Responds to NRC Re Violations Noted in IE Insp Repts 50-443/83-14 & 50-444/83-11.Corrective Actions: Affected Terminals Reworked to Original Design.Sampling Insp of Addl Cable Terminations Conducted
ML20083E142
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 11/03/1983
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, YANKEE ATOMIC ELECTRIC CO.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20083E114 List:
References
SBN-578, NUDOCS 8312280472
Download: ML20083E142 (3)


Text

,

1 SENM SMM IPUBLIC SERVICE Engineering ONice:

Companyof New Hampshre 1671 Worcesw Road Framingham, Mossochusetts 01701 (617) - 872 - 8100 November 3, 1933 SBN-578 T.F. B4.2.7 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Attention:

Mr. Thomas T. Martin, Director Division of Engineering and Technical Programs Re ferences :

(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) USNRC Letter, dated October 5,19d3, " Inspection No. 50-443/83-14 and 50-444/83-11", T. T. Martin to R. J. Harrison

Subject:

Response to Inspection Report Nos. 50-443/83-14 and 50-444/83-11

Dear Sir:

In response to the violation which you reported in the subject Inspection Report, we offer the following:

NRC Notice of Violation (443/83-14-01):

10 CFR 50, Appendix B, Criterion X, and the Seabrook Station Final Safety Analysis Report, Section 17.1.1.10, require inspections be performed of activities affecting quality to verify conformance with documented procedures and drawings.

Contrary to the above, es of August 19, 1983, proper inspection of an activity affecting quality to verify conformance with documented procedures and drawings was not performed in that selected terminations of electrical conductors did not meet the requirements of United Engineers and Constructors Drawing 9763-M-300230, " Wiring Systems Notes and Typical Details," and Fischbach-Boelos-Manzi Quality Control Prceedure 505, " Quality Control Procedure for Installation of Cable Terminations," and had been inspected and accepted as satisfactory by Quality Control personnel.

This is a Severity Level V violation (Supplement II).

8312280472 831202 PDR ADOCK 05000 0

United States Nuclear Regulatory' Commission November 3, 1983 Page 2

Response

Corrective Action Tuken and Results Achieved:

The violation noted by the inspector wa:' incorporated by the electrical installation contractor (FBM) into NCR #406. The NCR disposition requires reworking of the affected terminals to restore them to the original intended 4

design, t

A sampling inspection of additional cable terminations is being conducted to determine if the problem is localized. Retraining sessions were conducted for inspection and craft personnel covering the requirements for cable terminations.

Corrective action will be completed by November 15, 1983 Very truly yours,

- YANKEE ATOMIC ELECTRIC COMPANY

</ )

John DeVincentis Project Manager AL/1jb cc: Atomic Safety and Licensing Board Service List i

I l

i i

l l

-. =. -

William S. Jsrd:n, III, Esquir3 Erantwood Board of Salsetmen Harmon & Weiss RED Dalton Road

'1725 I Street, N.W. Suite 506 Brentwood, New Hampshire 03833 Washington, DC 20006 Roy P. Lessy, Jr., Esquire Office of the Executive Legal Director Edward F. Meany U.S. Nuclear Regulatory Commission Designated Representative of Washington, DC 20555 the Town of Rye 155 Washington Road Robert A. Backus, Esquire Rye, NH 03870 116 Lowell Street P.O. Box 516 Calvin A. Canney Mancehster, NH 03105 City Manager City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Department of the Attorney General Augusta, ME 04333 Dana Bisbee, Esquire Assistant Attorney General Mr. John B. Tanzer Office of the Attorney General Designated Representative of 208 State House Annex the Town of Hampton Concord, NH 03842 5 Morningside Drive Hampton, NH 03842 Anne Verge, Cha'irperson Board of Selectmen Roberta C. Pevear Town Hall Designated Representative of South Hampton, NH 03S42 the Town of Hampton Falls Drinkwater Road Patrick J. McKeon Hampton Falls, NH 03844 Selectmen's Office 10 Central Road Mrs. Sandra Gavutis Rye, NH 03870 Designated Representative of the Town of Kensington David R. Lewis, Esquire RFD 1 Atomic Safety and Licensing Board East F.ingston, NH 03827 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Jo Ann Shotwell, Esquire Assistant Attorney General Mr. Angie Machiros Environmental Protection Bureau Chairman of the Board of Selectmen l

Departmenc of the Attorney General Town of Newbury l

One Ashburton Place,19th Floor Newbury, MA 01950 Boston, MA 02108 l

Maynard B. Pearson Senator Gordon J. Humphrey 40 Monroe Street I

U.S. Senate Amesbury, MA 01913 Washington, DC 20510 (Attn: Tom Burack)

Senator Gordon J. Humphrey i

1 Pillsbury Street l

Diana P. Randall Concord, NH 03301 70 Collins Street (Attn: Herb Boynton)

SEabrook, NH 03874 Richard E. Sullivan, Mayor l

Donald E. Chick City Hall Town Manager Newburyport, MA 01950 Town of Exeter l

10 Front Street j

Exeter, NH 03833 i

,a

-.-