Text
v 3
OPERATING DATA REPGRT SG-247 DOCI'l.T NO.
p,g7 g I-4-u 8
CCMPl. Ell !a llY M. Blatt TELI.Pl!ONE 914 06-?127 OPT. RAT!NG ST ATUS Notes Indian Poitit Unit #2
- 1. Unit Name.
December 1083
- 2. Reportin; Period:
2758 Perfonrance statistics for
- 3. Licensed Thermal Power Of WO:
1011 1983 best since Unit began
- 4. N:mep!ne Ratin; 1 Grow SIWel:
ccmercial service.
873
- 5. Ocsign Ele-trical Rating (Net afWc):
900
- 6. Maximu:n Dependab!e Capacity (Gross MWe):
FM
- 7. Maximurn Depeadab!c Capacity (Net SIWE):
- 8. If Chan;;es Occur in Capacity Ratings (Items Number 3 Throu;;h 7) Sir.ce Imt Report. Giu Reasons:
N "*
- 9. Pewer Lese!To Mich Restricted.lf Any(Net SIWE):
Sna
- 10. Reasons For Restrictions.If Any:
This Month Yr to-Data Cumvbti.e 744 8760
'83305
!!. !!ours in Reporti::;Perind 744 7789.54 55947.22
- 12. Number OfIlouri Rcetor Was Critica 0
541.22
?!10.71
- 13. Reactor Resene Shutdown lleurs 744 715A 40 54to8 7n
- 14. Ilours Generator On.Line 0
0 0
- 15. Unit Resene Shutdown Hours 2034329 19604223 141040899
- 16. Gross Thermal Energy Generated (MWil) 650780 6154850 43657576
- 17. Gross Electrical Energy Generated (SIWill 626860 5895035 41627092
- 18. Net E!cetrical Energy Generated 151Wil; 65.1 100 84.0
- 19. Unit Senite Factor 100 84.0 65.1
- 20. Unit Asailability Factor
_1!
c 47 9 79 A
- 21. Unit Capacity factor IUsing MDC Net) 96.5 77.1 57.2
- 22. Unit Capacity Faetor IU>ing DER Neti O
A0 0?
- 23. Unit Forced Onuye Rate
- 34. Shutdown.SeheJuled Oser Nest 6 Months IT pe. Date,and Duration of Facht:
3 10 year. Inservice Inspection / Refueling outage scheduled to begin Mav 15. 1984.
- 25. If Shut Down 4: I1J Of lieport Period. E.stinuted Date of Startup:
Forecast Achiesed
- 26. 03.its in Te.t Status (Prior to Conunercial Operation s:
INITITL C11111C \\1.11Y WA
\\
\\
INITI\\l.1II C11tlCl Y
\\
\\
0 0\\l\\l1'1101\\1 OPl ItT IION s
s 8402010140 031231 gDRADOCK 05000247 g2.4 ewI eor
AVERAGE DAILY UNIT POWER LEVEL s
DOCKET NO.
50-247 o
I. P. Unit # 2 UNIT D % TE I/4/64 M. Blatt COMPLETED BY TELEPflONE 914 526-5127 December 1983 MONDI DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe Net)
I 848 17 852 831 2
18 853 4
3 847 19 850 4
849 20 834 852 5
21 851 6
850 22 774 7
852 23 707 3
853 24 852 9
852 845 25 10 850 26 949 is 850 27 853 12 8 51 23 853 13 850 850 29 14 8 51 30 853 851 g$
31 852 f
16 851 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute to the nearest whole rnegawatt.
(9/77)
I
.o DOCKET NO.
50-247 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME I. P, Unit 2 DATE 1 / /> I o r-DU- -
~
REPORT MONTil DECEMBER TELEPIIONE "14 Ofi-5127 i
i ca.
E c
,$g 3
$.Y 5 Licensee jt jg Cause & Correcti..
No.
Date g
3g i
2s5 Event g7 g3 Action to I-
$5 5
j#3 g Report #
in U O
Present Recurrence g
6 N/A 12/22/83 S
N.A.
B N.A.
None Ch Valvex F Feedwater Reg. Valve Repair and Turbine Valve Testing i
1 I
I I
l h
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions l
S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LERI File tNUREG-D-Regulatory Restriction 4 Other (Explain) 01611 1
E Operator Trainiug & Ucense Examination i
F-Administrative 5
G-Operational Error (Explain)
Exhrbit I-Same Source to/77)
Il-Other (Explain)
I
Docket Non. 50-247 Completed by: M. Blatt Telephone No. (914) 526-5127
SUMMARY
OF OPERATING EXPERIENCE REPORT Unit 2 operated at 100% reactor power from the beginning of the report period, except for three brief reductions in power.
An automatic runback to 82% reactor power occurred on December 2 at 2130 due to failure of No.
24 static inverter, causing a spurious signal in the Nuclear Instrument System Dropped Rod Runback protection circuitry.
On December 20 at 0110, an automatic runback to 85% reactor power occurred due to a loss of power to a protection channel during performance of-a surveillance test.
On December 22 at 2100, reactor power was reduced to 11% to perform a monthly surveillance test on the Main Turbine Control and stop Valves and to perform corrective maintenance on No.
22 main feedwater regulatory valve.
Unit 2 performance statistics for the 1983 calendar year set new records l
l for the plant in the areas of Gross Generation, Net Generation, Unit Heat j.
Rate, Capacity Factor and Availability Factor.
sp' l
Docket No. 50-247
.l Dated 1/9/83 F
l CcapletM by: M.'Blatt December,.1983 ni.
1 INDIAN POINT UNIT NO. 2 I
w Mechanical'and Electrical Maintenance
' MWR--
SYSTEM COMPONENT CORRECTIVE ACTION DATED 1743 HVAC Vent Duct Installed Missing Duct Work 09/07/83 I
3832' EDG-Air System Replaced Valve 09/13/83
-Relief valve 4701 APW Valve BFD-71-1 Replaced Valve 09/08/83
- 8100.CVCS
- 21 Hot Sample
. Replaced Valve 09/09/83 Valve 9367 CVCS
- 21 Seal.In-..
Changed Filters 09/01/83 jection Filters 9370 SW Valve SWN 41-1B Adjusted Switch Limits 09/07/83 9488 -CVCS
- 21 Charge Pump Repacked Pump 09/02/83 9613 EDG
- 21 EDG' Replaced Blower 09/16/83
- 9640 EDG
- 211BATP Replaced Seal 09/12/83 9736
.SW
- 22-SWP:
Unplugged Line 09/20/83' 9811-RM Hoses Rll/R12 Repaired Hoses
~ 09/29/83
~ 9817'.CVCS FCV-Il0B Replaced Diaphragm 09/26/83 9817 CVCS FCV-110B Changed Diaphragm 09/29/83
'9865-.SE
- 26 SWP Repacked Pump 09/28/83
~ 6446 CVCS Valve 227 Repacked valve 10/18/83
- 7131 HVAC Valve 1293A Adjusted Switches 10/21/83
- 7670- lSW Valve SWN-1 Repaired valve 10/15/83 7673 SW
. Valve SWN1-3 Repaired Valve 10/13/83 7674 SW.
Valve SWN1-4 Repaired Valve 10/07/83 9394 SIS RV 855 Piping
. Installed Hanger / Clamp 10/01/83 9431 SW Valve SWN1-5 Repaired Valve 10/07/83 9970' RCS
- 23 RCP Repaired Seal 10/21/83
.10170.EDG
- 24 EDG Repaired Cooler 10/20/83
- 10191.RCS Valve 455A Repacked Valve 10/17/83
. 10192 RCS-Valve 525'
. Repacked Valve 10/17/83 i
~ 10205 n HVAC
- 25 FCU Repaired Motor.
10/19/83 10207 'ELEC EHT Circuit 20 Repaired Circuit 10/24/83 10214 ACS Valve 822A Lubricated Valves 10/19/83 I
.10226 CVCS
-Valve 4062 Repacked Valve 10/19/83 l
- 10227 CVCS Valve 261C Replaced Diaphragm 10/19/83 10229; CVCS-WHUP Transfer Pump Replaced Transformer 10/18/83 10275-SW
- 26 SPW Check Valve Repaired Valve 10/21/83
' 10281 IA
'#23 RCP Seal Bypass Replaced Regulator 10/24/83 Regulator-10291 HVAC:
- 22 FCU Cleaned Pilot 10/24/83
<ww2
1
.v j.-
~
MWR SYSTEM COMPONENT CORRECTIVE ACTION DATED
.10883 HVAC
- 24 FCU Inspected FCU's 10/19/83 10889 SW-421 FCU Repaired Leak 10/19/83 5470 ACS.
- 23 Component Overhauled Pump 10/06/83 Cooling Pump 6191 AFW BFD55 Valve Replaced Valve 10/24/83 6800 VC-25 FCU Inlet Valve Adjusted Limits 10/24/83 7015 HVAC Valves 1297/1297A Adjusted Limits 10/24/83 7671 SW Valve SWN1-1 Repaired *.'alve 10/15/83 7672
.SW Valve SWN1-2 Repaired Valve 10/19/83 8230 HVAC
- 24 FCU Inspected Valve 10/24/83 8554
.CVCS Valve 201 Repacked Valve 10/19/83 8587 FW Valve PCV 417 Repacked Valve 10/05/83 8589 FW Valve PCV 427 Repacked valve 10/05/83 8590 FW Valve PCV 437 Repacked Valve 10/05/83 9839 MRS Isolation Valves Greased Valves 10/04/83 1 and 2
,9909 SW
- 26 SWP Replaced Pump 10/07/83 9955 SW SWP 0031-005 Repaired MSR 10/24/83 9960 FW FCV-447 Repacked Valve 10/05/83 9972 RCS 21/22 S/G Removed / Replaced 10/24/83 Insulation 9973 RCS 21 S/G.
Replaced Manway Gasket 10/21/83 10010 CVCS Valve 267A Replaced Diaphragm 10/04/83 10013 SW
- 23 SWP Strainer Cleared Line 10/03/83 B/12 Line 10171 AN
- 23 ABFP Repaired Leak 10/11/83 10223 FW
- 24B FW Heater Repaired Leak 10/24/83 10225 W
- 21 FCU Replaced Outlet Valve 10/24/83
. Operator Pin 10304 RHR Valve 822B Adjusted Operator 10/24/83 10331 MRS Valve MS-1 Lubricated Valve 10/26/83
.10337 MRS -
Valve MS-1-1 Lubricated Valve 10/27/83 10354 RVI Head Insulation Repaired Insulation 10/20/83 10879 HVAC
- 21 FCU Water Boxes Inspected Unit 10/18/83 10880 RCS
- 22 S/G Replaced Gaskets
. 10/25/83 10881 HVAC
- 23 FCU Inspected FCU's 10/19/83 10062 HVAC
- 25 FCU Inspected FCU 10/25/83 10886 SW
- 21 to 25 FCU Replaced Flow Transmitters 10/19/83
-10895 RCS Pressurizer Replaced Manway Gasket 10/23/03 9315 IS
- 27 Traveling Repaired Screen 9/21/83 Screen 9409
-CVCS Valve 239G Replaced Bonnet 9/26/83 9473 SW
- 23 SWP Replaced Pump 9/9/83 9519 SW SWP 0031-008 Overhauled Pump 9/19/83 9520 SF
- 21 BATP Replaced Seal 9/28/83
,.e
-,--y
~,.,- -
nm
-..--,,.yu 4~n
i
' 7,,
n i
MWR' SYSTEM COMPONENT' CORRECTIVE ACTION
' p_ATED i
10287 RP First Stage
- Diode, RIAC, Capacitor 10/23/83 i'
Turbine Pressure Replaced; Bistable Re-calibrated 1
'10184 NIS NIS Channel 43 Replaced wet connector 10/26/83 inside VC 10213 NIS NIS Channel 44 Replaced wet connector 10/26/83 inside VC e
1.
r_m.
- l F
Instrunent And Controls Group
- Major Safety Related Corrective Maintenance MWR NO.
DATE COMPONENT SYSTEM CORRECTIVE ACTION a
10092 10/11/83
- 22 FCU Air Flow ESG Replaced Defective Air Flow Switch 9731 10/5/83 Rad Monitor R-ll RM Repaired Connector at Detector
- 10318, 10/25/83 Reactor Protection RP Replaced Relay Relay F3-X 10071:
10/11/83 Rod F2 Bottom Bistable RI Bistable Replaced 10061 10/11/83 Pressurizer Level LC-461A RCS Replaced Defective Diode,;
Resistor in Distable
{
9884 10/4/83 Reactor Protection RP Replaced Suspect Caps.cAtors 4.1d Controller QM-422A K1 Relay Within Controller 10219 10/16/83 Rad Monitor R-ll RM Replaced " Alarm Set Board' 10193 10/13/83 Rad Monitor'R-ll RM Replaced Defective Connector' 10305 10/27/83 Rad Monitor R-19 RM Dried out water found in Detector 7003 10/18/83 23RCP Seal Leak-off flow RCS Cleared Stuck Flow Element Transmitter 8381 9/20/83 Rad Monitor R-23 RM Replaced Defective Capacitor
John D. O'Toole V.ce Pres @ int j
Consohdated Edison Company of New York. Inc.
4 Irving Place. New York, NY 10003
~!'
Telephone (212) 460-2533 January 15, 1984 Re:
Indian Point Unit No. 2 Docket No. 50-247 Mr. William G. Mcdonald, Director Office of Management Information and Program Control c/o Distribution Services Branch, DDC, ADM Washington, D. C. 20555
Dear Mr. Mcdonald:
Enclosed you will find - two copies of the Monthly operating Report for Indian Point Unit No. 2 for the month of December 1983.
Ve truly yours, D
4, Encl.
cc:
Mr. Richard DeYoung, Director (40 copies)
Office of Inspection and Enforcement c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region I U. S. Nuclear Regulatory Constission 631 Park Avenue King of Prussia, Pa.
19406 e
Mr. Thomas Foley, Senior Resident Inspector U. S. Nuclear-Regulatory Cometission P. O. Box 38 Buchanan, New York 10511 P
//
-.~
.