I J

Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330 5500 i

i I

September 2, 1993 10 CFR Part 2 Appendix C i

t U S Nuclear Regulatory Commission Attu:

Document Control Desk Washington, DC 20555 i

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Response to Notice of Violation NRC Inspection Report Nos. 282/93010(DRP) and 306/93010(DRP)

Licensed Operator Biennial Medical Examination Your letter of August 4, 1993, which transmitted NRC Inspection Report Nos.

282/93010(DRP) and 306/93010(DRP), requested a response to a violation. The following is offered in response to the violation.

Violation i

10 CFR Part 55.53(i) states that, "The licensee shall have a biennial

[

medical examination.

contrary to the above, during the period from March 22, 1989 to April 1, 1993, one of your operators, licensed pursuant to 10 CFR Part 55, did not i

receive a medical examination.

During this period of time, the subjec*

operator performed licensed duties at the Prairie Island Nuclear

{

Cenerating Plant as authorized under license number OP-30720, issued effective July 10, 1989.

i This is a Severity Level IV Violation (Supplement I).

flest'onse to the Violation l

Backcround In June 1993, in response to a problem reported at another plant, we reviewed i

records associated with medical examinations for licensed operators. Our review turned up some discrepancies in our program; the discrepancies and

{Sn"*R8b8k 88888 % i

Rdd: /ElDett $@

i pf, PDR Q

f q

i l

=~

i O

I Nodhem Suites Power Company j

USNRC j

September 2, 1993 Page 2 l

corrective actions were communicated to Region III as documented in Inspection Report Nos. 282/93010(DRP) and 306/93010(DRP).

These discrepancies included l

the instance of a licensed operator whose medical examination interval had i

exceeded the allowable interval by two years and two instances in which the medical status of licensed operators had changed (to require corrective lenses) without notifying the NRC per 10 CFR 55.25.

Revised NRC Forms 396 i

were submitted for these two operators.

Since then we have discovered another instance in which the medical status of a licensed operator had changed (to require corrective lenses) without notifying the NRC per 10 CFR 55.25. lua NRC Form 396 for this operator is being submitted to the Regional Administrator i

under a separate letter.

Reasons for Violation l

l The violation occurred for several reasons:

1 Inadequate communication between the corporate medical department and j

training center personnel responsible for scheduling medical j

examinations.

i i

r Inadequate detail in procedures for tracking, scheduling, and reporting of medical examination status.

e 5

Inadequate supervisory review and oversight of the medical examination e

e process.

4 Corrective Steps Taken and Results Achieved l

l j

A review of the medical records was performed to determine compliance with the regulations and the results are discussed above and in Inspection Report Nos, j

282/93010(DRP) and 306/93010(DRP).

The subject operator received a medical examination on April 1, 1993.

The operator was determined to be fully qualified.

Corrective Steps to Avoid Further Violations i

J The procedure for license applications, renewals, and medical examinations has been revised to identify responsibil tles for tracking, scheduling, and reporting of medical examination status.

The procedure includes supervisory responsibility for review of the process and results.

i This violation will be discussed with all licensed individuals to convey their responsibility for ensuring the required medical examinations are obtained.

j This will be completed by September 24, 1993.

In addition, an internal audit (AC 93-27-20, Medical Evaluations) is currently being performed by the Quality department. Any program deficiencies (beyond l

those already identified and corrected for) identified by this audit will be corrected in accordance with our Corrective Action program as appropriate.

. ~.,

p

.s

--a

. =....

i e

t I

e s

Nodhem Sutes Power Company l

USNRC

)

September 2, 1993

[

Page 3 Date When Full Compliance Vill Be Achieved j

full compliance has been achieved.

[

In this response, we have made the following new NRC commitments:

I.!

6 This violation will be discussed with all licensed individuals to convey their responsibility for ensuring the required medical examinations are i

obtained. This will be completed by September 24, 1993.

j i

l Any program deficiencies (beyond those already identified and corrected i

for) identified by this audit [AG 93-27-20] will be corrected in j

accordance with our Corrective Action pre: cam as appropriate.

j Please contact Jack Leveille (612-388-3962, Lxt. 4662) if you have any questions related to our response to the subject inspection report.

)

f"

^

i Lad [Mkp Douglas D Antony l

Vice President Nuclear Generation i

I a

c: Regional Administrator III, NRC l

Senior Resident Inspector, NRC

]

NRR Project Manager, NRC i

J E Silberg i

i l

.i i