Forwards Scram Instrument Vol Diverse Instrumentation for Ja Fitzpatrick Nuclear Plant, Supporting Request That 801002 & 810109 Orders Re short-term Mods of Scram Discharge Vol Sys Be Amended or Lifted by 830630
ML20074A816
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/12/1983
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Harold Denton, Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
Shared Package
ML20074A817 List:
References
IEB-80-17, JPN-83-41, NUDOCS 8305160106
Download: ML20074A816 (2)


Text

.#

(

POWER AUTHORITY OF THE CTATE OF NEW YORK 10 COLUMaus CIRCLE N EW YORK. N.Y. l oo t 9 (212) 397 6200 LEnOY w. SimcLAin

",',*'.,*,[*,,',"f,'.

Tnu57EES JOHNS.DYSON W ALTER T ntCINSKI

'"~~~

O.'.".".*'..'l.*.....

G EO1GE L INGALLS

    • C8" May 12, 1983

....-a

OSE,N..ScNM,EoE.

'".'.[.'.'"..'"...

JFN-33-41 cacN A.D. n.,NN JAMIS L LAROCC A STEPHEN L BAUM KOLLAND E. KIDDER eo e.

cova.

Director of Nuclear Reactor Regulation Director of, Inspection and Enforcement U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation Mr. Richard DeYoung, Director,

Office of~ Inspection and Enforcement

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Scram Discharge Volume System Orders

References:

1.

NRC letter regarding I.E.

Bulletin No. 80-17 Confirmatory Order, V.

Stello to G.T.

Berry, October 2, 1980.

l l

2.

NRC letter regarding Order for Modification l

of License Concerining BWR Scram Discharge i

Systems, T.A.

Ippolito to G.T.

Berry, i

January 9, 1981.

3.

PASNY lette,r, J.P.

Bayne to T.A.

Ippolito, I

September 11, 1981 (JPN-81-69).

j D O f

Dear Sir:

l The NRC has issued two Orders relating to short-term modifications of FitzPatrick's scram discharge volume system.

The first required that the Authority " install and make operable a system to continuously monitor water levels in all scram discharge volumes" by December 1, 1980 (Reference 1).

The second required the installation of "an automatic system to initiate control rod insertion on low pressure in the control air header" by April 9, 1981 (Reference 2).

Both of these systems have been installed at FitzPatrick.

l 8305160106 830512 PDR ADOCK 05000333 i

P PDR 1

e In Reference 3, the Authority informed the NRC of plans to install long-term modifications to the scram discharge volume system that would render the existing air dump modification unnecessary. In that letter, we requested that you amend the January 9, 1981 Order to permit removal of the air dump modification contingent upon the completion of the long-term modifications.

We have not received a response to that request.

Long-term modifications of the scram discharge volume system are now scheduled for the forthcoming Reload 5/ Cycle 6 outage.

This outage is expected to start in early June of this year and to extend at least seventy-five days.

The planned modifications will improve scram discharge volume system hydraulic coupling by replacing the present instrument volume with two new instrument volumes, one for each of the scram discharge headers.

The size of the pipe from the scram discharge volume to the instrument volumes will be increased from two to ten inches.

In addition, each instrument volume will be equipped with redundant and diverse level instruments in a one-out-of-two-twice logic to prevent spurious scram signals.

A dercription of the differences between the FitzPatrick modification and the NRC's generic SER will be submitted under separate cover.

Proposed changes to the FitzPatrick Technical Specifications to address these modifications will also be provided separately.

As a result of these modifications, the Authority will remove both of the short-term modifications.

Therefore, we request that the NRC amend or lift its October 2, 1980 and January 9, 1981 Orders by no later than June 30, 1983.

Your prompt response to this request will allow us to make appropriate arrangements for our refueling outage.

j In support of this request, included with this letter is a report which describes the scram instrument volume instrumentation in greater detail.

If you need any further information, please contact Mr.

J.A. Gray, Jr. of my staff.

Very truly yours, J..P).'Bayne']~

s-

)

Executive Vice President Nuclear Generation cc:

Mr.

J.

Linville Resident Inspector U.S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming, N.Y.

13093