'i*
4 Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 192'7 Telephone (612) 330-5500 July 15, 1994 l
U S Nuclear Regulatory Commission l
ATTN Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket No. 50-263 License DPR-22 Prairie Island Nuclear Generating Plant Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Confiauration Manecement Procram Six Month Status Report In our letter dated November 13, 1989, and at a meeting with the NRC on December 14, 1989, NSP agreed to provide semi-annual status reports to the NRC on the progress of the Configuration Management Programs at Monticello and Prairie Island. This letter, tid attachments, provides our status through June 30, 1994.
Please contact us if you have any questions concerning this report. Mr Patrick Burke (Monticello) at (612) 295-1661 or Mr George Aandahl (Prairie Island) at (612) 388-1121, extension 4702, may be contacted directly regarding plant specific questions.
This letter does not contain any new NRC commitments.
gv-Roger O Anderson Director Licensing and Management Issues c:
Regional Administrator, Region III NRR Monticello Project Manager, NRC Monticello Sr Resident Inspector, NRC NRR Prairie Island Project Manager, NRC Prairie Island Sr Resident Inspector, NRC T Martin, NRC M Phillips, NRC j
I Yin, NRC Attachments:, Monticello CM Program Status, Prairie Island CM Program Status
/*
FDs: MDD45eMOPrnu(ANRCCORRC)Nn0UR.6h40
%w.
~
e.
9407250190 940715 PDR ADOCK 05000263
\\I P
PDR q\\
l L
i,
~
l Monticello CM Status as of June 30,1994 1
Taraet milestones to be completed by December 31,1994:
Milestone Status 1.
Complete the 4 DBDs in review, 4 The 4 DBDs in review have been issued plus DBDs in preparation and 9 additional 1 of the 4 that were in preparation for a total of 1
DBDs to get all DBDs to Revision A 5 DBDs completed in the first half of 1994.
status (pre verified).
Currently,1 DBD is in review and 5 are in preparation.
2.
Complete the 3 DBDs in process of One of the 3 DBDs have been revised and being revised.
Evaluate others for issued. The other 2 are in process.
revision.
Status of the Follow On item Proaram:
See attached line graph and pie chart.
1, 713 FOls identified.
2.
639 FOl assessments complete (includes all FOls except those that are screened, whose assessments are in progress).
3.
495 FOls closed (all corrective actions completed).
4.
There was one License Event Report (LER) as a result of FOl review.
LER 94-001 Missed Surveillance Due To Procedure Error.
Onaoina Activities:
1.
Identification of licensing commitments within licensing correspondence.
To date have identified 2469 commitments.
2.
Entering plant documentation into the Design Basis information System (DBIS).
As of June 30,1994, approximately 51,100 documents have been entered. Continued to review Bechtel turnover documentation focusing on calculations, specifications and correspondence.
3.
Identification and assessment of Follow-On items (FOls). Implementation of FOI corrective actions.
4 I
MNGP FOI PROGRESS June 1990 thru June 1994 FOI TOTAL 800 600
/
'~~,
~
400
/
/
,~
//
/
j?
?
F 200 xsc
=
m f
/
9(-------
0 JASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJ l
90 l
91 l
92 l
93 l
94 l
DATE FOls Assessed (639)
IN Progress (74)
FOls ident. (713)
Prepared By MNGP Safety Assessment Group
1 4
MXGP Follow-On Item Status
~
June 1990 Thru June 30,1994 FOIs Identified = 713 (3 Month, 24 Year)
SCREENED 45 6%
ASSESS IN PROGRESS 29 4%
GROUP REVIEW 17 2%
~ S
- COMMITTEE APPROVAL 17 2%
l i
I COM P/ ACTIONS 111 16 %
/
CLOSED 495 69%
Prepared by MNG P Safety Assesamment G rou p 4
Prairie Island CM Status as of 6-30-1994 Large13filestone to be completed by December 31.1994 Milestone Status Perform DBD preparation and Verification Five of the remaining DBD's are completed activities consistent with completion of ten and verified. Draft DBD's exist or are in additional DBD's by the end of 1994.
various stages of review for the remaining DBD's. All of the remaining DBD's are This target supports satisfaction of NSP's expected to be developed, verified, and issued original commitment regarding DBD before the end of 1994.
production. Note that this target was previously listed as eleven DBD's but that Internal IIazards and External 11azards are being combined into one topical DBD.
Status of the Follow-On-Item Technical Assessment Program:
(See attached chart.)
- 1. There have been 873 Follow-On-Items (FOl's) identified and prioritized.
- 2. The technical assessment of 843 of the FOl's is complete.
- 3. Actions to close out 578 FOI's are complete. Note that the FOI's are not considered closed out until either all recommendations are actually performed or resolved, or the actions have been prepared and have entered a controlled administrative process (for example the procedure revision process).
- 4. There were two high-priority FOl's in the assessment process on July 5,1994.
- 5. During the first half of 1994 there was no new Licensee Event Report relating to FOl work.
Status of Onuoine Configuration Management Work;
- 1. The P1 Design Standards section is continuing to support a project to improve site electrical drawings and development cf the site Engineering Manual. The first volume of this manual was issued in 1992, and development has continued. There are now two volumes containing a broad range of practical guidance.
- 2. An initiative is in progress to review early Prairic Island licensing correspondence for identification of commitments. Commitments are documented and researched to verify appropriate disposition. Prairie Island is presently tracking 1217 commitments to the NRC.
Prairie Island CM Status as of 6-30-1994 3.
Modifications and non-modification Safety Evaluations are reviewed for consistency with the documented design basis. During the first half of 1994 there have been a total of 34 modifications and 19 safety evaluations reviewed.
4.
Prairie Island Configuration Management engineers are continuing to revise previous DBD's to incorporate new modifications, regulatory matters, and closure of Open Items.
Three revised DBD's have been approved during the first half of 1994.
~
~
l l
PRAIRIE ISLAND PLANT FOI TRACKING STATUS j
7-5-1994 l
l i
800 700
+
r 600 4
P 75 i
500 5%
l
}.y
~,
en
.9 400 ~
~
'i 5
~%5 b?$
JA By 49 g#
300 --
m3
$5 k
$lgy
.: =<
M F
sg 00 ~
'l?/ 9 72W Nk.k
. +1
,22 i
i;d
%~,,k 4
gn g
T V
J Lte iJ;j 100 -
(wy I--
h.,,
s >n c
- p p.;
~,;a i
- ..g
.:n y<
..a r 7-;,
+
0 -
A=-
E-
~
JUN91 DEC91 JUN92 DEC92 JUN93 DEC93 JUN94 E FOrs PRIORITIZED 0 FOl's ASSESSED D FOrs CLOSED OUT E PRIORITY iN REV!EW
.