Responds to Weaknesses Noted in Insp Repts 50-334/91-201 & 50-412/91-201.Corrective Actions:Evaluation Process for commercial-grade Matl Will Establish Acceptability of Stored commercial-grade Matl Based on Performance History
ML20094N419
Person / Time
Site: Beaver Valley
Issue date: 03/27/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9204060345
Download: ML20094N419 (8)


Text

.

. - - - _ - ~. _ _ -

(

Hesi+t va e, Power station F#iippir.ppori rA 1SW74M (412) 393 8475$

1 t

JOHN D SitbER Vete Presioer*. Nudeat Group Mal'ch 77, 1992 U.

S. Nuclear Regulatory Commission Attn:

Document Control sosk Washington, DC 20555 Subject Boavor Valloy Power Station, Unit No. 1 and No. 2 DV-1 Docket No. 50-334, Licenno No. DPR-66 DV-2 L:ocket No. 50-412, Liconuo No. NPF-73 Commercial Grado Matorial Evaluation Program Reference

1) NRC Inspection Report Hos. 50-334/91-201 and 50-412/91-201 During the period of March 4-8,
1991, the NRC conducted an assessment-of procuromont and commercial-grado dedication programs at BVPS.

The reference NRC Inspect'.,n Report summarized the resulta of the assessment.

DLC has taken stops to correct the weaknescos identiflod in that report.

In response to the report'a conclusion that programmatic requirements should be established to determine the basis for the use of commercial-grado stock that was purchased before September, 1989, DLC is planning to implement an ovaluation program.

A doccription of the ovaluation process for stored commercial-grade material is attached for your information.

Should you have any questions concerning this program, please contact G.

L.

Boatty at 412-393-5225.

Sincoroly,

/

D S ober ResidentIf/..

cc:

Mr.

L. W. Rossbach, Sr.

spector Mr. T. T. Martin, HRC Region I Administrator Mr. U.

Potapovs, Vendor Inspection Branch Mr. A.

W.

DeAgazio, Project Manager Mr. M.

L.

Bowling (VEPCO)

}

hiM

\\

l

,i u

5 C[

9204060345 920327 I

PDR ADOCK 05000334 G

PDR

4 s

BEAVER VA!. LEY POWER STATION PAST PROCUREMENT REVIEW PROJECT OUTLINE Evaluation Process for Stored Conuuercial Grade Material

1.0 Background

During the NRC Assessment of the procurement and commercial grade dedication programs at the Beaver Valley Power Station, Report Nos. 50-334/91-201 and 50-412/91-201, the NRC expressed concern that " wholesale grandfathering is not appropriate for all warehoused CGir."

In NRC Generic Letter 91-05,.nc ;taff clarified their position regarding the review of past procurements as follows:

"In addition, the staff does not expect licensees to revic v all past procurements.

However, if during curren, procurement activities, licensees identify shortcomings in the form, fit, or function of spe:ific vendor products, or if failure experience or curren. information on supplier adega.y indicates that a component may not be suitable for service, corrective actions are required for all such installed items in accordance with Criterion XVI of 10 CFR Part 50 Appendix B. Also in accordance with Criterion XVI, licensees must determine programmatic causes when actual deficiencies in several products from different vendors are identified during current procurement activities and these deficiencies lead to the replacement of inalled items as part of corrective action. In such cases, a further sampling of previously procured commercial-grade items may be warranted."

The NRC Staff further clarified their position in Beaver Valley Assessment Report as follows:

"Cuctently, there are no program requirements to determine if the item may have a detrimental effect on plaat safety by reviewing the item's performance record based on factors such as operational failures, knowledge of problem manufacturers or suppliers

, and industry-wide performance data identified in documents issued by the NRC (such as bulletins, notices), licensee event reports issued by licensees or documents issued by the Institute of Nuclear Power Operations through the Nuclear Plant Reliability Data System (NPRDS).

it may be appropriate to look at the complexity of the part, plant application, and 1

ilEAVER VALLEY POWER STATION PAST PROCllREMENT REVIEW PROJECT Otrl'LINE prior acceptance of and dedication activities for the CGI before concluding that no dedication action is required."

The planned project is specifically directed at addressing the staff's position by performing an evaluation on all uoted commercial grade materials which had been purchased prior to September 1989 and had not been previously dedicated to current standards (approximately 7800 itenu). The parpose of the evaluation is to provide reasonable assurance that there have been no identP'-ed problems which would indicate that a component may not be suitable for service.

2.0 Corrective Action Plan The evaluation process foi com aercial grade material will establish the acceptability of stored commercial grade material based on documented perfornnnce history and analysis (as required).

The process flow is presented in Figure 2-1 The evaluation of commercial grade items has tive key tasks including development of iteni groupings, development of historical performance evaluations, evaluation of problem items, performance of economic screens, identitication of attributes for scritication of problem items, and performance of dedication evaluations in accordance with DLCo dedication procedures.

11em Grouping Using the download (s) of stock item information obtained from DLCo, the 7,784 line items will be grouped. At a minimum, a group will be established for each NPRDS component code. Additional groups wih be developed as appropriate

~

using three criteria:

Functiem Materials performing similar sa%ty functions or integral to the performance of safety functions may be grouped together. Unique operating conditions and qualitication requirements will also be considered.

Functional groupings may be subdivided as necessary to reflect independent or dissimilar subsystems.

Complexity The extremes of design complexity and ditticulty in verifying the design characteristics of items will be considered when establishing an item grouping.

Manufacturer items may be grouped according to manufacturer depending upon past experience with supply chain 2

BEAVER VALLEY POWER STATION PAST PROCUREMENT REViliW PROJECT OUTLINE Manufacturer items may be grouped according to manufacturer depending upon past experience with supply chain integrity, manufacturer quality control history, presence at BVPS and industry experience with the manufacturer.

No single criteria takes precedence over the others. Each criteria will be applied based on prior experience and knowledge of industry concerns about commercial grade materials. The justification for the grouping approach is based on the relationship between function and critical characteristics. A written justification for the selection basis of each group will be provided with the documentation package for each group.

, orical Performance Evaluation g DLCo dedication evaluations will be distributed across these groups to

erize the groups using past DLCo dedication experience. If the current dedication experience (including acceptance history and consistency of the j channel) for any group is sufGeient to justify acceptability of the group, pistification will be documented and no further analysis will be required for nems within that group. Dedication performance expcrience with similar items at other nuclear utilities may also be employed, when awailable, to support justiGcation for acceptability of a material group (provided outside utility efforts meet DLCo requirements).

Remaining groups will be researched to identify any potential problems or materialissues from a review which will consider such sources as:

NRC Generic Letters, NRC Notices and Bulletins, o

NUREG-0040, 10 CFR 21 Reports, BVPS maintenance history, BVPS dedication history, BVPS receipt inspection experience, NPRDS failure data, and Other knowledge of problem manufacturers and equipment / item performance history.

Additional engineering judgemet may be applied to each grouping, considering such issues as the simplicity or complexity of the item, the importance to safety, and the conformance to recognized industry codes and standards.

3

S BEAVER VALLEY POWER STATION PAST PROCUREMENT REVIEW PROJECT OUTLINE Results will be documented for each group, establishir.g a sound technical basis for acceptance of the group (and each item within the group).

Preblem [1 gnu r

items or groups for which an acceptable performance record cannot be established will be subject to further evaluation. The first phase of this evaluation will be to determine the extent to which any of the identified problems applies to the item or group. This decision will not be based on percentages of failures within a group, but rather, will consider the number of failures, the nature of the failures, the speciGe items which failed (manufacturer, application and complexity), and implications on material quality.

Problems identified in NRC notiGcations and other industry sources which correlate to DLCo problems will be investigated to determine past corrective actions by DLCo. Documented justification for acceptability will be provided for items where the identified problems can be demonstrated as not being applicable to the subject group.

Economic Screen When an identiGed problem is determined to be applicable to an item or group of items, an economic screen will be applied to de:ermir,e if further evaluation is cost justiGed. The economic screening criteria will be based on the inventory value of existing inventory as gauged by four criteria:

Criticality ofintended safety related application (s),

e Issue history, e

o Material dollar value, and e

Lead time for new procurement.

Specific circumstances related to any one of these criteria may be adequate basis for centinuing the material evaluation process.

Attribute Verification For items or groups of items which pass through the economic screen, an evaluation will be performed to identify attributes for verification which are critical to the problem resolution. When required for problem resolution, the determination of critical characteristics for acceptance will be related to the item's identified safety function. Only attributes identified as a result of performance 4

'11EAVER VALLEY POWER STATION PAST PROCUREMENT REVIEW PROJECT OUTLINE history weaknesses will be identified, unless the scope and frequency of problems suggests a more generic material quality concern.

Results will be documented for each group of items which documents a sound technical basis for acceptance of the group (and each item within the group) with no further evaluation.

Dedication Dedication of remaining items will be performed in accordance with DLCo

~

Procedure NPD 40.0, Sampling plans proposed for verification of critical characteristics w;ill be based on the methodology described in EPRI NP-7218.

Each step is progressively more detailed, thorough and item specific. At any point, the techriical evaluator may determine that the process N established reasonable assurance of an items suitability for service and no further investigation will be conducted at this time.

.g a

4 5

BEAVER VALLEY POWER STATION PAST PROCUREMENT REVIEW PROJECT OUTLINE i

Ficuat 21 EVALUATION METHODOLOGY ASC 11 Dowstoro 9500 litus i

Dtvrtort litu Gaouriscs 140 Gaours I

DisTassuit ExisTisc 1350 Droicatics EvatuArious INTo Gaot,rs l

Ptaromu Paoovct Histoat Review DocoutNT

{ Gaours Disrosniosto l Disposmow Dots No Paosttu

-J, litus Disrosmo%to l Aertv l Yts Ptaroeu Economic

' litus Disposmosd ScatIN l

Prosttu Resolunos Omtort ATTatsuTis f 04 VtafflCATioN oN Paosttu Ittus l

Vtalry ATTaisuits Rivitw & Docuutst Resutts l

ITIus

, Discosmouto 6

BEAVER VALI.EY POWEk STAT 7N PAST PROCl;REMENT REVIEW PROJECT OlIT!.lNE References 1) 10 CFR 21 2) 10 CFR 50 Appendix B 3)

NRC Generic Letter 89-02 4)

NRC Generic letter 91-05 5)

NRC Assessment Report Numbers 50-334/91-201 and 50-412/91-201 6)

EPRI NP-5652 (NClG 07) 7)i 1,faintenance Rule