ML20091M612

From kanterella
Jump to navigation Jump to search
GFE Results, March 2020
ML20091M612
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/26/2020
From: Patricia Pelke
Operations Branch III
To: Pullam A
DTE Energy
Pelke, Patricia
References
Download: ML20091M612 (2)


Text

March 26, 2020 Mr. Andrew Pullam Director - Nuclear Training Fermi Power Plant DTE Energy Company 6400 North Dixie Highway Newport, MI 48166

Dear Mr. Pullam:

On March 4, 2020, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees at your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A P in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an F indicates that the individual failed the exam.

If you have any questions concerning this examination, please contact Mr. Eric Cushing at 301-415-1064, or e-mail at Eric.Cushing@nrc.gov.

Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 Enclosures (Non-Public):

1. Examination Results Summary for Fermi Unit 2
2. Copies of each candidates individual answer sheet
3. Examination Answer Key Patricia J.

Pelke Digitally signed by Patricia J. Pelke Date: 2020.03.26 16:24:05 -05'00'

A. Pullam DOCUMENT NAME:

Fermi GFE Results March 2020.docx TEMPLATE# NRR -115 OFFICE RIII/DRS/OB:OLA RIII/DRS/OB:BC NAME CSchmidt CS PPelke PJP DATE 03/24/20 03/26/20 OFFICIAL RECORD COPY