- D)9 s'
LI-LCO, March 11, 1985 I
USC G TED USh?c UNITED STATES OF AMERICA,,..
NUCLEAR REGULATORY COMMISSION 13 E0 :27
' 7 :
Before the Atomic Safety and Licensing Board
~
In the Matter of
)
)
LONG ISLAND LIGHTING COMPANY
)
Docket No.'50-322-OL-3
)
(Emergency Planning (Shoreham Nuclear Power Station, )
Proceeding)
Unit 1)
)
LILCO'S ANSWER TO " MOTION OF SUFFOLK COUNTY AND NEW YORK STATE TO ADMIT NEW CONTENTION" (INCLUDING A REQUEST THAT THE ISSUE BE CERTIFIED TO THE COMMISSION AND THAT THE NEW ISSUES BE SEVERED FROM THE REST)
I.
INTRODUCTION On February 25, 1985, Intervenors Suffolk County and New York State moved this Board to admit a new three-part conten-tion alleging that LILCO's emergency plan does not adequately provide for medical treatment for members of the public exposed to high levels of radiation.
The proposed contention was prompted by the District of Columbia Circuit's decision con-struing the phrase " contaminated injured individuals" in 10 C.F.R. $ 50.57(b)(12)1/ in GUARD v. U.S. Nuclear Regulatory Commission, No. 84-1091 (D.C. Cir., February 12, 1985).
1/
Subsection 50.47(b)(12), in full, sets out a requirement that:
"Arrangments are made for medical services for contami-j nated injured individuals."
8503140243 850311 ADOCK0500g322 PDR 9p l
TJ S O 3
- In this Answer LILCO (1) urges denial of the contention as premature since the mandate has not yet issued in the GUARD case, (2) does not dispute that the Intervenors have met four out of the five criteria for admission of a late-filed conten-tion and that therefore a contention, if properly drafted and not premature, could be admitted, but (3) takes exception to the wording of the contention submitted by the Intervenors as overbroad.
Moreover, LILCO requests that the Board certify the issue of how to interpret 10 C.F.R. $ 50.47(b)(12) to'the Com-mission, and also that the Board render a decision as soon as possible on those many issues in this case that are fully tried and briefed and ripe for decision, and save until a later decision the medical care issue and any aspects of the relocation center issue that require further proceedings, if there are any such aspects.
II.
THE CONTENTION IS PREMATURE The D.C. Circuit's decision in the GUARD case was issued on February'12, 1985.
Rule 14(c)(1) of the D.C. Circuit's local rules automatically allows 45 days for the filing of any motion for rehearing in any case in which the U.S. government or any agency thereof is a party.
The Court on February 12 issued a sua sponte order staying issuance of the mandate in the GUARD case until 7 days after disposition of any timely filed motion for rehearing.
Notice for rehearing will thus be due 45 days after February 12, i.e.,
on March 29.
Il no motion
o is filed, the mandate could issue that day; if a motion is filed, it could issue no earlier than April 5.
Prior to entry of the mandate the decision is of no binding effect.
The mandate's issuance may be further stayed by motions for reconsideration or petitions for certiorari.
It makes no sense for this Board to prematurely expend its own resources and those of the parties on a matter which may never become ripe.2/
The Board should deny Intervenors' motion to admit this new contention as premature at this time, or at Cir-least place it in abeyance pending issuance of the D.C.
cuit's mandate, the Board should also not let the contingent pendency of this issue delay its ultimate disposition of other issues before it.
III.
THE FIVE FACTORS FOR LATE-FILED CONTENTIONS On pages 5-9 of their Motion the Intervenors argue that they have met all five factors that a board must consider in admitting late-filed contentions.
The factors are the following:
(i)
Good cause, if any, for failure to file on time.
(ii)
The availability of other means whereby the petitioner's interest will be pro-tected.
2/
Of all the parties in this case, LILCO probably has the least incentive to incur any delay in resolution of issues.
In the event the mandate ever issues LILCO will urge and cooperate in the implementation of expedited procedures foi resolution of a contention of appropriate scope and specificity.
-4 (iii)
The extent to which the petitioner's participation may reasonably be expected to assist in developing a sound record.
(iv)
The extent to which the petitioner's in-terest will be represented by existing parties.
(v)
The extent to which the petitioner's par-ticipation will broaden the issues or delay the proceeding.
As to four of the five factors (all, that is, except the last one about broadening the issues and delaying the proceeding),
LILCO does not dispute that the factors favor admission of a late-filed contention, assuming it is drafted so as to address the precise issue decided in GUARD.3/
With respect to the fifth factor (that is, the extent to which the petitioner's participation will broaden the issues or delay the proceeding), the Intervenors claim that the new con-tention "would not delay this proceeding to any significant de-gree" (Motion at 9).
This statement is incredible, but it mat-ters little as long as hearing and decision on the contention are severed from the Board's decision on the other fully briefed issues now before it, since the weight of the oth'er factors is in the Intervenors' favor.
3/
As to the thi'rd factor (that is, the extent to which the petitioner's participation may reasonably be expected to assist in developing a sound record), LILCO does not concede that there is likely to be any value to hearing suffolk County wit-nesses Harris and Mayer yet another time.
LILCO's concession on this point goes only to the proposition that, on the face of the Intervenors' pleading, and ignoring the merits of testimony that has been presented earlier in this proceeding, the peti-tion satisfies the NRC criteria for late-filed contentions.
- Thus, LILCO does not dispute that, on balance, the In-tervenors have met the standards of 10 C.F.R. $ 2.714 for a late-filed contention, presuming the contention is properly drafted.
It is to that question we turn next.
IV.
THE CONTENTIONS Leaving aside the preamble to the contention, which is unnecessary surplusage, the contention reads as follows:
A.
LILCO has no agreements with the hospitals listed in the LILCO Plan (see OPIP 4.2.2, Attachment 1) which provide that those facilities will be available and capable of rendering necessary medi-cal treatment to contaminated individuals in the event of a radiological emergency at Shoreham.
In the absence of such agreements,-the LILCO Plan does not and cannot comply with 10 CFR Sections 50.47(a)(1), 50.47(b)(1), 50.47(b)(3),
50.47(b)(8), 50.47(b)(12), and NUREG 0654, Sections A.3 and C.4.
B.
Medical personnel at the hospi-tais identified in the Plan have not been trained to perform necessary medical ser-vices during a radiological emergency.
In addition, Intervenors contend that medical staff preparedness is deficient because there has been inadequate training with respect to proper decontam-ination procedures and treatment.
Fur-thermore, the Plan provides no assurance that~ training can and will be provided to such medical personnel.
As a result, the LILCO Plan fails to comply with 10 CFR Sections 50.47(a)(1), 50.47(b)(12),
50.47(b)(14), 50.47(b)(15), and NUREG 0654, Sections II.L, N and O.
C.
LILCO has developed no plans for the hospital and medical services relied upon in the Plan to provide treatment for contaminated individuals, including plans for transporting contaminated injured individuals to such hospitals, many of which are located substantial distances i
L
O
. 4 from the Shoreham plant.
Thus, there is no assurance that facilities and medical personnel will be adequately prepared or able to handle and treat contaminated individuals in the event of an emergency at Shoreham, as required by 10 CFR Sec-tions 50.47(a)(1), 50.47(b)(8),
50.47(b)(12), and NUREG 0654,Section II.L.
This contention is inadmissible as written.
The reason is that
)
all three parts refer to " contaminated individuals" or
" decontamination," and contaminated individuals and decontamination are not placed in issue by the GUARD decision.
In LILCO's view, the phrase " contaminated injured indi-viduals" in 10 C.F.R. $ 50.47(b)(12) covers two categories of i
people and does not cover a third..The three categories are:
1.
People who are both contaminated and have some conventional injury such as a wound 4
or a broken bone (the " contaminated and injured");
2.
People who are contaminated but not in-jured; and 3.
People who have been " exposed" to high levels of radiation (" radiation-exposed people").
The first category -- persons who are both radioactively contaminated and conventionally injured -- is covered under the Commission's regulations at 9 50.47(b)(12) but was not at issue in GUARD, and existing arrangements under the LILCO Plan, al-ready available for litigation, are as legally acceptable now as they ever were.
The second category -- persons who require decontamination but are not injured -- is not addressed at 5 50.47(b)(12)4/ and was, again, not at issue in the GUARD 4/
For example, monitoring of evacuees at relocation centers is covered by $ 50.47(b)(10) and by NUREG-0654 planning stan-dard J-12.
- LILCO has made arrangements for monitoring and case.
decontaminating members of the public at the Nassau Coliseum and, while those arrangements are being contested by the Inter-venors as they try to reopen the relocation center issue, they_
are not affected by the GUARD decision.
The third category -- persons who have been exposed to high levels of radiation but are not otherwise injured -- is The issue in the only category addressed by the GUARD case.
GUARD was " arrangements.
. made for medical services" for persons " exposed to dangerous levels of radiation."
- GUARD, slip op. 3, 6, 9, 10.
These are the " radiation-exposed pub-lic."
GUARD, slip op. 10.
Accordingly, the contention submitted by the Intervenors would be admissible only with the following changes:
A.
In contention subpart A, change "contami-nated individuals" to " radiation-exposed individuals."
B.
In contention subpart B, strike the sec-ond sentence ("In addition, Intervenors contend that medical staff preparedness is deficient because there has been inad-equate training with respect to proper decontamination procedures and treat-ment.").
C.
In contention subpart C, change "contami-nated individuals" to " radiation-exposed individuals" both places it occurs; change " contaminated injured individuals" to " radiation-exposed individuals."
Finally, since only 10 C.F.R. $ 50.47(b)(12) was at issue in GUARD, references to other regulations, and to NUREG-0654 standards other than II.L, should be deleted from the contention.
LILCO does not concede that the contention, even if 5
rewritten as proposed above, would necessarily present a factu-al question that requires a public hearing; some or all of the contention might be resolved by legal briefs or a motion for 1
summary disposition.
For example, it is not clear from the GUARD decision that there is a legal requirement that there be agreements with hospitals or that there be assurance.that medi-cal personnel have been trained.
Nor is it apparent that there f
is an obligation to provide a hospital-specific plan for each and every hospital in the list of hospitals that was formerly.
,I all that was required by the NRC.
The court, in fact, left j
1 completely open what is required, holding only that the list formerly required is insufficient.
1 1
V.
REQUEST FOR j
CERTIFICATION TO THE COMMISSION 4
l Assuming the contention is rewritten to properly address the issue decided in GUARD, it is still unquestionably a contention about a generic issue, one affecting, presumably, J
all the nuclear plants in the country.
The Commission has
~
already ruled that the NRC interpretation of 10 C.F.R.
l 6 50.47(b)(12), at issue in GUARD and raised by the Interve-l 1
nors' proposed contention, involves "a significant issue of l
policy that affects other plants and proceedings," therefore meriting directed certification.
Southern California Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3),
CLI-82-27, 16 NRC 883, 884 (1982); see also GUARD, slip op. at l
l
,..a
- ~. -
7.
Although the issue arose in the specific context of the San Onofre proceeding, the Commission made its interpretation generic.
See Southern California Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3), CLI-83-10, 17 NRC 528 (1983).
Now that the court has overruled that interpreta-tion, it is clearly the case that a new generic interpretation is needed.
The meaning of 10 C.F.R. S 50.47(b)(12) is still a "significant issue of policy" affecting licensed plants and other licensing proceedings, and the reasons for making a ge-neric interpretation are at least as strong now as they were l
when the Commission first addressed the issue.
Accordingly, LILCO asks this Board to certify to the Commission the question how 10 C.F.R. 5 50.47(b)(12) is to be interpreted in light of the GUARD decision.
In particular, the precise questions to be certified are the following:
(1)
Does the phrase " contaminated injured in-dividuals" as used in 10 C.F.R.
$ 50.47(b)(12) require applicants for nu-clear power plants to provide arrange-ments for medical services only for mem-bers of the public who have suffered traumatic [ physical] injury and'are also contaminated with radiation?
(2)
If the answer to Question 1 is no, to what extent does 10 C.F.R. 9 50.47(b)(12) require advance, specific arrangements and commitments for medical services for the general public as opposed to the gen-eral knowledge that facilities and-re-sources exist'and could be used on an ad hoc' basis?
These are, of course, the questions addressed by the Commission originally in San Onofre.
They now must be readdressed in light of GUARD.
LILCO urges prompt certification of this
R r question and, placing proceedings on the pending petition in abeyance, pending its outcome if the Board has not denied the motion as premature.
VI.
LILCO'S REQUEST FOR PROMPT DECISION The Intervenors have now mounted two major efforts to require this Board to conduct additional hearings, first on the Nassau Coliseum reception center and now on medical care for radiation-exposed members of the public.
LILCO has no way of knowing what additional issues the Intervenors may attempt to reopen in the future.
Hearings themselves are burdensome enough, but in addition the extensive discovery in which the Intervenors insist on engaging for every issue is likely to consume a large amount of time.
In particular, there may be considerable delay in resolving the medical care issue.
The D.C. Circuit's mandate in GUARD has not yet issued.
Until it does, the decision is not binding on the Commission.
If the Commission or the intervenor utilities in GUARD seek review by the U.S.
Supreme Court, the granting of certiorari will stay the mandate of the Court of Appeals.
Thus, there may be a considerable length of time before it is settled whether the Commission need do anything about GUARD at all.
The record in this proceeding has been closed some eight months, since August 26, 1984.
It has been fully briefed on all factual issues since November 14 and on all legal issues since November 25, 1984.
The Commission has indicated that a
' -decision in this case is expected this month.
LILCO believes that the Board should proceed to render a partial initial deci-sion on all issues that are ripe for decision, including the
" legal authority" issues (Contentions 1-10).
If.either the re-location center issue or the medical care issue becomes the subject of full-blown litigation (and delay of decision on other-issues provides an incentive to spawn such litigation),
then resolution of these issues ought simply to be separated from the other issues and treated in a later partial initial t
decision.5/
Any delay in the rendering of a partial initial decision on all the other issues now fully briefed would prejudice LILCO.
As we have noted recently, there are indications that the absence of a decision is already delaying planning for an exercise (see LILCO's Renewed Motion for Summary Disposition of Legal Authority Issues on Federal-Law Grounds, February 27, 1985, at 9-10).
As a very important practical matter, if the Board finds any deficiencies in the emergency plan, LILCO may need time to correct the problem, and that time cannot begin to run until a decision is issued.
5/
Intervenors have indicated their intent to litigate the results of a graded exercise when one is held.
Since such an exercise-(and litigation of it, if successfully developed) is a prerequisite to a full-power license, Intervenors will not be
. prejudiced by decision of reception center and hospital issues then, rather than holding the Board's decision on the literally scores of other litigated emergency planning issues hostage to two late issues (plus any others that the Intervenors manage to add later on).
, Accordingly, LILCO requests the Board to render its f
partial initial decision on all of those issues that can now be e
I i
resolved, including the legal authority issues, as soon as possible.
Any other issues -- including the medical care issue -- can and should be left for a later decision.
t Respectfully submitted, LONG ISLAND LIGHTING COMPANY BY _We N.
/fonald P.
Itwin VJames N. Christman Kathy E. B. McCloskey Hunton & Williams P.O. Box 1535 707 East Main Street Richmond, VA 23219 DATED:
March 11, 1985 4
1 4
f A
I LILCO, March 11, 1985 CERTIFICATE OF SERVICE In the Matter of LONG ISLAND LIGHTING COMPANY (Shoreham Nuclear Power Station, Unit 1)
Docket No. 50-322-OL-3 I hereby certify that copies of LILCO'S ANSWER TO "MO-TION OF SUFFOLK COUNTY AND NEW YORK STATE TO ADMIT NEW CONTEN-TION" (INCLUDING A REQUEST THAT THE ISSUE BE CERTIFIED TO THE COMMISSION AND THAT THE NEW ISSUES BE SEVERED FROM THE REST) were served this date upon the following by first-class mail, postage prepaid or, as indicated by an asterisk, by Federal Ex-press, or, as indicated by two asterisks, by telecopy and Fed-eral Express:
Morton B. Margulies,**
Secretary of the Commission Chairman U.S. Nuclear Regulatory Atomic Safety and Licensing Commission Board Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Atomic Safety and Licensing East-West Tower, Rm. 402A Appeal Board Panel 4350 East-West Hwy.
U.S. Nuclear Regulatory Bethesda, MD 20814 Commission Washington, D.C.
20555 Dr. Jerry R. Kline**
Atomic Safety and Licensing Atomic Safety and Licensing Board Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission East-West Tower, Rm. 427 Washington, D.C.
20555 4350 East-West Hwy.
Bethesda, MD 20814 Bernard M. Bordenick, Esq.**
Oreste Russ Pirfo, Esq.
Mr. Frederick J. Shon**
Edwin J. Reis, Esq.
Atomic Safety and Licensing U.
S. Nuclear Regulatory Board Commission U.S. Nuclear Regulatory 7735 Old Georgetown Road Commission (to mailroom)
East-West Tower, Rm. 430 Bethesda, MD 20814 4350 East-West Hwy.
Bethesda, MD 20814 4
e 1
Donna Duer, Esq.**
Stewart M. Glass, Esq.*
Regional Counsel Attorney Atomic Safety and Licensing Federal Emergency Management l
l Board Panel Agency U.
S. Nuclear Regulatory 26 Federal Plaza, Room 1349 Commission New York, New York 10278 East-West Tower, North Tower 4350 East-West Highway Stephen B. Latham, Esq.*
Bethesda, MD 20814 Twomey, Latham & Shea j
33 West Second Street l
Fabian G. Palomino, Esq.*
P.O. Box 398 Special Counsel to the Riverhead, New York 11901 Governor Executive Chamber Ralph Shapiro, Esq.*
Cammer & Shapiro, P.C.
Room 229 State Capitol 9 East 40th Street Albany, New York 12224 New York, New York 10016 Mary Gundrum, Esq.*
James Dougherty, Esq.
Assistant Attorney General 3045 Porter Street i
2 World Trade Center Washington, D.C.
20008 l-Room 4614 l
New York, New York 10047 Jonathan D. Feinberg, Esq.
New York State Department of Herbert H. Brown, Esq.**
Public Service, Staff Counsel Lawrence Coe Lanpher, Esq.
Three Rockefeller Plaza i
Christopher McMurray, Esq.
Albany, New York 12223 Kirkpatrick & Lockhart l
8th Floor Spence W. Perry, Esq.
1900 M Street, N.W.
Associate General Counsel Washington, D.C.
20036 Federal Emergency Management Agency MHB Technical Associates 500 C Street, S.W.
1723 Hamilton Avenue Room 840 Suite K Washington, D.C.
20472 San Jose, California 95125 Ms. Nora Bredes Mr. Jay Dunkleberger Executive Coordinator New York State Energy Office Shoreham Opponents' Coalition Agency Building 2 195 East Main Street Empire State Plaza Smithtown, New York 11787 Albany, New York 12223 l
l l
l
e,
- Gerald C. Crotty, Esq.
Martin Bradley Ashare, Esq.
Counsel to the Governor suffolk County Attorney Executive Chamber H. Lee Dennison Building State Capitol Veterans Memorial Highway Albany, New York 12224 Hauppauge, New York 11788 i
WM b.
A f' dames N. Ch#1stman g
j Hunton & Williams 707 East Main Street P.O. Box 1535 Richmond, Virginia 23212
)
DATED:
March 11, 1985 i
i
)
a J
i i
l I
I k
1 i,
4 l