C. Summer Nuclear Station Virgil C. Summer Nuclear Station Unit 1 Dominion Energy South Carolina, Inc.

Serial No 20-083

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~C....J;>ff.FfEOq<.,>:

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~

OPERA TOR LICENSING infonnation collection is used to plan budgets and resources for operator examinations.

Send EXAMINATION DATA comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocoUects.Resource@nrc.gov,

"°'1"q****¥ and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.

If a means used to impose an information colleclion does not display a curren!ly valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRCREGION lv.c. Summer I !Region II I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 CY 2023 CY 2024 cy202s ESTIMATED NUMBER OF LICENSEE-PREPARED NIA 1

NIA 1

EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED NIA NIA NIA NIA EXAMINATIONS

8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2022 CY2023 CY2024 CY2025 NUMBER OF REACTOR NIA 6

NIA 6

OPERATORS NUMBER OF SENIOR REACTOR NIA NIA NIA NIA OPERATORS INSTANT NUMBER OF SENIOR REACTOR NIA 6

NIA 6

OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR NIA NIA NIA NIA OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NIA 08/0712023 NIA 0412812025 ALTERNATE DATE NIA 09/04/2023 NIA 0512612025 NRC FORM 536 (11-2017)