Forwards Rev 0 to, Core Operating Limits Rept for Peach Bottom Atomic Power Station Unit 2 Reload 8,Cycle 9
ML20070U751
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/04/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070U754 List:
References
NUDOCS 9104090301
Download: ML20070U751 (1)


Text

.

T8 '*9'l' PillLADELPillA Et,ECTRIC COMPANY NUCLEAR GROUP llEADQUAirfERS 955 65 C}lESTERilROOK IiLVD.

WAYNE, PA 19087 5691 (21$) 640-6(KK)

NUCLEAR ENGINEERINO & $1 RVICE3 DEfARTMENT April 4, 1991 Docket No. 50-277 Licenso No. DPR 44 U.S.

Nuclear Regulatory Commission Attn Document Control Donk Wauhington, DC 20SSS SUllJECT:

Poach 110ttom Atomic Power Station, Unit 2 Issuance of the core Operating Limits Hoport fc; Roload 8, Cyclo 9 Operation

Dear Sir:

Enclosed is a copy of the the core Operating Limits Report (COIJt) for Peach 11ottom Atomic Power Station (PBAPS), Unit 2, Roload 8,

Cyclo 9 operation.

This report providos the cyclo-specific paramotor limits fort Averago Planar Linear float Conoration Rato ( APLilGR) ; Minimum Critical Power Ratio (MCPR); Flow Adjustment Factor (K ); Linear llaat Concration Rato (IJIGR); and Rod Block Ponitor fich biased upscale sotpoints.

Thosn values have boon cotormined using NRC-approved methodology and are established such that all upplicable limits of the plant safety analysis are not.

This report is being submitted in accordance with the P11APS Unit 2 Technical Specifications (TS) Section 6.9.1.0 If you have any questions concerning this submittal, pleano do not hesitato to contact us.

Sincoroly, (bcAdde ht G. J. Ilock Managor, Licensing Nuclear Engineering and Services Enclosure T. T. Martin, Administrator, Region I, USNRC cc: