Text
.
g*ga Coq [g
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
i
{
j .r. (
g
REGION 111
.: c
799 ROOSEVELT ROAD
o,
[
GLEN ELLYN. ILUNOIS 60137-5927
%,
f
- "**
f&, L
1993
Docket lio. 50-455
Commonwealth Edison Company
ATT!4:
Mr. L. O. DelGeorge
Vice President
fluclear Oversight and
Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
This refers to the inspection conducted by Mr. J. F. Schapker of this office
on September 21 through October 20, 1993. The inspection included a review of
inservice inspection activities at your Byron fluclear Power Station, Unit 2.
The findings were discussed with those members of your staff identified in the
enclosed report at the conclusion of the inspection.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with fiRC requirements,
lio violations of f4RC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the f4RC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
k
G. C. Wright, Chief
-
Engineering Branch
Enclosure:
Inspection Report
fio. 50-455/93014(DRS)
See Attached Distribution:
9311160105 931109
ADOCK 05000455
g
G
PDR.
Pab42-1470/
. ..
-
-
. ,
. =
..
--
-
_.
t
.
,L
t
,
i
Commonwealth Edison Company
2-
Nay'e
'iB93-
i
DISTRIBUTION
!
I
cc w/ enclosure..
,
K. Graesser, Site Vice
' i
President
'
G. Schwartz,. Station Manager
D. Brindle, Regulatory Assurance
1
Supervisor
D. Farrar, Nuclear Regulatory
Services Manager
!
OC/LFDCB
Resident Inspectors-Byron,
'
Braidwood, Zion
.i
Richard Hubbard
'
J. W. McCaffrey, Chief,
Public Utilities Division
.
Licensing Project Manager, NRR
,
Robert Newmann, Office of Public
'!
Counsel, State of Illinois Center.
i
'
State Liaison Officer, Wisconsin
State Liaison Officer, Illinois
Chairman, Illinois Commerce
.l
Commission
{
'I
- l
l
t
!
-
,
-
cj
!
-
!
'
,
I
i
!
!
l
!
1
o
.c
.
.
.
~.
,_
.
.
_
. - _ . _
_.
.