WBM 10/28/80 h
UNIT 1 and COMMON STARTUP SCHEDULE MILESTONES 4
Beginning Pre-Turnover Test.ing January 15, 1981 ist Turnover May 1, 1981 Et:ergize 480V MCCs June 15, 1981 Cold Hydro February 1, 1982 Hot Functional June 1, 1982 Fuel Load November 1, 1982 Conr.iercial Ops May 1, 1983 8401100094 831011 f
,j
- --. r :
MBM S
PROCEDURE STATUS tm89 UNIT 1 & CO!!a:ON WATER RECLA11ATION (a)
TOTAL NU!JDER OF PROCEDURES, REQUIRED 772 83 FOR FUEL LOAD I.
i 3
l (b)
NU5:BER OF DRAFT PROCEDURES NOT STAT.TED 302 18 l'
(c)
NU5fDER OF DRAFT PROCEDURES REING WRITTEN 18 9
1 I
O 34 (d)
NU5:BER OF PROCEDURES APPROVED
's (e)
NU!.!BER OF PROCEDURES IN REVIcw 41 8 56 I
i l
(f)
TOTAL NU?!IlER OF PREOP TESTS REQUIRED.
220 7
- i FOR FUEL, LOAD 0
0
!(g)
NtBIBER OF PREOP TESTS CO3fPLETED i
i}s (h)NUtBER OF PREOP TESTS CUllRENTLY IN O
Q PnOGRESS l-
,i
- (i)
NU!.!BEit OF SYSTEMS TURNED OVER TO STARTUP O
O
- L
}
mm PROCEDURE PREPARATION CURVE
'~ "
~.
REQUIRED 800 PROCEDURE APPROVAL 700
~
PROJECTED 600 ' PROCEDURE APPROVAL 500 400-SYSTE5!
, - TUltNOVER IIATE 300 t
i 200
.\\CTUA.L j.
,100- f
.i gg 2/1/82 11/1/82
/
S/1/ 31 COIJ) 6/1/82
- FUCI, FS,TO IlYDitO IIFT I.OA D 4
OCT JAN APR JUL OCT JAN APR JUL OCT J A.i APR 80 81 81 81 81 82 82 82 82 S3 83
UBMo
"*# }
STARTUP M ANPOWER REQUIREMENTS UNIT 1 & CO?!!GN WA'1ER' RECLAMATION TOTAL CURRENT l PROPOSED CURRENT PI:oPOSED CURRENT PROPOSED l:
i i
suPEnvisons 7
9 2
2 9
11 l'
s/U ENGINEERS 18 70 6
20 24 90
,m sysTEu COORDINATORS 21 40 9
9 30 49 a
I sTARTUP CRArr SUPPORT 17 159 4
CLERICAr.
8 13 2
4 10 17 I
PRoGnAn ConTRob 3
7 1
4 4
11 i'
I 1
i TOTAL 57 139 20 39 94 337 i
J j.
i
- ADDITIONAL PECIITEL CRAFTS AS NEEDED To SUI'PLEMENT SUl'I' ORT h+
l
.